This is a bid package and contract documents file for paving improvements issued by Smiley Road Water Control and Improvement District No. 2 in partnership with PH Land Holdings, LLC (Developer) for the City of Celina in Denton County, Texas. The project scope includes approximately 9,380 square yards of 7-inch reinforced concrete pavement, 6-inch lime-stabilized base, hydrated lime material, 10-mil polyethylene sheeting, developer sidewalks, barrier-free ramps, and miscellaneous paving-related items including sign installation and connections to existing pavement. The bid documents were first advertised on August 8, 2026, and second advertised on August 15, 2026. Sealed bids must be received by 2:15 PM local time on Tuesday, August 25, 2026, at the office of BGE, Inc. in Frisco, Texas. There is no pre-bid conference scheduled. Bidders must conduct site visits during normal working hours and may request additional access for examinations and testing. Award will be made to the responsible bidder submitting the lowest responsive bid based on established selection criteria including responsiveness to requirements, proposal amount, project experience and references, scheduling and execution capability, safety record, and financial capability. Contract execution and bond delivery must occur within seven calendar days of the Notice of Award.
Bid security of five percent of the total bid amount is required in the form of a certified check, cashier's check, or bid bond. The contract will be a stipulated price agreement with unit price components based on estimated quantities, with final quantities and pricing determined by the Engineer. Progress payments will be made monthly at 90 percent of completed work value with 10 percent retainage, in accordance with Texas Water Code Section 49.276. Upon final completion and acceptance, remaining contract funds will be paid. Liquidated damages are specified at $1,000 per day for failure to achieve substantial completion and $5,000 per day for failure to complete remaining work after substantial completion. A Performance Bond and Payment Bond, each at 110 percent of the contract price, and a Maintenance Bond at 100 percent of the contract price are required. The contract includes a joint obligee rider naming both the District and the Developer as obligees. Contractor must demonstrate qualifications by providing evidence of successfully completing four similar projects within the DFW area in the last three years. The Owner is exempt from Texas sales and use taxes as a political subdivision and will provide tax exemption certification. Prevailing wage rates apply pursuant to Texas Government Code Chapter 2258, with contractors subject to a $60-per-worker-per-day penalty for underpayment. Additionally, contractors must comply with multiple statutory requirements including Form 1295 disclosure of interested parties, verification of no boycott of Israel, no business with designated terrorist organizations or countries, no discrimination against firearm entities, and no energy company boycott.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Green Meadows Tract 4B Utility Improvements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Documents and Specifications for Construction of
Paving Improvements for Green Meadows Tract 4B
City of Celina Texas ETJ Denton County, Texas
CONTENTS
I. INVITATION TO BIDDERS
II. INSTRUCTIONS TO BIDDERS
• Selection Criteria
III. AGREEMENTS BETWEEN OWNERS AND CONTRACTOR FOR
CONSTRUCTION CONTRACT
Exhibit A Contractors Bid Proposal Selection Criteria Exhibit B Form of Payment, Performance and Maintenance Bonds Exhibit C List of Drawings and Specifications Exhibit D Owner’s Special Conditions Exhibit E Memorandum of Contract Template
IV. STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT
• Special Specifications to General Conditions
V. CONTRACTOR CONSTRUCTION FORMS
• V(A) - AFFIDAVIT FOR PARTIAL PAYMENT
• V(B) - AFFIDAVIT FOR FINAL PAYMENT AND BILLS PAID
• V(C) - CERTIFICATE OF SUBSTANTIAL COMPLETION
• V(D) - CERTIFICATE OF COMPLETION
VI. PREVAILING WAGE RATE
VII. GENERAL REQUIREMENTS
VIII. TECHNICAL SPECIFICATIONS
IX. SPECIAL SPECIFICATIONS - INSURANCE
I - 1
Attention: Pursuant to Texas Government Code § 2252.908, unless you are a publicly traded entity or a wholly owned subsidiary of same, you must be able to provide Smiley Road Water Control and Improvement District No. 2 (the "District") with printed and signed copies of a completed disclosure of interested parties form (Form 1295) and a certificate of filling at the time of the District's execution of the contract. Failure to do so will result in the District's inability to execute the contract. To complete the disclosure of interested parties form, or for further information, please visit the Texas Ethics Commission's website at https://www.ethics.state.tx.us
First Advertisement Date: August 8, 2026 Second Advertisement Date: August 15, 2026
INVITATION TO BIDDERS
Sealed Bids addressed to Board of Directors, Smiley Road Water Control and Improvement District No. 2 will be received at the office of BGE, Inc., 2595 Dallas Parkway, Suite 101; Frisco, Texas, 75034 (Phone: 972-464-4800) until 2:15 PM Local Time, Tuesday August 25, 2026 at which time all bids will be opened and publicly read for the furnishing of all material, equipment, labor and supervision necessary or incidental to “Paving Improvements for Green Meadows Tract 4B, City of Celina ETJ, Denton County, Texas.”
