EXAMPLE_CSI_Master_Format.pdf

PDF 218 KB Posted

Attached to
Bob Casey Restroom Upgrade - Side "A" Federal contract opportunity
Solicitation number
GS-07P-15-UR-C-0004
Issued by
General Services Administration Public Buildings Service Region 4

About this file

Example CSI Master Format

View the file

Other files for this federal contract opportunity

Other files attached to Bob Casey Restroom Upgrade - Side "A", newest first.
File Type Posted
Drawings_50__-_Bob_Casey_Restroom.pdf PDF
SF_1442_-_BC_RR_(Solicitation).pdf PDF
W D_-_dated_11.7.14_(Harris_County).pdf PDF
FSRS_Reporting_Requirement_Form.pdf PDF
C301_BC_RR_(Side_A).pdf PDF
Key_Personnel_Resume.pdf PDF
ELECTRICAL_SET_50__-_Bob_Casey_Restroom.pdf PDF
C101-SB_-_BC_RR_(Side_A).pdf PDF
A-Side_Restrooms_SOW_Design-Build_11-14-14.pdf PDF
C201-SB__BC_RR_(side_A).pdf PDF
Past_Performance_Sheet.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: Example Project #1 Project Duration: 2 Weeks

Agency: Company Name Estimator: Names of Lead Estimator

Address: 1234 Main St. Suite 1 Project Manager: Name of Lead Project Manager

Date: 6/1/2014

01 General Conditions

01 31 Project Management and Coordination 1 LS 2,557$ -$ -$ 2,557$

01 51 Temporary Utilities 1 LS 1,500$ 800$ -$ 2,300$

01 55 Vehicular Access and Parking 1 LS -$ 250$ -$ 250$

01 76 Protecting Installed Construction 1 LS 2,200$ 300$ 250$ 2,750$

01 General Conditions 7,857$

02 Existing Conditions

02 41 Demolition 2500 SF 3,000$ -$ 2,700$ 5,700$

02 42 Removal and Salvage of Construction Material 1 LS 800$ -$ 925$ 1,725$

02 82 Asbestos Remediation 1500 SF 1,500$ 1,200$ -$ 2,700$

02 Existing Conditions 10,125$

08 Openings

08 11 Metal Doors and Frames 5 EA 325$ 2,100$ -$ 2,425$

08 71 Door Hardware 1 LS 185$ 800$ -$ 985$

08 74 Access Controlled Hardware 1 LS 200$ 250$ -$ 450$

08 Openings 3,860$

09 Finishes

09 05 Common Work Results and Demolition for Finishes 1 LS 125$ -$ -$ 125$

09 29 Gypsum Board 20 SF 150$ 55$ -$ 205$

09 68 Carpeting 800 SF 350$ 950$ -$ 1,300$

09 72 Wall Covering 400 SF 275$ 625$ -$ 900$

09 91 Painting 250 SF 125$ 80$ -$ 205$

09 Finishes 2,735$

21 Fire Suppression

21 13 Fire Suppression Sprinkler System 1 LS 200$ 50$ -$ 250$

21 Fire Suppression 250$

23 Heating, Ventilating, & Air Conditioning

23 37 Air Outlets and Inlets 1 LS 180$ 80$ -$ 260$

23 Heating, Ventilating, & Air Conditioning 260$

26 Electrical

26 05 Common Work Results and demolition for Electrical 1 LS 210$ -$ -$ 210$

Description Quantity Division TotalsTotal Labor Total

Material

Total

Equipment

Line Item

Totals

26 05 Common Work Results and demolition for Electrical 1 LS 210$ -$ -$ 210$

26 29 Low-Voltage Controllers 1 EA 210$ 250$ -$ 460$

26 51 Interior Lighting 3 EA 175$ 75$ -$ 250$

26 Electrical 920$

27 Communications

27 15 Communications Horizontal Cabling 1 LS 210$ 150$ -$ 360$

27 Communications 360$

28 Electrical Safety & Security

28 13 Access Control 1 LS 400$ 750$ -$ 1,150$

28 31 Fire Detection and Alarm 1 LS 140$ -$ -$ 140$

28 Electrical Safety & Security 1,290$

Subtotal of work above 27,657$

Subcontractor 1 Overhead & Profit 10.0% Total 1,600$

Subcontractor 2 Overhead & Profit 10.0% Total 1,200$

Subcontractor 3 Overhead & Profit 10.0% Total 350$

Design Fees 2.5% Total 2,504$

Subcontractor Total Fees 5,654$

Insurance 5.0% Total 1,702$

Bond 0.5% Total 170$

Overhead 1.0% Total 340$

Profit 0.5% Total 170$

General Contractor Total Fees 2,382$

GSA Building Security Supervision 40 Hours Total 4,000$

Additional Total Mark Ups 4,000$

Estimate Total 39,693$