Additional Questions Received 8-11.pdf

PDF 14 KB Posted

Attached to
Boiler Replacement Project
Solicitation number
GS-03P-09-AZ-C-0004
Issued by

About this file

Additional Questions Received

View the file

Other files

File Type Posted
ALL QUESTIONS.pdf PDF
BMS Contractor.pdf PDF
Amendment 0003.pdf PDF
Additional Questions Received 40-51.pdf PDF
Additional Question 28.pdf PDF
Additional Questions 35-39.pdf PDF
Site Visit 3.pdf PDF
SF 24 Bid Bond.pdf PDF
Additional Questions Received 17-34.pdf PDF
FINAL QUESTIONS SUBMISSION.pdf PDF
Site Visit 2.doc DOC document
Additional Questions 15 16.pdf PDF
Additional Questions 12-14.pdf PDF
Completed Pre proposal Questions Answers.pdf PDF
Pre Proposal Minutes.pdf PDF
Amendment 0002.pdf PDF
Site Visit.pdf PDF
Amendment 0001.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional Questions Received #8-11

8.) Will a copy of the sign in sheet be available for review?

Response: Yes, the sign in sheet will be posted on FedBizzOpps.

9.) Please confirm the roof area outside the boiler mechanical room is available as a lay down area; advise of any precautions or concerns.

Response:

See answer to question (7). The roofing shall be protected by temporary covering so as to prevent damage during equipment lifts and lay downs. Multiple boiler lay downs on the roof at the same time shall not be permitted.

10.) Concerning the asbestos on the breeching. Is the General Contractor (Division #1) carrying this remediation cost or is this included in the mechanical specialty contractors cost?

Response: The cost of asbestos remediation shall be included in the price from all offerors. The asbestos abatement is part of this contract whether the prime contractor or a sub consultant performs the work is up to each offeror. The abatement firm must meet the qualifications listed in the abatement specification which was created by The Oak Group Inc. This specification is posted to FedBizzOpps as a separate document from VECSIE’s boiler replacement specification

11.) Regarding the Electrical work to be performed on this project, is it Mandatory for the Electrical Contractor to be in possession of a “City of Philadelphia” Electrical License?

Response: All contractors performing work must be licensed in the jurisdiction where the work is to be performed.