Combined_Specifications.pdf

PDF 395 KB Posted

Attached to
Recapture Basement - Zorinsky
Solicitation number
GS-06P-15-TC-P-7003
Issued by

About this file

Scope Specs

View the file

Other files

File Type Posted
Wage_Determination.pdf PDF
SF18_-_Request_for_Quotation.pdf PDF
The_Solicitation.pdf PDF
CONSTRUCTION_CONTRACT_CLAUSES.pdf PDF
Liquidated_Damages_Construction.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual

GSA-PBS

Nebraska Field Office

Recapture Basement

NE0051ZZ, Zorinsky Federal Building

Omaha, NE

PROJECT MANUAL

May 18, 2015

SOW – GSA Recapture Basement Offices Project

NE0051ZZ

4/21/2014 Revised 5/18/2015

00 01 10-1

MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE PAGE #

00 01 15 List of Drawing Sheets 09-11 1

DIVISION 01 - GENERAL REQUIREMENTS

Scope of Work 2-10

DIVISION 09 – FINISHES

09 29 00 Gypsum Board 11-14 10-14

09 65 13 Resilient Base and Accessories 10-11 14-18

09 91 00 Painting 05-15 18-29

This is the property of the U.S. Government. Copying, dissemination, or distribution of this document to unauthorized users is prohibited. Do not remove this notice. Properly destroy document when no longer needed.

SCOPE OF WORK

Zorinsky – Recapture Basement Offices Project

1. GENERAL. The contractor shall be responsible for and shall provide all labor, supervision, materials, and equipment necessary to reinstall the lower half of the drywall partitions removed due to flooding. Work will take place in the Basement of the Zorinsky Federal Building, 1616 Capitol Avenue, Omaha, NE.

2. SUPPLIES, MATERIALS AND EQUIPMENT.

a. Estimated price range for this project is between $25,000 and $100,000.

b. Materials, supplies and equipment used shall be commercially available products of reputable manufacturer or suppliers and shall be approved by the Contracting Officer (CO) prior to starting the work. The contractor shall not use any material which the CO determines would be unsuitable for any purpose. The contractor shall provide submittals for temporary dust protection, metal studs, moisture resistant drywall, cove base, stain and paint for approval prior to execution of any work.

3. REQUIREMENTS. Before repair or installation services commence, the contractor shall inspect the work site and ascertain all information necessary for the diligent performance of contract requirements. The contractor shall notify the CO of any conditions that prevent the suitable completion of these requirements.

a. Demolition.

1. Install temporary dust barrier to protect return air, corridors and existing room. The dust barrier separating areas shall be secured to the floor and ceiling.

b. Revision.

1. Repair or replace all bent or twisted 20 gauge metal studs as identified by

GSA.(typical 10 locations)

2. Install 5/8-inch, moisture resistant, green board drywall on the lower portion of all drywall partitions as shown on drawings.

3. Repair all wall defects in existing partitions to create a new smooth finish ready for paint. Finish is to match surrounding partitions.

4. Prime (one) 1 coat and paint all newly constructed drywall partitions a minimum of two (2) coats of commercial interior Low VOC latex to match surrounding color and sheen, partitions constructed above the ceiling shall remain unpainted. Ensure all return air openings are blocked to prevent the spread of odors outside the construction area.

5. Repaint all existing walls, exposed conduits and piping to match surrounding color of new partitions, existing walls above the ceiling shall remain unpainted. Ensure all return air openings are blocked to prevent the spread of odors outside the construction area.

6. Install 4” vinyl toed cove as indicated on drawings.

7. Ensure all 120V duplex receptacles, wiring, conduit and cover plates are in working order. All missing cover plates shall be replaced to match existing.

8. Relocate Data and communication lines in the staff area located on the first floor. There will be two phones lines, two computer data lines and one dedicated time clock data line. Use existing conduit and install new cable as required. Field verify existing conditions.

9. Install new Data/Comm box and 1 in conduit to above suspended ceiling in room B16. Relocate data face plate from room B15 and replace with blank SS cover plate.

10. Remove time clock from office space on 1st floor and remount to wall in room B15 as directed by GSA.

11. Repair loose laminate on existing break room lower casework and reinstall.

12. Install existing double sink, faucet and associated plumbing in break room area.

13. Reinstall two (2) existing wall mounted, commercial ceramic toilets, and automatic flush valves.

14. Reinstall all bathroom accessories to include wall lavatory sink with automatic faucet, mirror, grab rails (2 per restroom), semi recessed trash receptacle, paper towel dispensers, toilet paper dispensers, and feminine product dispenser (woman’s restroom only)

15. Clean area to meet GSA standards to include but not limited to dusting, sweeping.

4. CLEAN-UP. The contractor shall remove all debris generated in the performance of this contract daily. The contractor shall recycle or reuse any parts and / or material removed from the site, with no cost to the government.

5. WORKMANSHIP AND WARRANTY.

a. All work shall be coordinated and scheduled with GSA and GSA has the right to reject any unsatisfactory or unsuitable material or workmanship. All work shall be done in a neat and workman like manner. Any damage caused by the contractor to the building, any of its contents or tenants shall be the responsibility of the contractor to correct in a timely manner.

b. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of work.

c. All work shall be accomplished by a journeyman mechanic, in accordance with the best practices of the trade.

d. Upon completion of the project, GSA shall conduct a walk-through with the contractor to ensure that the work has been satisfactorily completed. Agency representative shall accompany the GSA representative on this tour and give written approval to the CO/Contracting Officer’s Representative (COR).

e. The contractor shall provide a one year warranty on all work completed and parts replaced. The warranty period shall begin upon acceptance of the completed project.

