FBO_SpecialNotice.doc

DOC document 23 KB Posted

Attached to
Power Distribution Upgrade Federal contract opportunity
Solicitation number
GS-08P-10-JE-C-0004
Issued by
General Services Administration Public Buildings Service Region 8

About this file

Pre-solicitation notice for power distribution upgrade electrical design project located at Tinker Air Force Base Oklahoma

View the file

Other files for this federal contract opportunity

Other files attached to Power Distribution Upgrade, newest first.
File Type Posted
GS08P10JEC0004 A0005.pdf PDF
GS08P10JEC0004 A0004.pdf PDF
GS08P10JEC0004 A0003.pdf PDF
GS08P10JEC0004 A0002.pdf PDF
GS08P10JEC0004 A0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Solicitation Notice

GSA Solicitation for Electrical engineering and design services

C—Architect and engineering services, Solicitation Number GS-08P-10-JE-C-0004

Contracting Office Address

General Services Administration, Public Buildings Service, (8PSD), Denver Federal Center, West 6th Avenue and Kipling Street, Building 41, Denver, CO, 80225

Description

GSA Solicitation for Electrical engineering and design services

C-Architect-Engineer Services Solicitation Number GS-08P-10-JE-C-0004

Region: 08

Location: Tinker Air Force Base

State: Oklahoma

Contracting Officer: Heidi Sawyer

Phone Number: (303) 236-5032

PROJECT: Design – Power Distribution Upgrade

BUILDING TYPE: NA

PROJECT TYPE: Architect and Engineer HISTORIC STRUCTURE: No

CLIENT AGENCY: Defense Information Systems Agency

SIZE: NA

PARKING SPACES: NA

BUDGET: Between $500,000 and $1,000,000 ESTIMATED COST OF CONSTRUCTION: Between $7,000,000 and $13,000,000 FUNDING: Funds are currently available for design award in Fiscal Year 2010

GEOGRAPHIC LIMITATION: None

SMALL BUSINESS SET ASIDE: Small business

Project Description

This project is located at Tinker Air Force Base, Oklahoma. It includes design of a new utility feed configuration, 480V electrical studies, in support of design for a fully redundant (2N) electrical system.

The project involves design of utility circuit and 480V electrical distribution system upgrade at Tinker AFB. This design phase will consist of planning, preliminary design, and construction document completion. Consideration may be given to future Contract Administration services depending on funding, quality of design, and design services..

Note: this marks the end of information to be provided in the Synopsis. Information below will be provided upon posting the solicitation / request for qualifications which will be posted on or about December 30, 2009.

File details come from the government source that posted it. Updated .