Scope of Project:
1. Approximately 9,380 SY 7” Concrete Pavement
2. Misc. Paving Related Items
There will be NO PRE-BID CONFERENCE.
Each Bid must be accompanied by a bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided and provide the required insurance certificates within 7 days after the date Contract Documents are received by the Contractor.
Copies of the bidding documents may be obtained from www.CivcastUSA.com, search: Green Meadows Tract 4B Paving Improvements 13780-00. Bidders must register on this website to view and/or download specifications, plans, soils reports and environmental reports for this project.
There is NO charge to view or download documents.
The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board’s judgment will be most advantageous to the District and result in the best and most economical completion of the Project.
The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and Contractor agrees that the Contract Documents can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.
Smiley Road Water Control and Improvement District No. 2 https://www.ethics.state.tx.us/ http://www.civcastusa.com/
BGE Std. 2018 – Public II - 1
INSTRUCTIONS TO BIDDERS
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
B. Owner - the Owner is understood to be Smiley Road Water Control and Improvement
District No. 2. Funding for the project will be provided in accordance with the terms and conditions described in the Agreement or the Special Conditions of Agreement.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be viewed at the Issuing Office or obtained at www.civcastusa.com.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within five (5) days of Owner’s request, Bidder shall submit (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:
A. Evidence of Bidder’s authority to do business in the state of Texas.
B. Bidder’s state or other contractor license number, if applicable.
C. Subcontractor and Supplier qualification information; coordinate with provisions of
Article 12 of these Instructions, “Subcontractors, Suppliers, and Others.”
D. Evidence that Bidder has successfully completed 4 similar projects under the direction of the same firm. Successfully completed projects shall be located in the DFW area, completed within the last 3 years and shall be similar to this Work in scope and in magnitude of cost.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
http://www.civcastusa.com/
BGE Std. 2018 – Public II - 2
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF
SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor.
Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. reports and drawings known to Owner relating to Hazardous Environmental
Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding
Documents with respect to existing Underground Facilities at or adjacent to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
BGE Std. 2018 – Public II - 3
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. Bidder shall contact Engineer for information regarding access to the Site.
D. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
E. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
F. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
BGE Std. 2018 – Public II - 4
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the
General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
C. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
D. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
E. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
BGE Std. 2018 – Public II - 5
F. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
G. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work; and
H. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
There will be no pre-bid meeting associated with this project.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer through www.civcast.com. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda to all parties recorded as being a plan holder. Questions received less than 72 hours prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 Each Bid must be accompanied by Bid security made payable to Owner in an amount of five percent (5%) of Bidder’s total amount bid and in the form of a certified check, bank money order, or a Bid bond issued by a surety meeting the requirements of Paragraph
6.01 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 7 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or sixty-first (61st) day after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
http://www.civcast.com/
BGE Std. 2018 – Public II - 6
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days (calendar days) within which, or the dates by which, the Work is to be completed and ready for final payment, are set forth in the Agreement (or incorporated therein by reference to the attached Bid Form).
