Drawings_50__-_Bob_Casey_Restroom.pdf
PDF 20 MB Posted
- Attached to
- Bob Casey Restroom Upgrade - Side "A" Federal contract opportunity
- Solicitation number
- GS-07P-15-UR-C-0004
About this file
Drawings 50
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_1442_-_BC_RR_(Solicitation).pdf | ||
| EXAMPLE_CSI_Master_Format.pdf | ||
| ELECTRICAL_SET_50__-_Bob_Casey_Restroom.pdf | ||
| C101-SB_-_BC_RR_(Side_A).pdf | ||
| A-Side_Restrooms_SOW_Design-Build_11-14-14.pdf | ||
| C201-SB__BC_RR_(side_A).pdf | ||
| Past_Performance_Sheet.pdf | ||
| Key_Personnel_Resume.pdf | ||
| W D_-_dated_11.7.14_(Harris_County).pdf | ||
| FSRS_Reporting_Requirement_Form.pdf | ||
| C301_BC_RR_(Side_A).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ErikaWilburnCampbell Text Box Incorporated into Solicitation #
GS-07P-15-UR-C-0004
MontrellDHarris Line
MontrellDHarris Line
MontrellDHarris Line
MontrellDHarris Text Box
DESIGN TO BE COMPLETED
CONSTRUCTION CONSIDERED AS AN OPTION
| G001 Layout1 (1) |
| G101 Layout1 (1) |
| G201 (1) |
| G202 (1) |
| D1.0-B |
| D1.1-2 |
| D1.3-4 |
| D1.5-6 |
| D1.7-8 |
| D1.9-10 |
| D1.11-12 |
| D2.0-B |
| D2.1-2 |
| D2.3-4 |
| D2.5-6 |
| D2.7-8 |
| D2.9-10 |
| D2.11-12 |
| A1.0-B |
| A1.1-2 |
| A1.3-4 |
| A1.5-6 |
| A1.7-8 |
| A1.9-10 |
| A1.11-12 |
| A2.0-B |
| A2.1-2 |
| A2.3-4 |
| A2.5-6 |
| A2.7-8 |
| A2.9-10 |
| A2.11-12 |
| A3.0-B1 FINISH |
| A3.0-B2 FINISH |
| A4.1 ELEV |
| A4.2 ELEV |
| A4.3 ELEV |
| A4.4 ELEV |
| A4.5 ELEV |
| A4.6 ELEV |
| A5 |
| A6 |
| A7 |
File details come from the government source that posted it. Updated .