FBO_SpecialNotice.doc
DOC document 23 KB Posted
- Attached to
- Power Distribution Upgrade Federal contract opportunity
- Solicitation number
- GS-08P-10-JE-C-0004
About this file
Pre-solicitation notice for power distribution upgrade electrical design project located at Tinker Air Force Base Oklahoma
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| GS08P10JEC0004 A0005.pdf | ||
| GS08P10JEC0004 A0004.pdf | ||
| GS08P10JEC0004 A0003.pdf | ||
| GS08P10JEC0004 A0002.pdf | ||
| GS08P10JEC0004 A0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Solicitation Notice
GSA Solicitation for Electrical engineering and design services
C—Architect and engineering services, Solicitation Number GS-08P-10-JE-C-0004
Contracting Office Address
General Services Administration, Public Buildings Service, (8PSD), Denver Federal Center, West 6th Avenue and Kipling Street, Building 41, Denver, CO, 80225
Description
GSA Solicitation for Electrical engineering and design services
C-Architect-Engineer Services Solicitation Number GS-08P-10-JE-C-0004
Region: 08
Location: Tinker Air Force Base
State: Oklahoma
Contracting Officer: Heidi Sawyer
Phone Number: (303) 236-5032
PROJECT: Design – Power Distribution Upgrade
BUILDING TYPE: NA
PROJECT TYPE: Architect and Engineer HISTORIC STRUCTURE: No
CLIENT AGENCY: Defense Information Systems Agency
SIZE: NA
PARKING SPACES: NA
BUDGET: Between $500,000 and $1,000,000 ESTIMATED COST OF CONSTRUCTION: Between $7,000,000 and $13,000,000 FUNDING: Funds are currently available for design award in Fiscal Year 2010
GEOGRAPHIC LIMITATION: None
SMALL BUSINESS SET ASIDE: Small business
Project Description
This project is located at Tinker Air Force Base, Oklahoma. It includes design of a new utility feed configuration, 480V electrical studies, in support of design for a fully redundant (2N) electrical system.
The project involves design of utility circuit and 480V electrical distribution system upgrade at Tinker AFB. This design phase will consist of planning, preliminary design, and construction document completion. Consideration may be given to future Contract Administration services depending on funding, quality of design, and design services..
Note: this marks the end of information to be provided in the Synopsis. Information below will be provided upon posting the solicitation / request for qualifications which will be posted on or about December 30, 2009.
File details come from the government source that posted it. Updated .