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute of materials and equipment subsequently approved by Engineer prior to submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received 72 hours prior to date for receipt of Bids. Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The burden of proof of merit of the proposed item is upon Bidder.
Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or
Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.
12.03 Bidders are required to disclose their list of the Subcontractors or Suppliers proposed for any part of the work.
12.04 If requested by Owner, Successful Bidder shall provide experience with pertinent information regarding similar projects and other evidence of qualification for each such
BGE Std. 2018 – Public II - 7
Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may request apparent Successful Bidder to submit an acceptable substitute without an increase in price.
12.05 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next most qualified, responsible, and responsive Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.
13.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner
(whose title must appear under the signature), accompanied by evidence of authority to sign. The partnership’s address for receiving notices shall be shown.
13.04 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the firm’s address for receiving notices shall be shown.
13.05 A Bid by an individual shall show the Bidder’s name and address for receiving notices.
13.06 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture’s address for receiving notices shall be shown.
13.07 All names shall be printed in ink below the signatures.
13.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
BGE Std. 2018 – Public II - 8
13.09 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
13.10 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the
State of Texas, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
BGE Std. 2018 – Public II - 9
ARTICLE 14 – BASIS OF BID
14.01 Lump Sum
A. Bidders shall submit a Bid on a lump sum basis as set forth in the Bid Form.
14.02 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
14.03 Allowances
A. For cash allowances, the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.
ARTICLE 15 – SUBMITTAL OF BID
15.01 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.”
15.02 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted
BGE Std. 2018 – Public II - 10 prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.
16.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with
Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but
Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 The owner will evaluate the bids in accordance with Subchapter D, Chapter 2269, Texas
Government Code, and the criteria for selection included at the end for the Invitation To Bidders.
19.02 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive.
Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.
19.03 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.
19.04 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
BGE Std. 2018 – Public II - 11
19.05 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
19.06 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 20 – BONDS AND INSURANCE
20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance, payment, and maintenance bonds as well as insurance requirements. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by the required original bonds, as well as original insurance documents.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within seven (7) days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner.
ARTICLE 22 – SALES AND USE TAXES
22.01 Owner is exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.309 as a political subdivision of the State of Texas. Owner shall provide Contractor with a completed Texas Sales and Use Tax Exemptions Certification as evidence of the applicability of such exemption and, accordingly, Contractor shall not collect Texas sales and use taxes from Owner with respect to this contract. Contractor and all subcontractors to Contractor shall issue a Texas Sales and Use Tax Exemption Certification with respect to, and shall not pay Texas sales and use taxes on, all purchases of the following items that are exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.311:
(i) tangible personal property that will be incorporated into Owner’s realty; (ii) tangible personal property that is necessary and essential for the performance of this contract and is consumed entirely on the job site; and (IV) taxable services for use in the performance of this contract that are performed at the job site and are either integral to the performance of this contract or expressly required to be provided by this contract. In addition, Contractor and all subcontractors to Contractor (i) shall not include any provision for Texas sales and use taxes with respect to such exempt items in any bid or contract amount, and (ii) shall pass on to the Owner cost savings due to the exempt status of such exempt items.
Contractor’s contracts with all subcontractors to Contractor shall include the foregoing provision regarding the exemption from Texas Sales and use taxes.
BGE Std. 2018 – Public II - 12
ARTICLE 23 – ADDITIONAL REQUIREMENTS
23.01 House Bill 1295 Implementation
Provision of Texas Ethics Commission Form 1295 (“TEC Form 1295”) by Bidders: Effective January 1, 2016, pursuant to Texas Government Code 2252.908 (the “Interested Party Disclosure Act” or the “Act”), the District may not award the contract to a bidder unless the bidder has provided to the District a completed, signed and notarized TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC’s website at https://www.ethics.state.tx.us, assigned a certificate number, printed, signed and provided to the district. The TEC Form 1295 must be submitted with the contractor’s bid. Neither the District nor its consultants have the ability to verify the information included in a TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any Bidder with respect to the proper completion of the TEC Form 1295.