6. PROTECTION. The contractor shall provide any materials, barriers and safety equipment necessary for the protection of pedestrians and property during the implementation of this contract. Every precaution shall be taken by the contractor to prevent fire while storing any combustible materials. If available, materials may be stored in an assigned space and kept locked when not in use. Used combustible materials shall be disposed of daily.

7. SECURITY. All employees/sub- contractors shall have a current security clearance and wear their ID badge at all times while on the premises. In the event an employee/ sub-contractor needs to request a security clearance or current clearance has expired, paperwork shall be submitted to this office within 5 days from date of award of contract.

There shall be a $10.00 fee for any replacement badge.

8. SAFETY AND HEALTH.

a. All work shall comply with the applicable requirements of 29 CFR 1910/1926 and 40 CFR 761. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply.

b. The contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the government harmless for any action on its part or that of its employees or sub-contractors, which results in illness or death.

c. The contractor shall provide all necessary safety equipment and ensure that such equipment and all relevant safety procedures are adequate for the job being performed and are utilized properly.

d. The contractor shall post, at the job site, Material Safety Data Sheets

(MSDS) for all products used in this project. In addition, a copy of the MSDS shall be furnished to this office.

9. BUY AMERICAN ACT. Use only domestic construction materials in construction contracts performed in the United States. Reference FAR 52.225-9 – Buy American Act

– Construction Materials for further details. The full text of this clause can be located at www.acquisition.gov/far.

10. TAXES. The contractor is responsible for taxes on all materials associated with this contract.

11. INSURANCE CERTIFICATE. Offerors shall submit an acceptable insurance certificate, as required by FAR 28.307-2 Liability. The contractor shall provide bodily injury liability insurance coverage written on the comprehensive form of the policy of at least $100,000 per occurrence for property damage.

12. INVOICES. Invoices may be submitted to the address listed in Block 21 of the GSA Form 300.

13. SYSTEM FOR AWARD MANAGEMENT (SAM). The System for Award Management (SAM) is combining federal procurement systems and the Catalog of Federal Domestic Assistance into one new system. In accordance with FAR 52.204-7 and 52.232-33, prior to the award of any contract, basic agreement, basic ordering agreement, or blanket purchase agreement registration in the Central Contractor Registration (CCR) database is required. In accordance with FAR 4.1210, contractors shall complete electronic annual representations and certifications in Online Representations and Certifications Application (ORCA) prior to the award of any contract. Both CCR and ORCA can be found in the System for Award Management (SAM) at www.sam.gov.

http://www.acquisition.gov/far http://www.sam.gov/

14. AWARD. Award of this contract will be made on the basis of price and past performance, as demonstrated by the contractor’s submission of projects completed successfully in the past three years. See attached form for description of project information needed.

15. GREEN PRODUCT GENERAL REQUIREMENTS. The contractor shall comply with the following green product requirements as detailed in this section below.

a. EPA Comprehensive Procurement Guideline-designated Products.

The contractor shall use EPA-designated items as required by Federal Acquisition Regulation (FAR) Clause 52.223-17. When using EPA-designated items, the contractor shall use products that meet EPA’s Comprehensive Procurement Guidelines recommended recovered materials content levels.

When no product is available that meets the EPA’s recommended recovered materials content levels, the contractor shall use the product with the highest percentage of recovered materials practicable that does not jeopardize the intended use of the product. When an EPA-designated item and a USDA-designated (bio-based) product would be used for the same purpose and all other factors being equal, the contractor shall use the EPA-designated Product.

b. Electronic Product Environmental Assessment Tool-registered

Products. The contractor shall only use EPEAT-registered products as required by FAR Clause 52.223-16. When an EPEAT-registered product is required under FAR Clause 52.223-16, the contractor shall use at least EPEAT-registered products at the silver or gold level. This requirement for EPEAT-registered products at the silver or gold level overrides any contrary language contained in FAR Clause 52.223-16. When using energy consuming products in the categories above for which there is no EPEAT standard (IEEE 1680 standard), the contractor shall use ENERGY STAR®-qualified/FEMP-designated Products instead.

c. WaterSense and Water Efficient Products. The following types of products used on this project shall be designated as WaterSense Items:

Showerheads

Toilets

Urinals

Bathroom Sink Faucets & Accessories

Pre-rinse Spray Valves

Landscape Irrigation Controllers

In addition, when incorporating other types of water consuming products that have not yet been included in the WaterSense Program, the contractor shall use products that meet FEMP specifications.

d. Non-Ozone Depleting Substances. When using products in the following categories, the contractor shall only use products that contain acceptable substitutes for ozone-depleting substances as identified under EPA’s SNAP Program:

Refrigeration & Air Conditioning

Foam Blowing Agents

Cleaning Solvents

Fire Suppression and Explosion Protection

Aerosols

Sterilants

Tobacco Expansion

Adhesives, Coatings, & Inks

Products in the categories above that are used on this scope of work shall not contain Class I or Class II ozone-depleting substances.

e. Toxic Chemical/Hazardous Substance Alternatives. The contractor shall not use any products that contain priority chemicals as identified by EPA when a less harmful substitute substance exists. If a less harmful substitute exists, this product shall be used.

f. Environmentally Preferable Products. The contractor shall use the following types of green products where appropriate:

Products containing low or no volatile organic compounds (VOCs), such as no/low VOC paints (post-tint)

Green cleaning products meeting EPA Design for the Environment Green Seal, or equivalent standards

Furniture meeting GreenGuard (or equivalent standard accepted by US Green Building Council (USGBC), Business and Institutional Furniture Manufacturer’s Association (BIFMA) “level” or Enhancing Furniture’s Environmental Culture (EFEC) standards

g. Miscellaneous Green Requirements. In addition, the contractor shall perform the scope of work in a way that implements the following environmental objectives:

Eliminate or reduce the generation of hazardous waste and the need for special material processing (including special handling, storage, treatment, and disposal)

Promote the use of nonhazardous and recovered materials

Realize life-cycle cost savings

Promote cost-effective waste reduction when creating plans, drawings, specifications, standards, and other product descriptions authorizing material substitutions, extensions of shelf-life, and process improvements

Promote waste reduction through the use of duplexing (two-sides copying and printing) and electronic communications

h. P100 Green Standards. In addition, The contractor shall use the following types of P100 Green Standards where appropriate:

Broadloom/Carpet Tile: NSF 140 Gold and 10-percent pre- or post-consumer recycled content or 7-percent Biobased fiber.

Vinyl Tile and Sheet Vinyl; Rubber Tile: CA 1350 compliant.

Linoleum: CA 1350 compliant and 10-percent recycled content or 30-percent Biobased content.

Pressed Floor Tile; Quarry Tile; Mosaic Tile: Green Squared.

Laminate Flooring: CA 1350 compliant and 50-percent recycled content.

Wood and Bamboo Flooring: 91-percent Biobased.

Glazed Wall Tile: Green Squared.

Interior Paint: CARB 2007 VOC compliant.

Wall Covering – Type II: NSF 342 Conformant level.

Plastic/Laminate Wall Paneling: 40-percent recycled content

Wood Wall Paneling: 91-percent Biobased.

Composite Board Wall Paneling; Sculptural Panel Wall Paneling: 20-percent recycled content or 89-biobased content.

Ceilings: CHPS compliant; product Environmental Product Declaration (EPD) available; and 20-percent recycled content or recyclable in a closed loop process or 37-percent Biobased; and have an 80-percent light reflectance value.

16. GREEN PRODUCTS SUBMITTALS. The contractor shall submit a Green Products Initial Report to the GSA COTR within 15 calendar days after notice to proceed that states the quantity and cost of the green products that are anticipated to be used on the contract. The contractor shall also submit Green Products Final Report to the GSA COTR as part of the contract closeout documents that states the actual quantity and cost of the green products used on the contract. The contractor shall also state in the Green Products Final Report the total combined cost of all products (both green and non-green products) used on the contract. The Green Products Initial Report and Green Products Final Report are included as attachments.

Attachment:

Contractor Green Products Report

CONTRACTOR GREEN PRODUCTS REPORT

Check One: ___ Design Report ___Initial Plan ___ Annual Report / Final / Close-Out Report

Project Title:

Contract/Task Order #:

Project location:

Firm Name:

Firm Certifying Official Name:

Firm Certifying Official Phone #:

Firm Certifying Official Email Address:

INSTRUCTIONS: List the total quantity and total cost for each green product category below that your firm used on this contract. If your firm did not use a green product category, write the number 0 in the respective boxes below. Do not include text or dollar signs ($) in your responses. Round to the nearest dollar. Below the chart, list the total combined cost of all products (both green and non-green products) used on the contract. This combined total products cost excludes labor, overhead, profit, and all other non-product costs.

Green Product Category Total Quantity Total Cost

EPA Comprehensive Procurement Guideline-designated

Products

ENERGY STAR®-qualified/FEMP-designated Products

WaterSense Products

FEMP-designated Water Efficient Products

Non-Ozone Depleting Products

Hazardous/Toxic Product Alternatives

Environmental Preferable Products

** FINAL / CLOSE-OUT ONLY: Total Products Cost (Includes green and non-green products): ___________________________________________ (Exclude labor, overhead, profit and all other non-product costs.)

CERTIFICATION BY FIRM

As the Certifying Official on behalf of the Firm, I hereby certify that the above information is true and correct to the best of my knowledge.

Certifying Official Signature Date

PAST PERFORMANCE REPORT

The contractor shall submit three projects successfully completed in the past three years, similar in scope (value and technical aspect of project) to the project being solicited. Projects submitted shall have been completed in an occupied, multistory building.

Note: Submission of a project indicates contractor's consent for the owner to be contacted for a reference.

Information to be submitted for each of the projects shall include:

Project Title and Location

Description of the Project

Name, Email Address, and Telephone Number of Owner

Project Value

Project Completion Date

The following questions shall also be addressed for each project submission:

Was the project on time?

Was the project completed on budget?

List any significant challenges you encountered on the project. How were these challenges addressed and resolved?

GSA BASEMENT RECAPTURE

NE0051ZZ, ZORINSKY FEDERAL BUILDING, OMAHA, NE

09 29 00 - 13

SECTION 09 29 00

GYPSUM BOARD

PART 1 - GENERAL

1.1 DESCRIPTION

This section specifies installation and finishing of moisture and mold resistant gypsum board.

1.2 RELATED WORK

A. Not Used.

1.3 TERMINOLOGY

A. Not Used.

1.4 SUBMITTALS

A. Manufacturer's Literature and Data:

1. Cornerbead and edge trim.

2. Finishing materials.

3. Gypsum board, each type.

1.5 DELIVERY, IDENTIFICATION, HANDLING AND STORAGE

In accordance with the requirements of ASTM C840.

1.6 ENVIRONMENTAL CONDITIONS

In accordance with the requirements of ASTM C840.

1.7 APPLICABLE PUBLICATIONS

A. Not Used.

PART 2 - PRODUCTS

2.1 GYPSUM BOARD

A. Gypsum Board: ASTM C1396, Type X, 16 mm (5/8 inch) thick unless shown otherwise. GREENGUARD Gold certified.

2.2 ACCESSORIES

A. Corner Bead or Edge Trim.

2.3 FASTENERS

A. ASTM C1002 and ASTM C840, except as otherwise specified.

B. ASTM C954, for steel studs thicker than 0.04 mm (0.33 inch).

C. Select screws of size and type recommended by the manufacturer of the material being fastened.

09 29 00 - 14

2.5 FINISHING MATERIALS AND LAMINATING ADHESIVE

ASTM C475 and ASTM C840. Free of antifreeze, vinyl adhesives, preservatives, biocides and other VOC. Adhesive shall contain a maximum

VOC content of 50 g/l.

