ExhibitF-IDIQPriceProposalFormat.xls

XLS spreadsheet 78 KB Posted

Attached to
Construction MACC 8(a) Federal contract opportunity
Solicitation number
GS-08P-08-JB-D-0048
Issued by
General Services Administration Public Buildings Service Region 8

About this file

Exhibit F Bid Sheet for Sample Project

View the file

Other files for this federal contract opportunity

Other files attached to Construction MACC 8(a), newest first.
File Type Posted
8a bidders conference.pdf PDF
1442 Amendment.0003.pdf PDF
Questions Set 3.doc DOC document
1442 Amendment 0004.pdf PDF
ExhibitB-PastPerformanceQuestionnaireOfferor.doc DOC document
EXHIBITGWageDetermination.doc DOC document
1442Amendment0002.pdf PDF
E-400106E3.pdf PDF
A-COVER.pdf PDF
E-400106E4.pdf PDF
A-WALLSEC2.pdf PDF
A-REFCLGPLAN.pdf PDF
A-MILLWORK.pdf PDF
1442Amendment0001.pdf PDF
ExhibitGSpecs.pdf PDF
A-FLOORPLAN.pdf PDF
A-WALLSEC.pdf PDF
2008GSAIDIQSolicitation8(a)RFP.doc DOC document
M-1.pdf PDF
E-400106E2.pdf PDF
E-400106E1.pdf PDF
A-INTELEV.pdf PDF
8(a)IDIQMACCSolicitationGS-08P-08-JB-D-0048.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

GENERAL SERVICES ADMINISTRATION
IDIQ PRICE PROPOSAL / BID FORMAT
1442 Bid Schedule
PROJECT TASK ORDER #
SITE and BUILDING SHELL - ConstructionDate
Division
Item #DescriptionUnitCostQuantityTotalComments
1000GENERAL CONDITIONS%$ - 0*
1Project ManagerHrs$ - 0*
2SuperintendantHrs$ - 0*
Sub-Total$ - 0
2000SITE WORK / DEMOLITION
3Excavation (ext.utility work incl.backfill)Cu.Yd.$ - 0
4Interior DemolitionSqr. Ft.$ - 0
Sub-Total$ - 0
5000BUILDING & INTERIOR
5Exterior walls - furring & gyp.brd., 1 sideSqr. Ft.$ - 0
6Int.walls - gyp.brd. 2 sides to fram'g aboveSqr. Ft.$ - 0
7Standard WallsSqr. Ft.$ - 0
Sub-Total$ - 0
6000MILLWORK
8Base & Wall CabinetsL.F.$ - 0
9CountertopsL.F.$ - 0
10Wood baseL.F.$ - 0
Sub-Total$ - 0
7000INSULATION & SEALANTS
11Insulation (sound batts)Sqr. Ft.$ - 0
12Ceiling InsulationSqr. Ft.$ - 0
13Caulking & SealantsL.F.$ - 0
Sub-Total$ - 0
8000DOORS & WINDOWS (includes frames)
14Single, H.M. dooreach$ - 0
15Double, H.M. dooreach$ - 0
16Hardware (office keyed, lever, hinges)each$ - 0
17Interior Glass/SidelitesSqr. Ft.$ - 0
18Aluminum StorefrontSqr. Ft.$ - 0
19Interior wood birch doorseach$ - 0
page 1Sub-Total$ - 0
9000FINISHES
20Suspended Acoustical Grid including TileSqr. Ft.$ - 0
21Soffit framing & gyp.boardSqr. Ft.$ - 0
22Texture Ceiling and WallsSqr. Ft.$ - 0
23Paint including prepSqr. Ft.$ - 0
24Refurbish existing wood floorSqr. Ft.$ - 0
25CarpetSqr. Yd.$ - 0
26TileSqr. Ft.$ - 0
27BaseL.F.$ - 0
Sub-Total$ - 0
10000SPECIALTIES
28Toilet Partitions (per stall)each$ - 0
29Urinal partitionseach$ - 0
30H.C. Grab Bar seteach$ - 0
31Paper towel dispenser / waste receptacleeach$ - 0
32Toilet Paper dispensereach$ - 0
33Mirror / Shelfeach$ - 0
34Napkin Dispensereach$ - 0
35Soap Dispensereach$ - 0
Sub-Total$ - 0
11000EQUIPMENT
36Display BoardsL.S.$ - 0
37Audio-Visual Rough-ineach$ - 0
38TV / DVD Equipment (built-in)each$ - 0
Sub-Total$ - 0
15000PLUMBING (includes rough-in)
39Sinks (kitchen, bar, mop) incl. Faucetseach$ - 0
40H.W Heatereach$ - 0
41Water Closetseach$ - 0
42Urinalseach$ - 0
43Drinking Fountainseach$ - 0
Sub-Total$ - 0
15000HVAC (includes controls)
44Duct WorkL.F.$ - 0
45Diffuserseach$ - 0
46Return Air Grillseach$ - 0
47Roof Top Unitseach$ - 0
48Air Handling Unitseach$ - 0
49Curbs & Padseach$ - 0
50Exhaust Fans (including kitchen hood)each$ - 0
page 2Sub-Total$ - 0
16000ELECTRICAL
51Upgraded Service and PanelL.S.$ - 0
52Power DistributionSqr. Ft.$ - 0
53LightingSqr. Ft.$ - 0
54Fire Alarm / Smoke DetectionEa Zone$ - 0
55Telephone / DataSqr. Ft.$ - 0
Sub-Total$ - 0
$ - 0
Sub-Total Construction Cost$ - 0
1000GENERAL REQUIREMENTS
56Over Head%$ - 0$ - 0*
57Profit%$ - 0$ - 0*
58Bond%$ - 0$ - 0*
TOTAL CONSTRUCTION COST$ - 0
TOTAL CONSTRUCTION COSTSSqr.Ft.$ - 0$ - 0
page 3
NOTES
1*Denotes Line Items (rates) that will be utilized in the evaluation process as Fixed Line Item Costs
for the duration of the IDIQ Contract
2Line Item Descriptions are shown as an example only. Future Project Task Order will dictate the specific
Items required for any particular Project Price Proposal
3Spreadsheet may be expanded as necessary for CSI Divisions and/or additional line items
4The Price Proposal Format presented herein will be the only format accepted by GSA. This format will
also serve as the subsequent Contract Schedule of Values utilized for Progress Payments

Sheet2