ADDENDUM TO THE STANDARD FORM 1442

SAN JUAN HARBOR, PUERTO RICO MAINTENANCE DREDGING

30-FOOT PROJECT, AND MITIGATION PROJECT

SAN JUAN, PUERTO RICO

SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING

CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER

For GROUP 4 use: W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003);

Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13- D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008);

Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13- D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012);

Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); and C. F. Bean LLC (W912EP-13-D-0015)

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE

PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 4, DREDGING POOL.

TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:

(1) Availability of technically acceptable dredge(s)

(2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Construction Contract Administration Support System (CCASS) records contained in the US Army Corps of Engineers CCASS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

(1) All submissions shall be on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.

(2) Completed Bid Schedule (see Section 00010A)

(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph

2.4(c) of the MATOC

(4) Completed “Addendum to the Standard Form 1442”

(5) Revisions- offers offeror shall acknowledge receipt of revisions by completing the “notice to offerors—blocks 14,15 and 20”

(6) Revision – 0003 will not have to be Acknowledged by Offeror

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:

Block 9 -- For additional information contact: Timothy A. Donnellan, (904)232-3055 Timothy.a.Donnellan@usace.army.mil

Block 10 -- Magnitude of Construction is between $10,000,000.00 and $15,000,000.00

GROUP4-10-R-J028 Page 1 of 3 REVISION 0003 mailto:Timothy.a.Donnellan@usace.army.mil

Block 11 – The contractor shall begin performance within 45 90 calendar days and complete performance within 225 295 calendar days after receipt of the notice to proceed (NTP). This performance period is mandatory.

Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.

Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than: 2:00pm, EST on 11 August 2016.

Contracting Division – Attn: Timothy A. Donnellan U.S. Army Corps of Engineers 701 San Marco Blvd.

Jacksonville, FL 32207

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:

Block 14 -- Name and Address of Offeror (including Zip Code):

DUNS: CAGE: _

Block 15 -- Telephone No. (Include area code): _

Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):

Type/Print _ _

Signature: _

E-Mail: _ _

Offer Date: _ _ _

Block 26 -- This Task Order will be administered by:

North Puerto Rico Resident Office Annex Bldg, Fundación Angel Ramos 2nd Floor, Suite 202 Franklin D. Roosevelt Ave. #383 San Juan, PR 00918

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

GROUP4-10-R-J028 Page 2 of 3 REVISION 0003

SF 30 CONTINUATION SHEET

GROUP4-10-R-J028

SAN JUAN HARBOR, PUERTO RICO MAINTENANCE DREDGING

30-FOOT PROJECT, AND MITIGATION PROJECT

SAN JUAN, PUERTO RICO

THE PURPOSE OF THIS REVISION IS TO PROVIDE:

1. Changes under the SUBMISSION REQUIREMENTS: Number 5 – Correct the word offers to offeror

2. Changes under the SUBMISSION REQUIREMENTS: Add Number 6 – Revision – 0003 will not have to be Acknowledged by Offeror

3. Block 11 – Change The contractor shall begin performance with 90 calendar days and complete performance with 295 calendar days after receipt of the notice of proceed (NTP). This performance period is mandatory.

4. Change FAR Clause 52.211-10 COMMENCEMENT, PROSECUTION, AND

COMPLETION OF WORK (APR 1984)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 90 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 265 295 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

The total completion time of 265 295 calendar days includes the following:

Base Bid 145 calendar days (includes 45 calendar days mob/demob)

Option A 115 calendar days Option B 9 calendar days Option C 26 calendar days

(End of clause)

GROUP4-10-R-J028 Page 3 of 3 REVISION 0003

ADDENDUM TO THE STANDARD FORM 1442
For GROUP 4 use: W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13- D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Doc...
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:
Contracting Division – Attn: Timothy A. Donnellan