PART 3 - EXECUTION

3.1 GYPSUM BOARD HEIGHTS

A. Extend all layers of gypsum board from floor to cut edge of existing gypsum board all partitions and furring, unless otherwise stated.

3.2 INSTALLING GYPSUM BOARD

A. Coordinate installation of gypsum board with other trades and related work.

B. Install gypsum board in accordance with ASTM C840, except as otherwise specified.

C. Use gypsum boards in maximum practical lengths to minimize number of end joints.

D. Bring gypsum board into contact, but do not force into place.

E. Walls (Except Shaft Walls):

1. When gypsum board is installed parallel to framing members, space fasteners 300 mm (12 inches) on center in field of the board, and

200 mm (8 inches) on center along edges.

2. When gypsum board is installed perpendicular to framing members, space fasteners 300 mm (12 inches) on center in field and along edges.

3. Stagger screws on abutting edges or ends.

4. For single-ply construction, apply gypsum board with long dimension either parallel or perpendicular to framing members as required to minimize number of joints except gypsum board shall be applied vertically over "Z" furring channels.

5. No offset in exposed face of walls and partitions will be permitted.

6. Control Joints ASTM C840 and as follows:

a. Not required for wall lengths less than 9000 mm (30 feet).

G. Accessories:

1. Set accessories plumb, level and true to line, neatly mitered at corners and intersections, and securely attach to supporting surfaces as specified.

09 29 00 - 15

2. Install in one piece, without the limits of the longest commercially available lengths.

3. Corner Beads:

a. Install at all vertical and horizontal external corners and where shown.

b. Use screws only. Do not use crimping tool.

4. Edge Trim (casings Beads):

a. At both sides of expansion and control joints unless shown otherwise.

b. Where gypsum board terminates against dissimilar materials and at perimeter of openings, except where covered by flanges, casings or permanently built-in equipment.

c. Where gypsum board surfaces of non-load bearing assemblies abut load bearing members.

d. Where shown.

3.3 INSTALLING GYPSUM SHEATHING

A. Not Used.

3.4 FINISHING OF GYPSUM BOARD

A. Finish joints, edges, corners, and fastener heads in accordance with

ASTM C840. Use Level 5 finish for al finished areas open to public view.

B. Before proceeding with installation of finishing materials, assure the following:

1. Gypsum board is fastened and held close to framing or furring.

2. Fastening heads in gypsum board are slightly below surface in dimple formed by driving tool.

C. Finish joints, fasteners, and all openings, including openings around penetrations, on that part of the gypsum board extending above suspended ceilings to seal surface of fire rated and sound rated gypsum board construction. After the installation of hanger rods, hanger wires, supports, equipment, conduits, piping and similar work, seal remaining openings and maintain the integrity of the fire rated and sound rated construction. Sanding is not required of non decorated surfaces.

3.6 REPAIRS

A. After taping and finishing has been completed, and before decoration, repair all damaged and defective work, including nondecorated surfaces.

09 29 00 - 16

B. Patch holes or openings 13 mm (1/2 inch) or less in diameter, or equivalent size, with a setting type finishing compound or patching plaster.

C. Repair holes or openings over 13 mm (1/2 inch) diameter, or equivalent size, with 16 mm (5/8 inch) thick gypsum board secured in such a manner as to provide solid substrate equivalent to undamaged surface.

D. Tape and refinish scratched, abraded or damaged finish surfaces including cracks and joints in fire rated construction and STC 47 equivalent (where indicated) to the sound rated construction.

- - - E N D - - -

GSA Basement Recapture

NE0051ZZ, ZORINSKY FEDERAL BUILDING, OMAHA, NE 10-11

09 65 13 - 17

SECTION 09 65 13

RESILIENT BASE AND ACCESSORIES

1.1 DESCRIPTION

This section specifies the installation of vinyl or rubber base and resilient stair treads with sheet rubber flooring on landings.

1.2 RELATED WORK (NOT USED)

1.3 SUBMITTALS

A. Manufacturer's Literature and Data:

1. Description of each product.

2. Base and stair material manufacturer's recommendations for adhesives.

3. Application and installation instructions.

C. Samples:

1. Base: 150 mm (6 inches) long, each type and color.

2. Adhesive: Literature indicating each type.

1.4 DELIVERY

A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufacturer's name or brand, type and color, production run number and date of manufacture.

B. Materials from containers which have been distorted, damaged or opened prior to installation will be rejected.

1.5 STORAGE

A. Store materials in weather tight and dry storage facility.

B. Protect material from damage by handling and construction operations before, during, and after installation.

1.6 APPLICABLE PUBLICATIONS

A. The publication listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. American Society for Testing and Materials (ASTM):

F1344-10................Rubber Floor Tile

F1859-10................Rubber Sheet Floor Covering without Backing

F1860-10................Rubber Sheet Floor Covering with Backing

F1861-08................Resilient Wall Base

C. Federal Specifications (Fed. Spec.):

09 65 13 - 18

RR-T-650E...............Treads, Metallic and Non-Metallic, Nonskid

PART 2 - PRODUCTS

2.1 GENERAL

Use only products by the same manufacturer and from the same production run.

2.2 RESILIENT BASE

A. ASTM F1861, 3 mm (1/8 inch) thick, 100 mm (4 inches) high, Thermoplastics, Group 2-layered. Style B-cove.

C. Use only one type of base throughout.

2.3 RESILIENT TREADS (NOT USED)

2.4 SHEET RUBBER FLOORING (NOT USED)

2.5 PRIMER (FOR CONCRETE FLOORS)(NOT USED)

2.6 LEVELING COMPOUND (FOR CONCRETE FLOORS)(NOT USED)

2.7 ADHESIVES

A. Use products recommended by the material manufacturer for the conditions of use.

B. Use low-VOC adhesive during installation. Water based adhesive with low

VOC is preferred over solvent based adhesive.

PART 3 - EXECUTION

3.1 PROJECT CONDITIONS

A. Maintain temperature of materials above 21o C (70 F), for 48 hours before installation.

B. Maintain temperature of rooms where work occurs, between 21o C and 27o C

(70oF and 80oF) for at least 48 hours, before, during, and after installation.

C. Do not install materials until building is permanently enclosed and wet construction is complete, dry, and cured.

3.2 INSTALLATION REQUIREMENTS

A. The respective manufacturer's instructions for application and installation will be considered for use when approved by the Project

Manager.

B. Submit proposed installation deviation from this specification to the

Project Manger indicating the differences in the method of installation.

C. The Project Manger reserves the right to have test portions of material installation removed to check for non-uniform adhesion and spotty adhesive coverage.

09 65 13 - 19

3.3 PREPARATION

A. Examine surfaces on which material is to be installed.

B. Fill cracks, pits, and dents with leveling compound.

C. Level to 3 mm (1/8 inch) maximum variations.

D. Do not use adhesive for leveling or filling.

E. Grind, sand, or cut away protrusions; grind high spots.

F. Clean substrate area of oil, grease, dust, paint, and deleterious substances.

G. Substrate area dry and cured. Perform manufacturer’s recommended bond and moisture test.

H. Preparation of existing installation:

1. Remove existing base and stair treads including adhesive.

2. Do not use solvents to remove adhesives.

3. Prepare substrate as specified.

3.4 BASE INSTALLATION

A. Location:

1. Unless otherwise specified or shown, where base is scheduled, install base over toe space of base of casework, lockers, laboratory, pharmacy furniture island cabinets and where other equipment occurs.

2. Extend base scheduled for room into adjacent closet, alcoves, and around columns.

B. Application:

1. Apply adhesive uniformly with no bare spots.

2. Set base with joints aligned and butted to touch for entire height.

3. Before starting installation, layout base material to provide the minimum number of joints with no strip less than 600 mm (24 inches) length.

a. Short pieces to save material will not be permitted.

b. Locate joints as remote from corners as the material lengths or the wall configuration will permit.

C. Form corners and end stops as follows:

1. Score back of outside corner.

2. Score face of inside corner and notch cove.

D. Roll base for complete adhesion.

09 65 13 - 20

3.5 STAIR TREAD INSTALLATION (NOT USED)

3.6 SHEET RUBBER INSTALLATION. (NOT USED)

3.7 CLEANING AND PROTECTION

A. Clean all exposed surfaces of base and adjoining areas of adhesive spatter before it sets.

B. Keep traffic off resilient material for at least 72 hours after installation.

C. Clean and polish materials in the following order:

1. After two weeks, scrub resilient base, sheet rubber and treads materials with a minimum amount of water and a mild detergent.

Leave surfaces clean and free of detergent residue. Polish resilient base to a gloss finish.

NE0051ZZ, ZORINSKY FEDERAL BUILDING, OMAHA, NE 05-01-15

09 91 00 - 21

SECTION 09 91 00

PAINTING

1.1 DESCRIPTION:

A. Work of this Section includes all labor, materials, equipment, and services necessary to complete the painting and finishing as shown on the construction documents and/or specified herein, including, but not limited to, the following:

1. Prime painting unprimed surfaces to be painted under this Section.

2. Painting gypsum drywall exposed to view.

3. Painting pipes, pipe coverings, conduit, ducts, insulation, hangers, supports and other mechanical and electrical items and equipment exposed to view.

4. Incidental painting and touching up as required to produce proper finish for painted surfaces, including touching up of factory finished items.

5. Painting of any surface not specifically mentioned to be painted herein or on construction documents, but for which painting is obviously necessary to complete the job, or work which comes within the intent of these specifications, is to be included as though specified.

1.2 RELATED WORK:

A. Division 9 Section gypsum board wall assemblies painting with primers specified in this Section

1.3 SUBMITTALS:

A. Product Data: For each type of product indicated.

1.4 DELIVERY AND STORAGE:

A. Deliver materials to site in manufacturer's sealed container marked to show following:

1. Name of manufacturer.

2. Product type.

3. Batch number.

4. Instructions for use.

5. Safety precautions.

B. In addition to manufacturer's label, provide a label legibly printed as following:

1. Federal Specification Number, where applicable, and name of material.

2. Surface upon which material is to be applied.

09 91 00 - 22

3. Specify Coat Types: Prime; body; finish; etc.

C. Maintain space for storage, and handling of painting materials and equipment in a ventilated, neat and orderly condition to prevent spontaneous combustion from occurring or igniting adjacent items.

D. Store materials at site at least 24 hours before using, at a temperature between 7 and 30 degrees C (45 and 85 degrees F).

1.5 QUALITY ASSURANCE:

A. Qualification of Painters: Use only qualified journeyman painters for the mixing and application of paint on exposed surfaces.

B. Paint Coordination: Provide finish coats which are compatible with the prime paints used. Review other Sections of these specifications in which prime paints are to be provided to ensure compatibility of the total coatings system for the various substrates. Upon request from other subcontractors, furnish information on the characteristics of the finish materials proposed to be used, to ensure that compatible prime coats are used. Provide barrier coats over incompatible primers or remove and re-prime as required. Notify the Contracting Officer Representative (COR) in writing of any anticipated problems using the coating systems as specified with substrates primed by others.

1.6 MOCK-UP PANEL: (NOT USED)

1.7 REGULATORY REQUIREMENTS:

A. Paint materials are to conform to the restrictions of the local

Environmental and Toxic Control jurisdiction.