ARTICLE 24 - LABOR CLASSIFICATION AND MINIMUM WAGE SCALE
24.01 Chapter 2258 of the Texas Government Code provides that any political subdivision of the State of Texas shall determine the general prevailing wage rate received by the classes of workers employed on projects similar to this project and shall specify in the call for bids and in the Contract the applicable minimum wage rates. The statute further provides that the Contractor of Subcontractors shall pay, as a penalty, to the Owner Sixty Dollars ($60.00) for each worker employed for each calendar day or part of the day that the worker is paid less that the wage rates stipulated in the Contract. The Owner is authorized to withhold from the Contractor the amount due under Contract.
The Statute likewise requires that the Contractor and Subcontractors keep an accurate record of the name and occupations of all persons employed by them in the construction of the Project and to show the actual per diem wages paid to each worker. These records are open to the inspection of the Owner.
24.02 The minimum wage rates that apply to this Contract are specified in the attachment hereto.
Contractor and Subcontractors shall review and ascertain such wage rates and pay at least such minimum rates.
ARTICLE 25 - HOUSE BILL 89 VERIFICATION
25.01 25.01 As required by Chapter 2270, Government Code, [CONTRACTOR] hereby verifies that [CONTRACTOR] does not boycott Israel and will not boycott Israel through the term of this Agreement. For purposes of this verification, “boycott Israel” means refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes.
https://www.ethics.state.tx.us/
BGE Std. 2018 – Public II - 13
ARTICLE 26 - SENATE BILL 252 VERIFICATION
26.01 As required by law, [CONTRACTOR] hereby represents and warrants that at the time of this Contract neither the [CONTRACTOR], nor any wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate of the [CONTRACTOR] (i) engages in business with Iran, Sudan or any foreign terrorist organization as described in Chapters 806 or 807 of the Texas Government Code, or Subchapter F of Chapter 2252 of the Texas Government Code, or (ii) is a company listed by the Texas Comptroller under Sections 806.051, 807.051 or 2252.153 of the Texas Government Code. The term "foreign terrorist organization" has the meaning assigned to such term in Section 2252.151 of the Texas Government Code.
CRITERIA FOR SELECTION
REQUIRED INFORMATION FOR SUBMISSION
OWNER shall use the following criteria for the selection of the proposal that offers the best value:
1. Responsiveness to RFP
a. Inclusion and thoroughness of submittal, with no evidence that information has been withheld
b. Note: This is a pass/fail item and will not receive a “weight”.
2. Proposal Amount (Price)
a. Base price for pre-construction and construction services related to proposed Project per the bid form table.
3. Project Experience and Reference
a. List similar projects of similar size and scope of the proposed Project completed or in progress within Texas (in the last 5 years), with emphasis on projects located in North Texas, and the value of each contract completed
i. Provide the project name, value, year completed
ii. Provide city/county/district associated with the above projects.
b. List any claims against the contractor, including:
i. Filed litigation against contractor
ii. Cross or counter claims against contractor
iii. Leins filed against contractor
iv. Any demand, claim, or assertion that has not yet risen to litigation
v. Description of any project awarded to contractor but not completed by contractor, whether at option of contractor or of owner.
c. Provide information on bidders delivery and performance history (timely delivery of completed projects - include projects that were delivered late)
d. Provide resumes of primary stakeholders of contractor
e. Provide resumes of primary personnel to be assigned to the job.
f. Provide 3 referrals from the last 5 years of others in the industry.
g. Provide location of home office
4. Scheduling and Execution
a. Provide evidence of bidder’s ability to self-perform proposed scope of the Project
b. Provide a time to mobilize after NTP
c. Provide days to substantial completion and days to final completion
d. Provide bidder’s equipment inventory and availability for proposed Project
5. Safety
a. Provide information of the bidder’s IRR
b. Provide bidder’s insurance modifier
c. Provide safety plan approach for the proposed Project
6. Financial Capability
i. Attach a financial statement, preferably audited, including your organization’s latest balance sheet and income statements showing the following items:
A. Current assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory, and prepaid expenses.)
B. Noncurrent assets (e.g., net fixed assets, other assets).
C. Current liabilities (e.g., accounts payable, notes payable (current), accrued expenses, provision for income taxes, advances, accrued salaries and accrued payroll taxes).
