W D_-_dated_11.7.14_(Harris_County).pdf
PDF 132 KB Posted
- Attached to
- Bob Casey Restroom Upgrade - Side "A" Federal contract opportunity
- Solicitation number
- GS-07P-15-UR-C-0004
About this file
Department of Labor - Wages Determination
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Drawings_50__-_Bob_Casey_Restroom.pdf | ||
| SF_1442_-_BC_RR_(Solicitation).pdf | ||
| ELECTRICAL_SET_50__-_Bob_Casey_Restroom.pdf | ||
| C101-SB_-_BC_RR_(Side_A).pdf | ||
| A-Side_Restrooms_SOW_Design-Build_11-14-14.pdf | ||
| C201-SB__BC_RR_(side_A).pdf | ||
| Past_Performance_Sheet.pdf | ||
| FSRS_Reporting_Requirement_Form.pdf | ||
| C301_BC_RR_(Side_A).pdf | ||
| Key_Personnel_Resume.pdf | ||
| EXAMPLE_CSI_Master_Format.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: TX140303 11/07/2014 TX303
State: Texas
Construction Type: Building
County: Harris County in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 10/31/2014 1 11/07/2014
ASBE0022-009 03/01/2014
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Duct, Pipe and Mechanical System Insulation)....$ 20.75 9.85
BOIL0074-003 01/01/2014
Rates Fringes
BOILERMAKER......................$ 23.14 21.55
CARP0551-008 04/01/2014
Rates Fringes
CARPENTER (Excludes Acoustical Ceiling Installation,Drywall Hanging, Form Work and Metal Stud Installation)....................$ 21.97 7.98
ELEC0716-005 08/29/2011
Rates Fringes
ELECTRICIAN (Excludes Low Voltage Wiring and Installation of Alarms)..........$ 27.65 7.70
ELEV0031-003 01/01/2014
Rates Fringes
ELEVATOR MECHANIC................$ 38.00 26.785+a
FOOTNOTES: A. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked.
11/23/2014file:///C:/Temp/1/Low/RO420VRE.htm
New Year's Day; Memorial Day; Independence Day; Labor Day;
Thanksgiving Day; Friday after Thanksgiving Day; Christmas Day; and Veterans Day.
ENGI0450-002 04/01/2014
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes......................$ 34.85 9.85
IRON0084-001 06/15/2014
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 22.02 6.35
IRON0084-012 06/15/2014
Rates Fringes
GLAZIER..........................$ 22.02 6.35
IRONWORKER, ORNAMENTAL...........$ 22.02 6.35
PLAS0079-004 01/01/2010
Rates Fringes
PLASTERER........................$ 19.42 1.00
PLUM0068-012 10/01/2013
Rates Fringes
PLUMBER (Excludes HVAC Pipe Installation)....................$ 31.30 9.49
PLUM0211-010 10/01/2013
Rates Fringes
PIPEFITTER (Including HVAC Pipe Installation)...............$ 29.39 10.31
SFTX0669-002 07/31/2014
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 26.36 16.52
SHEE0054-006 07/01/2014
Rates Fringes
SHEET METAL WORKER
Excludes HVAC Unit Installation................$ 25.67 12.39
HVAC Duct Installation Only.$ 25.67 12.39
SUTX2014-029 07/21/2014
Rates Fringes
ACOUSTICAL CEILING MECHANIC......$ 17.27 3.98
BRICKLAYER.......................$ 18.87 0.00
CAULKER..........................$ 15.36 0.00
CEMENT MASON/CONCRETE FINISHER...$ 13.93 0.00
DRYWALL FINISHER/TAPER...........$ 16.27 3.66
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 17.44 3.93
ELECTRICIAN (Alarm Installation Only)...............$ 17.97 3.37
ELECTRICIAN (Low Voltage Wiring Only).....................$ 18.00 1.68
FLOOR LAYER: Carpet.............$ 20.00 0.00
FORM WORKER......................$ 12.77 0.00
INSULATOR - BATT.................$ 14.87 0.73
IRONWORKER, REINFORCING..........$ 12.14 0.00
LABORER: Common or General......$ 11.76 0.00
LABORER: Mason Tender - Brick...$ 13.47 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 10.48 0.00
LABORER: Pipelayer..............$ 12.94 0.00
LABORER: Roof Tearoff...........$ 11.28 0.00
LABORER: Landscape and Irrigation.......................$ 9.52 0.00
LATHER...........................$ 19.73 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 13.94 0.00
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 13.93 0.00
OPERATOR: Bulldozer.............$ 22.75 0.00
OPERATOR: Drill.................$ 16.22 0.34
OPERATOR: Forklift..............$ 16.00 0.00
OPERATOR: Grader/Blade..........$ 13.37 0.00
OPERATOR: Loader................$ 13.55 0.94
OPERATOR: Mechanic..............$ 17.52 3.33
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.03 0.00
PAINTER (Brush, Roller and Spray), Excludes Drywall Finishing/Taping.................$ 17.24 4.41
ROOFER...........................$ 15.40 0.00
SHEET METAL WORKER (HVAC Unit Installation Only)...............$ 20.05 2.24
TILE FINISHER....................$ 12.00 0.00
TILE SETTER......................$ 16.17 0.00
TRUCK DRIVER: 1/Single Axle Truck............................$ 14.18 0.00
TRUCK DRIVER: Dump Truck........$ 12.39 1.18
TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57
TRUCK DRIVER: Semi-Trailer Truck............................$ 12.50 0.00
TRUCK DRIVER: Water Truck.......$ 12.00 4.11
WATERPROOFER.....................$ 14.39 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .