Amendment_1.pdf
PDF 38 KB Posted
- Solicitation number
- GS-05P-17-SL-D-0008
About this file
Amendment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| Amendment_2.pdf | ||
| Attachment_A_Preventative_Maintenance_Schedule.pdf | ||
| solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)
AMANDA FOSTER (217)492-5021
CONTRACTING OFFICER
amanda.foster@gsa.gov
15B. Contractor/Offeror 15C. Date Signed 16B. United States of America
(Signature of Contracting Officer)
16C. Date Signed
(Signature of person authorized to sign)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code Page of Pages 1 2
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable) 01 March 1, 2017
6. Issued By Code 7. Administered By (If other than Item 6) Code General Services Administration SEE BLOCK 6 Acquisition Management Division 520 S. 8th Street Springfield, Illinois 62703
AMANDA FOSTER 217-492-5021
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
GS05P17SLD0008
9B. Date (See Item 11) February 15, 2 017 10A. Modification of Contract/Order No.
10B. Date (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
( ) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This is an amendment to Solicitation GS05P17SLD0008, Mechanical Operations & Services, Peoria Federal Building, 100 N.E. Monroe Street, Peoria, IL and the Social Security Administration, 2401 Lind Street, Quincy, IL. Amendment 01 is being issued to reflect the following changes:
• See attachment for additional project specifications
• Bid due date shall remain the same.
SF30 Continuation of Block Narrative Page 2 of 2
Attachment
Q1) Section C.1.1 h) The Vehicle Barrier System is not part of the current O & M contract. Is this going to be added to this new contract? If so, the Preventative Maintenance Guide that is attached to this solicitation on Page 21 states the PM should be performed by a qualified Manufacture service rep.
A1) The O&M contractor will NOT be responsible for the Vehicle Barrier System. The barrier/gate is owned and maintained by the U.S. Marshall’s Service.
Q2) Please verify that the number of copies of the QC Plan, Past Performance References, Contractor’s Qualifications and Financial Information, and Pricing Proposal required for submission is one (1) original and three (3) copies.
A2) Electronic Proposals are the preferred method of delivery via email to amanda.foster@gsa.gov.
Quality Control Plan-1 original copy
Contractor’s Qualification and Financial Information-1 original copy
Past Performance Reference-1 for each (3-5 projects)
Pricing Proposal-1 original copy with signature and 3 copies*
*Note*-No copies are needed if sent electronically, just the scanned version of the original signature copy will be considered acceptable
Q3) Is elevator maintenance and inspections included in the contractor’s scope of work?
A3) No it is not included and will not be a part of the O&M contract.
Q4) What is the current monthly?
A4) The current monthly amount is $16,766.03 per month.
Q5) Does the Combined Synopsis/Solicitation under solicitation number GS05P17SLD0008 contain requirements similar to a current contract? If possible, please provide the current contract number.
A5)Yes. GS05P12SCA0030.
Q6) During the site visit at the Peoria Federal Building & U.S. Courthouse, we were not shown the Kitchen/Concessions Area as referenced in Section C.1.1 , Item m (Scope of Work). Section C.1.3 Item f (Exclusions) states that ductwork above the ceiling, grease traps with associated piping and any fire suppression or fire alarm equipment is to be included in the Scope of Work. Please verify if a Kitchen/Concessions Area is located within the Federal Building & Courthouse. If so, please provide the number and capacity of the grease traps, the approximate length of ductwork from the kitchen equipment hood(s) to the exterior wall and the quantity of heads and the manufacturer of the fire suppression system.
A6) There is no kitchen and/or grease traps in the Peoria Federal Building.
• Bid due date shall remain the same mailto:amanda.foster@gsa.gov
File details come from the government source that posted it. Updated .