SF30 Amend 0002.pdf
PDF 1 MB Posted
- Attached to
- Roof Replacement & Masonry Restoration (Phase 5)
- Solicitation number
- GS-05P-11-SV-C-0035
About this file
SF30 Amend 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amend 0003.pdf | ||
| SF30 Amend 0001.pdf | ||
| RFP GS05P11SVC0035.pdf | ||
| RFP GS05P11SVC0035 Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS ORDER ID ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Supplementary Page
PAGE 2 OF 5 GS-05P-11-SV-C-0035/0002
Description of Modification/Amendment:
RFP# GS-05P-11-SV-C-0035, Roof Replacement & Masonry Restoration (Phase 5), HDI Federal Center, Battle Creek, MI., Amendment #0002
This amendment is being issued to distribute the attached questions submitted by potential contractors and their corresponding answers.
This amendment must be acknowledged by the contractor by completing Box 15 of the SF30 and returning it with your proposal.
Proposal due date remains September 15, 2011 at 12:00 pm CST.
Supplementary Page
PAGE 3 OF 5 GS-05P-11-SV-C-0035/0002
PAGE 4 OF 5 GS-05P-11-SV-C-0035/0002
CONTRACTOR’S QUESTIONS & ANSWERS
GS-05P-11-SV-C-0035
ROOF REPLACEMENT & MASONRY RESTORATION (PHASE 5)
1 | P a g e
1. Per Det. 1 on sheet A – 203, the steps refer us to sheet A – 302. There is no Sheet A – 302.
These two notes were intended to reference Sheet A-202 which shows other aspects of the stairs to be repaired in the South elevation.
2. Per Det. 1 on sheet A – 301 there is no stucco on existing building, existing material is sand finished elastomeric coating, there is no room for flashing. Provided that this statement is correct, do not install flashing as indicated.
3. Per sheet A – 504 & Det. 3 on sheet A – 206 flashing already exists. Do you want flashing installed on the east elevation? The question is unclear. Sheet A-504 shows repairs for the concrete ramp. Sheet A-206 shows the Building 20 / Courtyard area. Please clarify the intent of the question.
4. Please Clarify General Note 1 on sheet A – 209. Is GSA’s intent to remove and reinstall at all 8 locations? The intent is all 8 locations.
5. On sheet A – 105, A – 106, and A – 107, the concrete facing of the 6 x 6 sections that we are replacing is deteriorating also, is GSA’s intent to replace the face also? Per the Contractor's photos, portions of this retaining wall are clearly deteriorated. However, it will have to be addressed as a change order during construction as we don't have enough information to create a scope based on quantities and locations.
6. Are we to assume the 6 x 6 sections are removal of 4” and replacement of 4”? Work with an assumed thickness of 6 inches. The Contractor will be responsible for confirming thickness during construction. If it is different from 6 inches, a contract modification will need to be made.
7. Is the EPDM membrane to be white or black? Black.
8. Drawing A 103 has a note to replace roof at the elevated corridor. Are there any details? As noted, Detail 5 on Sheet A-502 is similar. The substrate to construction the roof upon is wood.
9. What thickness of insulation is required at the elevated corridor? One inch minimum.
10. Specifications call for 1/2" DensDeck Prime cover board but it is not shown in some details. Is a cover board required in all locations or only where shown in details? The intent is to use the cover board in all locations.
11. Is new metal counterflashing required or can we reuse the existing metal counterflashing?
Provide as indicated on the documents.
12. What is the minimum thickness of insulation required at area of full tapered insulation? Per Sheet A-104, 3 inches is the minimum.
13. What thickness of insulation is required at Bldg. 31 and Corridor to Bldg. 1A? One inch minimum for Building 31. Three inches minimum for Building 1A.
14. Is tapered insulation required at Bldg. 31 and Corridor to Bldg. Insulation at these locations shall be tapered.
15. Specifications call for 75 mil EPDM. Black EPDM is manufactured in 45, 60 and 80 mils. White membrane is manufactured only in 60 mil. Which mil thickness should we quote? Carlisle Sure- Tough Reinforced EPDM which is called out to be the basis of design is manufactured in 75 mil
PAGE 5 OF 5 GS-05P-11-SV-C-0035/0002
CONTRACTOR’S QUESTIONS & ANSWERS
GS-05P-11-SV-C-0035
ROOF REPLACEMENT & MASONRY RESTORATION (PHASE 5)
2 | P a g e according to the manufacturer's product literature. If you elect to use another manufacturer, you must treat 75 mil as the minimum thickness and move up to the next available thickness. In this case 80 mil.
Questions 16 and 17 are about the stone repair at the front street entrance to building # 1.
The plans and specs called out to replace, repair or patch two front stones on the lower retaining wall.
16. Could you provide any information on what Quarry made the original stones? It is our opinion that they are beyond any acceptable repair at his time. Neither our office nor the Property Manager is able to obtain this information.
17. If original information is not available could an Allowance be added to the contract documents to cover the purchase of this two stones? While we do not object to the contractor's recommendation to replace the stones, the GSA Historic Preservation Branch specifically instructed our office during design not to replace these stones. Therefore, it is our understanding that no allowance should be added to replace these stones. Repair of the stones should remain in the base contract.
5PSSPP-11-0040
5PSSPP
Property Management Service Center PMSC Procurement Branch 230 South Dearborn Street, Suite 3800 Chicago IL 60604
Yes Off
GS-05P-11-SV-C-0035
Yes Off No See Schedule Off Off Off Off Off Off See Supplementary Page.
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 5 |
| DocNo: 0002 |
| EffDate: SEP 13, 2011 |
| ReqNo: 5PSSPP-11-0040 |
| ProjNo: |
| IssuedByCode: 5PSSPP |
| IssuedBy: Property Management Service Center |
PMSC Procurement Branch 230 South Dearborn Street, Suite 3800 Chicago IL 60604
| AdminByCode: |
| AdminBy: |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: GS-05P-11-SV-C-0035 |
| SolDate: AUG 26, 2011 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Supplementary Page. |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| Header: |
| 15B. CONTRACTOR/OFFEROR: |
| Footer1: |
| signature: |
File details come from the government source that posted it. Updated .