1. Volatile Organic Compounds (VOC) Emissions Requirements: Field-applied paints and coatings that are inside the waterproofing system to not exceed limits of authorities having jurisdiction.

2. Lead-Base Paint:

a. Comply with Section 410 of the Lead-Based Paint Poisoning Prevention

Act, as amended, and with implementing regulations promulgated by

Secretary of Housing and Urban Development.

b. Regulations concerning prohibition against use of lead-based paint in federal and federally assisted construction, or rehabilitation of residential structures are set forth in Subpart F, Title 24, Code of

Federal Regulations, Department of Housing and Urban Development.

c. Do not use coatings having a lead content over 0.06 percent by weight of non-volatile content.

d. For lead-paint removal, see Section 02 83 33.13, LEAD-BASED PAINT

REMOVAL AND DISPOSAL.

09 91 00 - 23

3. Asbestos: Provide materials that do not contain asbestos.

4. Chromate, Cadmium, Mercury, and Silica: Provide materials that do not contain zinc-chromate, strontium-chromate, Cadmium, mercury or mercury compounds or free crystalline silica.

5. Human Carcinogens: Provide materials that do not contain any of the

ACGIH-BKLT and ACGHI-DOC confirmed or suspected human carcinogens.

6. Use high performance acrylic paints in place of alkyd paints.

1.8 SAFETY AND HEALTH

A. Apply paint materials using safety methods and equipment in accordance with the following:

1. Comply with applicable Federal, State, and local laws and regulations, and with the ACCIDENT PREVENTION PLAN, including the Activity Hazard

Analysis (AHA)

B. Safety Methods Used During Paint Application: Comply with the requirements of SSPC PA Guide 10.

C. Toxic Materials: To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:

1. The applicable manufacturer’s Material Safety Data Sheets (MSDS) or local regulation.

2. 29 CFR 1910.1000.

3. ACHIH-BKLT and ACGHI-DOC, threshold limit values.

1.9 APPLICABLE PUBLICATIONS:

A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by basic designation only.

B. American Conference of Governmental Industrial Hygienists (ACGIH):

ACGIH TLV-BKLT-2012.....Threshold Limit Values (TLV) for Chemical

Substances and Physical Agents and Biological

Exposure Indices (BEIs)

ACGIH TLV-DOC-2012......Documentation of Threshold Limit Values and

Biological Exposure Indices, (Seventh Edition)

C. ASME International (ASME):

A13.1-07(R2013).........Scheme for the Identification of Piping Systems

D. Code of Federal Regulation (CFR):

40 CFR 59...............Determination of Volatile Matter Content, Water

Content, Density Volume Solids, and Weight Solids of Surface Coating

E. Commercial Item Description (CID):

09 91 00 - 24

A-A-1272A...............Plaster Gypsum (Spackling Compound)

F. Federal Specifications (Fed Spec):

TT-P-1411A..............Paint, Copolymer-Resin, Cementitious (For

Waterproofing Concrete and Masonry Walls) (CEP)

G. Master Painters Institute (MPI):

1.......................Aluminum Paint

4.......................Interior/ Exterior Latex Block Filler

5.......................Exterior Alkyd Wood Primer

7.......................Exterior Oil Wood Primer

8.......................Exterior Alkyd, Flat MPI Gloss Level 1

9.......................Exterior Alkyd Enamel MPI Gloss Level 6

10......................Exterior Latex, Flat

11......................Exterior Latex, Semi-Gloss

18......................Organic Zinc Rich Primer

22......................Aluminum Paint, High Heat (up to 590% - 1100F)

27......................Exterior / Interior Alkyd Floor Enamel, Gloss

31......................Polyurethane, Moisture Cured, Clear Gloss

36......................Knot Sealer

43......................Interior Satin Latex, MPI Gloss Level 4

44......................Interior Low Sheen Latex, MPI Gloss Level 2

45......................Interior Primer Sealer

46......................Interior Enamel Undercoat

47......................Interior Alkyd, Semi-Gloss, MPI Gloss Level 5

48......................Interior Alkyd, Gloss, MPI Gloss Level 6

50......................Interior Latex Primer Sealer

51......................Interior Alkyd, Eggshell, MPI Gloss Level 3

52......................Interior Latex, MPI Gloss Level 3

53......................Interior Latex, Flat, MPI Gloss Level 1

54......................Interior Latex, Semi-Gloss, MPI Gloss Level 5

59......................Interior/Exterior Alkyd Porch & Floor Enamel, Low

Gloss

60......................Interior/Exterior Latex Porch & Floor Paint, Low

Gloss

66......................Interior Alkyd Fire Retardant, Clear Top-Coat (ULC

Approved)

67......................Interior Latex Fire Retardant, Top-Coat (ULC

Approved)

09 91 00 - 25

68......................Interior/ Exterior Latex Porch & Floor Paint, Gloss

71......................Polyurethane, Moisture Cured, Clear, Flat

77......................Epoxy Cold Cured, Gloss

79......................Marine Alkyd Metal Primer

90......................Interior Wood Stain, Semi-Transparent

91......................Wood Filler Paste

94......................Exterior Alkyd, Semi-Gloss

95......................Fast Drying Metal Primer

98......................High Build Epoxy Coating

101.....................Epoxy Anti-Corrosive Metal Primer

108.....................High Build Epoxy Coating, Low Gloss

114.....................Interior Latex, Gloss

119.....................Exterior Latex, High Gloss (acrylic)

