Amendment 0004.pdf
PDF 154 KB Posted
- Attached to
- RECOVERY: Scranton Windows Construction Federal contract opportunity
- Solicitation number
- GS03P10CDC0040
About this file
Amendment 0004 Addition of Options
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A 14-15.doc | DOC document | |
| Amendment 0006.pdf | ||
| Amendment 0005.pdf | ||
| Q A 1 - 7.doc | DOC document | |
| Amendment 0002 Extension.pdf | ||
| Amendment 0001.pdf | ||
| Sign In Sheets.pdf | ||
| ARRA Scranton PreProposal Conf minutes.pdf | ||
| Reminder Pre-Proposal Conference.doc | DOC document | |
| FORM 527.pdf | ||
| Pre-Proposal Conference Invitation.pdf | ||
| C201_Negotiated.pdf | ||
| SF 1442.pdf | ||
| C301.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED
(SEE
ITEM
11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Construction Contract – The Agreement C101 03/10
II.B Contract Price Form
PROPOSAL PRICE SHEET
BASE PROPOSAL: The contractor shall provide all construction services, management, supervision, labor, materials and equipment in accordance with the request for proposal.
1. Restore steel windows and marble spandrel panels $_____________
2. Allowance for new window hardware $ _____50,000.00 Per Specification Section 080151
3. Allowance for window performance testing $ _____20,000.00 Per Specification Section 080151
Total $_____________
OPTIONS:
1. Install a low e-film to minimize solar heat gain $_____________
2. New Marble Spandrel Panels $_____________
3. New Granite Spandrel Panels $_____________
Total $_____________
UNIT PRICES per Specification Section 01 2200:
1. New Stone Spandrel Panel $_________ each
2. New Cast Iron Mullion Cover Plate $________ Linear Ft
3. New Mullion Cover $_________ Linear Ft
4. New Mullion $_________Linear Ft
5. New Sill/Head/Jamb $_________ Linear Ft
6. New Sash Extrusion $_________ Linear Ft
7. New Frame Extrusion $_________ Linear Ft
8. New Integral Weatherbar $ _________ Each
GSA Contract No. GS-03P-10-CDC-0040 7 of 43
| IDCode: |
| EffDate: MAY 28, 2010 |
| ReqNo: 3PQCK-10-5004 |
| ProjNo: |
| IssuedBy: GSA CONTRACTS OPS BRANCH-PITTSBURGH SECTION |
THE STRAWBRIDGE BLDG -3PQCK
20 NORTH 8TH ST
PHILADELPHIA PA 19107-3191
| AdminBy: See Block 6 |
| NoCopies: 1 |
| Amended: Yes |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: Solicitation GS-03P-10-CDC-0040 is amended to read as follows: |
1. Options The referenced solicitation is amended to include 2 additional options as described below:
Option 2: New Marble Spandrel Panels Option 2 shall include the removal and returning to the owner existing marble spandrel panels and providing new marble spandrel panels per Division 04 Section Masonry Restoration and Division 08 Steel Window Restoration.
Option 3: New Granite Spandrel Panels Option 3 shall include removal and returning to the owner existing marble spandrel panels and providing new spandrel panels per Division 04 Section Masonry Restoration and Division 08 Steel Window Restoration.
2. The Proposal Price Sheet is replaced with the attached revision to accommodate the options described in this amendment.
3. All other terms and conditions of the original solicitation, as amended, apply.
| SignName: |
| SignTitl: |
| ContDate: |
| CODate: |
| OffrExt: Off |
| OffrNoEx: No |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Off |
| ContractorCode: |
| FacCode: |
| ContractorPOC: |
| AwdChg: Off |
| SolChg: Yes |
| SolNo: GS-03P-10-CD-C-0040 |
| SolDate: APR 12, 2010 |
| AwdNo: |
| IssuedByCode: 3PQCK |
| AdminByCode: |
| ContrOfficerInfo: |
| DocNo: 0004 |
| AwdDate: |
| text1: 10B. DATED (SEE ITEM 13) |
| block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) |
| pageblock: PAGE OF PAGES |
| block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. |
| Contractor: |
| ContratorInfo: |
| ModAmount: |
| block12: 12. ACCOUNTING AND APPROPIATION DATA (If required) |
| ApprData: See Schedule |
| Pages: 2 |
| Page: 1 |
File details come from the government source that posted it. Updated .