D. Noncurrent liabilities (e.g., notes payable).
E. Capital accounts and retained earnings (e.g., capital, capital stock, authorized and outstanding shares par value, earned surplus and retained earnings).
ii. Name and address of firm preparing attached financial statement and date thereof.
iii. Is the attached financial statement for the identical organization named in 1A above?
If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent subsidiary).
iv. Will the organization whose financial statement is attached act as guarantor of the contract for construction?
v. Provide name, address, and phone for bank reference.
vi. Surety: Name of bonding company, name and address of agent. A Payment Bond and Performance Bond for 110% of the Contract Price will be required upon execution of a contract. Proof of ability to provide the necessary Bonds will be required prior to selection.
CRITERIA SCORING TABLE
Company Name
Criteria Weight Score
Proposal Amount 50 0
Experience and Reference 20 0
Scheduling and Execution 20 0
Safety 5 0
Financial Capability 5 0
Total
Score 0
EJCDC Agreement between Owner and Contractor for Construction Contract (Stipulated Price) as modified by the Parties.
AGREEMENT BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)
FOR PH LAND HOLDINGS, LLC
This Agreement is by and between PH Land Holdings, LLC on behalf of the Smiley Road Water Control and Improvement District No. 2 ("Owner") and ______________________. (“Contractor”).
Smiley Road Water Control and Improvement District No. 2, an independent political subdivision of the State of Texas and a Water Control and Improvement district created and operating pursuant to the provisions of Section 59, Article XVI and Section 52-a, Article III of the Texas Constitution; and Chapters 49 and 51, Texas Water Code is sometimes referred to herein individually as the "District" and PH Land Holdings, LLC is sometimes referred to herein individually as the “Developer”.
Undefined terms used in this Agreement have the meanings stated in the General Conditions.
Owner and Contractor hereby agree as follows:
ARTICLE 1—WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:
• Approximately 9,380 SY 7” Reinforced Concrete Pavement
• Misc. Pavement Related Items
ARTICLE 2—THE PROJECT
2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Green Meadows Tract 4B, Paving Improvements.
ARTICLE 3—ENGINEER
3.01 The Owner has retained BGE, Inc to serve as the District Engineer and BGE Inc to serve as the Developer Engineer (“Engineer”) to act as Owner’s representative, assume all duties and responsibilities of Engineer, and have the rights and authority assigned to Engineer in the Contract Documents.
ARTICLE 4—CONTRACT TIMES
4.01 Time is of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Contract Times: Dates
A. The Work will be substantially complete on or before ________________ and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before _____________.
EJCDC Agreement between Owner and Contractor for Construction Contract (Stipulated Price) as modified by the Parties.
4.03 Intentionally Deleted.
4.04 Intentionally Deleted.
4.05 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time.
Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):
1. Substantial Completion: Contractor shall pay Owner one thousand and no/100 Dollars ($1,000.00) for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete.
2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner five thousand and no/100 Dollars ($5,000.00) for each day that expires after such time until the Work is completed and ready for final payment.
3. Intentionally Deleted.
4. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and final completion are not additive, and will not be imposed concurrently.
B. If Owner recovers liquidated damages for a delay in completion by Contractor, then such liquidated damages are Owner’s sole and exclusive remedy for such delay, and Owner is precluded from recovering any other damages, whether actual, direct, excess, or consequential, for such delay, except for special damages (if any) specified in this Agreement.
4.06 Special Damages
A. Contractor shall reimburse Owner (1) for any fines or penalties imposed on Owner as a direct result of the Contractor’s failure to attain Substantial Completion according to the Contract Times, and (2) for the actual costs reasonably incurred by Owner for engineering, construction observation, inspection, and administrative services needed after the time specified in Paragraph 4.02 for Substantial Completion (as duly adjusted pursuant to the Contract), until the Work is substantially complete.