134.....................Galvanized Water Based Primer

135.....................Non-Cementitious Galvanized Primer

138.....................Interior High Performance Latex, MPI Gloss Level 2

139.....................Interior High Performance Latex, MPI Gloss Level 3

140.....................Interior High Performance Latex, MPI Gloss Level 4

141.....................Interior High Performance Latex (SG) MPI Gloss

Level 5

163.....................Exterior Water Based Semi-Gloss Light Industrial

Coating, MPI Gloss Level 5

G. Society for Protective Coatings (SSPC):

SSPC SP 1-82(R2004).....Solvent Cleaning

SSPC SP 2-82(R2004).....Hand Tool Cleaning

SSPC SP 3-28(R2004).....Power Tool Cleaning

SSPC SP 10/NACE No.2....Near-White Blast Cleaning

SSPC PA Guide 10........Guide to Safety and Health Requirements

H. Maple Flooring Manufacturer’s Association (MFMA):

I. U.S. National Archives and Records Administration (NARA):

29 CFR 1910.1000........Air Contaminants

J. Underwriter’s Laboratory (UL)

PART 2 - PRODUCTS

2.1 MATERIALS:

A. Conform to the coating specifications and standards referenced in PART 3.

Submit manufacturer’s technical data sheets for specified coatings and solvents.

09 91 00 - 26

2.2 PAINT PROPERTIES:

A. Use ready-mixed (including colors), except two component epoxies, polyurethanes, polyesters, paints having metallic powders packaged separately and paints requiring specified additives.

B. Where no requirements are given in the referenced specifications for primers, use primers with pigment and vehicle, compatible with substrate and finish coats specified.

C. Provide undercoat paint produced by the same manufacturer as the finish coats. Use only thinners approved by the paint manufacturer, and use only to recommended limits.

D. VOC Content: For field applications that are inside the weatherproofing system, paints and coating to comply with VOC content limits of authorities having jurisdiction and the following VOC content limits:

1. Flat Paints and Coatings: 50 g/L.

2. Non-flat Paints and Coatings: 150 g/L.

3. Dry-Fog Coatings: 400 g/L.

4. Primers, Sealers, and Undercoaters: 200 g/L.

5. Anticorrosive and Antirust Paints applied to Ferrous Metals: 250 g/L.

6. Zinc-Rich Industrial Maintenance Primers: 340 g/L.

7. Pretreatment Wash Primers: 420 g/L.

8. Shellacs, Clear: 730 g/L.

9. Shellacs, Pigmented: 550 g/L. //

E. VOC test method for paints and coatings is to be in accordance with

40 CFR 59 (EPA Method 24). Part 60, Appendix A with the exempt compounds’ content determined by Method 303 (Determination of Exempt Compounds) in the South Coast Air Quality Management District’s (SCAQMD) “Laboratory

Methods of Analysis for Enforcement Samples” manual.

PART 3 - EXECUTION

3.1 JOB CONDITIONS:

A. Safety: Observe required safety regulations and manufacturer's warning and instructions for storage, handling and application of painting materials.

1. Take necessary precautions to protect personnel and property from hazards due to falls, injuries, toxic fumes, fire, explosion, or other harm.

2. Deposit soiled cleaning rags and waste materials in metal containers approved for that purpose. Dispose of such items off the site at end of each day’s work.

B. Atmospheric and Surface Conditions:

09 91 00 - 27

1. Do not apply coating when air or substrate conditions are:

a. Less than 3 degrees C (5 degrees F) above dew point.

b. Below 10 degrees C (50 degrees F) or over 35 degrees C

(95 degrees F), unless specifically pre-approved by the COR and the product manufacturer. Under no circumstances are application conditions to exceed manufacturer recommendations.

c. When the relative humidity exceeds 85 percent; or to damp or wet surfaces; unless otherwise permitted by the paint manufacturer’s printed instructions.

2. Maintain interior temperatures until paint dries hard.

3. Do no exterior painting when it is windy and dusty.

4. Do not paint in direct sunlight or on surfaces that the sun will warm.

5. Apply only on clean, dry and frost free surfaces except as follows:

a. Apply water thinned acrylic and cementitious paints to damp (not wet) surfaces only when allowed by manufacturer's printed instructions.

b. Concrete and masonry when permitted by manufacturer’s recommendations, dampen surfaces to which water thinned acrylic and cementitious paints are applied with a fine mist of water on hot dry days to prevent excessive suction and to cool surface.

6. Varnishing:

a. Apply in clean areas and in still air.

b. Before varnishing vacuum and dust area.

c. Immediately before varnishing wipe down surfaces with a tack rag.

3.2 INSPECTION:

A. Examine the areas and conditions where painting and finishing are to be applied and correct any conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions are corrected to permit proper installation of the work.

3.3 GENERAL WORKMANSHIP REQUIREMENTS:

A. Application may be by brush or roller.

B. Furnish to the COR a painting schedule indicating when the respective coats of paint for the various areas and surfaces will be completed. This schedule is to be kept current as the job progresses.

C. Protect work at all times. Protect all adjacent work and materials by suitable covering or other method during progress of work. Upon completion of the work, remove all paint and varnish spots from floors, glass and other surfaces. Remove from the premises all rubbish and accumulated

09 91 00 - 28 materials of whatever nature not caused by others and leave work in a clean condition.

D. Remove and protect hardware, accessories, device plates, lighting fixtures, and factory finished work, and similar items, or provide in place protection. Upon completion of each space, carefully replace all removed items by workmen skilled in the trades involved.

E. When indicated to be painted, remove electrical panel box covers and doors before painting walls. Paint separately and re-install after all paint is dry.

F. Materials are to be applied under adequate illumination, evenly spread and flowed on smoothly to avoid runs, sags, holidays, brush marks, air bubbles and excessive roller stipple.

G. Apply materials with a coverage to hide substrate completely. When color, stain, dirt or undercoats show through final coat of paint, the surface is to be covered by additional coats until the paint film is of uniform finish, color, appearance and coverage, at no additional cost to the

Government.

