Additional Questions Received 40-51.pdf

PDF 10 KB Posted

Attached to
Boiler Replacement Project
Solicitation number
GS-03P-09-AZ-C-0004
Issued by

About this file

Responses to questions 40-51.

View the file

Other files

File Type Posted
ALL QUESTIONS.pdf PDF
BMS Contractor.pdf PDF
Amendment 0003.pdf PDF
Additional Question 28.pdf PDF
Additional Questions 35-39.pdf PDF
Site Visit 3.pdf PDF
SF 24 Bid Bond.pdf PDF
Additional Questions Received 17-34.pdf PDF
FINAL QUESTIONS SUBMISSION.pdf PDF
Site Visit 2.doc DOC document
Additional Questions 15 16.pdf PDF
Additional Questions 12-14.pdf PDF
Completed Pre proposal Questions Answers.pdf PDF
Additional Questions Received 8-11.pdf PDF
Pre Proposal Minutes.pdf PDF
Amendment 0002.pdf PDF
Site Visit.pdf PDF
Amendment 0001.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional Questions Received #40-51 Re: Boiler Replacement Project Byrne-Green Complex

40. On drawing M-D-103 it shows the pumps and all associated piping along with the pump bases to be removed, on drawing M-P-107 it shows the pumps as existing and only the boilers as new work. Please clarify – are the pumps being replaced?

Response: No, External recirculating pumps are not required.

41. Please provide the specifications on the new pumps if the existing pumps are being replaced

Response: See Answer to Question 40 above

42. On drawing E-D-101 it shows all conduit and wiring being removed on the existing pumps but there is no new work shown for new pumps, if the pumps are being replaced please provide wiring information---.motor starters, frequency drives controls etc.

Response: See Answer to Question 40 above

43. On drawing M-D-103 and again on drawing M-D-106 it shows the entire steel platform including the columns removed. Will new structural steel drawings be provided for the new platform?

Response: No, There will be no new Platform

44. As part of the control sequence please provide clarification on protection against pump cavitations.

Response: See Answer to Question 40 above

45. Is the control package required by this project totally integrated into the controls provided by the boiler manufacture or are there additional requirements for linking the controls of the new boilers to the front end of the existing building automation system (BAS)

Response: The control package required for full operation of the boilers is included as part of the integrated boiler control package. Refer to Division 23 specification section 235239 paragraph 75.1 sub F for BAS interface requirements.

The BMS was recently upgraded to the "Tridium 3216" system. The contractor responsible for maintaining the system is Green Energy Controls. Don Rowe is a point of contact. His phone number is 215-364-1482

46. Is the control sequence on MP107 in regard to the control of the valves and sequencing of the Boilers provided by the BCMS system or the Boiler Manufacturer?

If control is by the BCMS system is there a requirement for a user interface and graphic pages?

Response: Drawing MP 107 states…” Motorized Flow control Valves shall be controlled by signal from the boiler or Lead/Lag controller.” There is no requirement for BAS (BCMS)Graphics.

The BMS was recently upgraded to the "Tridium 3216" system. The contractor responsible for maintaining the system is Green Energy Controls. Don Rowe is a point of contact. His phone number is 215-364-1482

47. Are the existing controls and conduits for the BCMS system to be removed?

Response: Only that work as outlined on drawings ED101, MP107, and specification Division 23 section 235239.The control package required for full operation of the boilers is included as part of the integrated boiler control package. Refer to Division 23 specification section 235239 paragraph 75.1 sub F for BAS interface requirements.

The BMS was recently upgraded to the "Tridium 3216" system. The contractor responsible for maintaining the system is Green Energy Controls. Don Rowe is a point of contact. His phone number is 215-364-1482

48. Are there any requirements for the Boiler Manufacturer controls to provide alarm points to the BCMS system and will the BCMS system be connected to these points?

Response:Refer to answer to question 45 above.

49. If new pumps are added to the system, is there a control requirement for these pumps to operate with the minimum and maximum flow and the staging through the boilers?

Response: See answer to Question 40

50. Are the house pumps enabled with the Boilers or is there a warm up period for the Boilers before the pumps are enabled

Response: Refer to Sequence of operation on drawing MP107. Motorized Flow control Valves shall be controlled by signal from the boiler or Lead/Lag controller under low fire locked control until boiler meets minimum temperature. This is part of the integrated boiler control ICS system outlined in specification division 23 section 235239.

51. Is there any possibility the bid will be postponed?

Response: Proposal Due Date has been extended to Monday, December 15, 2008. Please see Amendment 0003.