H. All coats are to be dry to manufacturer’s recommendations before applying succeeding coats.

I. All suction spots or “hot spots” in plaster after the application of the first coat are to be touched up before applying the second coat.

J. Do not apply paint behind frameless mirrors that use mastic for adhering to wall surface.

3.4 SURFACE PREPARATION:

A. General:

1. The Contractor shall be held wholly responsible for the finished appearance and satisfactory completion of painting work. Properly prepare all surfaces to receive paint, which includes cleaning, sanding, and touching-up of all prime coats applied under other

Sections of the work. Broom clean all spaces before painting is started. All surfaces to be painted or finished are to be completely dry, clean and smooth.

2. See other sections of specifications for specified surface conditions and prime coat.

3. Perform preparation and cleaning procedures in strict accordance with the paint manufacturer’s instructions and as herein specified, for each particular substrate condition.

09 91 00 - 29

4. Clean surfaces before applying paint or surface treatments with materials and methods compatible with substrate and specified finish.

Remove any residue remaining from cleaning agents used. Do not use solvents, acid, or steam on concrete and masonry. Schedule the cleaning and painting so that dust and other contaminants from the cleaning process will not fall in wet, newly painted surfaces.

5. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:

a. Concrete: 12 percent.

b. Fiber-Cement Board: 12 percent.

c. Masonry (Clay and CMU’s): 12 percent.

d. Wood: 15 percent.

e. Gypsum Board: 12 percent.

f. Plaster: 12 percent.

B. Gypsum Plaster and Gypsum Board:

1. Remove efflorescence, loose and chalking plaster or finishing materials.

2. Remove dust, dirt, and other deterrents to paint adhesion.

3. Fill holes, cracks, and other depressions with CID-A-A-1272A finished flush with adjacent surface, with texture to match texture of adjacent surface. Patch holes over 25 mm (1-inch) in diameter as specified in

Section for plaster or gypsum board.

3.5 PAINT PREPARATION:

A. Thoroughly mix painting materials to ensure uniformity of color, complete dispersion of pigment and uniform composition.

B. Do not thin unless necessary for application and when finish paint is used for body and prime coats. Use materials and quantities for thinning as specified in manufacturer's printed instructions.

C. Remove paint skins, then strain paint through commercial paint strainer to remove lumps and other particles.

D. Mix two (2) component and two (2) part paint and those requiring additives in such a manner as to uniformly blend as specified in manufacturer's printed instructions unless specified otherwise.

E. For tinting required to produce exact shades specified, use color pigment recommended by the paint manufacturer.

3.6 APPLICATION:

A. Start of surface preparation or painting will be construed as acceptance of the surface as satisfactory for the application of materials.

09 91 00 - 30

B. Unless otherwise specified, apply paint in three (3) coats; prime, body, and finish. When two (2) coats applied to prime coat are the same, first coat applied over primer is body coat and second coat is finish coat.

C. Apply each coat evenly and cover substrate completely.

D. Allow not less than 48 hours between applications of succeeding coats, except as allowed by manufacturer's printed instructions, and approved by

COR.

E. Apply by brush or roller.

F. Do not paint in closed position operable items such as access doors and panels, window sashes, overhead doors, and similar items except overhead roll-up doors and shutters.

3.7 PRIME PAINTING:

A. After surface preparation, prime surfaces before application of body and finish coats, except as otherwise specified.

B. Spot prime and apply body coat to damaged and abraded painted surfaces before applying succeeding coats.

C. Gypsum Board:

1. Interior Latex Primer/Sealer: MPI #50.

2. Interior Alkyd Primer/Sealer: MPI #45.

3.8 EXTERIOR FINISHES: (NOT USED)

3.9 INTERIOR FINISHES:

A. Apply following finish coats over prime coats in spaces or on surfaces specified.

B. Gypsum Board:

1. New Work: One (1) coat of MPI 45 (Interior Primer Sealer) plus two (2) coat of Interior Latex (Eggshell): MPI #52 (Gloss Level 3)

2. Existing Surfaces: One (1) coat of Interior Latex (Eggshell): MPI #52

(Gloss Level 3)

3.10 REFINISHING EXISTING PAINTED SURFACES:

A. Clean, patch and repair existing surfaces as specified under “Surface

Preparation”. No “telegraphing” of lines, ridges, flakes, etc., through new surfacing is permitted. Where this occurs, sand smooth and re-finish until surface meets with COR’s approval.

B. Remove and reinstall items as specified under “General Workmanship

Requirements”.

C. Remove existing finishes or apply separation coats to prevent non compatible coatings from having contact.

09 91 00 - 31

D. Patched or Replaced Areas in Surfaces and Components: Apply spot prime and body coats as specified for new work to repaired areas or replaced components.

E. Except where scheduled for complete painting apply finish coat over plane surface to nearest break in plane, such as corner, reveal, or frame.

F. Refinish areas as specified for new work to match adjoining work unless specified or scheduled otherwise.

G. Sand or dull glossy surfaces prior to painting.

H. Sand existing coatings to a feather edge so that transition between new and existing finish will not show in finished work.

3.11 PAINT COLOR:

A. Latex System: MPI INT 9.2C.

1. Primer: Interior latex primer.

2. Topcoats: Interior latex (egg shell).

B. Submit 1 color card sample to Contracting Officer’s Representative for initial selection.

3.12 PROTECTION CLEAN UP, AND TOUCH-UP:

A. Protect work from paint droppings and spattering by use of masking, drop cloths, removal of items or by other approved methods.

B. Upon completion, clean paint from hardware, glass and other surfaces and items not required to be painted of paint drops or smears.

C. Before final inspection, touch-up or refinished in a manner to produce solid even color and finish texture, free from defects in work which was damaged or discolored.

File details come from the government source that posted it. Updated .