B. After Contractor achieves Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times, Contractor shall reimburse Owner for the actual costs reasonably incurred by Owner for engineering, construction observation, inspection, and administrative services needed after the time specified in Paragraph 4.02 for Work to be completed and ready for final payment (as duly adjusted pursuant to the Contract), until the Work is completed and ready for final payment.
C. The special damages imposed in this paragraph are supplemental to any liquidated damages for delayed completion established in this Agreement.
EJCDC Agreement between Owner and Contractor for Construction Contract (Stipulated Price) as modified by the Parties.
ARTICLE 5—CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents, the amounts that follow, subject to adjustment under the Contract:
A. Intentionally Deleted.
B. For all Unit Price Work, an amount equal to the sum of the extended prices (established for each separately identified item of Unit Price Work by multiplying the unit price times the actual quantity of that item) as set forth in Exhibit A - the Contractor's Bid, attached hereto.
The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are based on estimated quantities. As provided in Paragraph 13.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer.
C. Intentionally Deleted.
D. Intentionally Deleted.
ARTICLE 6—PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
6.02 Progress Payments; Retainage
A. Developer shall make progress payments on the basis of Contractor’s Applications for Payment on or about the 25th day of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract.
a. ninety percent (90%) of the value of the Work completed (with the balance being retainage as required under Texas Water Code § 49.276).
1) Retainage will be paid to Contractor in accordance with Texas Water Code § 49.276. ); and
b. ninety percent (90%) of cost of materials and equipment not incorporated in the Work (with the balance being retainage).
B. Intentionally Deleted.
EJCDC Agreement between Owner and Contractor for Construction Contract (Stipulated Price) as modified by the Parties.
6.03 Final Payment
A. Upon final completion and acceptance of the Work, Owner shall pay the remainder of the Contract Price in accordance with Paragraph 15.06 of the General Conditions.
6.04 Consent of Surety
A. Owner will not make final payment, or return or release retainage at any time, unless Contractor submits written consent of the surety to such payment, return, or release.
6.05 Interest
A. All amounts not paid when due will bear interest at the rate stated below:
only as allowed under Tex. Gov't Code § 2251.021 et seq.
ARTICLE 7—CONTRACT DOCUMENTS
7.01 Contents
A. The Contract Documents consist of all of the following:
1. This Agreement.
2. Bonds (in the form required in Exhibit B attached to this Agreement):
a. Performance bond (together with dual obligee rider and power of attorney).
b. Payment bond (together with dual obligee rider and power of attorney).
c. Maintenance bond (together with dual obligee rider and power of attorney)
3. General Conditions.
4. Supplementary Conditions, if any.
5. Drawings and Specifications included on Exhibit C attached to this Agreement.
6. Exhibits to this Agreement (enumerated as follows):
a. Exhibit A - Contractor's Bid Proposal;
b. Exhibit B – Form of Payment, Performance, and Maintenance Bonds;
c. Exhibit C – List of Drawings and Specifications;
d. Exhibit D – Owner's Special Conditions; and
e. Exhibit E – Memorandum of Contract Template (to be completed and filed with Payment and Performance Bonds after execution of Agreement).
7. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto:
a. Notice to Proceed.
b. Work Change Directives.
c. Change Orders.
B. The Contract Documents listed in Paragraph 7.01.A are attached to this Agreement (except as expressly noted otherwise above).
EJCDC Agreement between Owner and Contractor for Construction Contract (Stipulated Price) as modified by the Parties.
C. There are no Contract Documents other than those listed above in this Article 7.
D. The Contract Documents may only be amended, modified, or supplemented as provided in the Contract.
ARTICLE 8—REPRESENTATIONS, CERTIFICATIONS, AND STIPULATIONS
8.01 Contractor’s Representations
A. In order to induce Owner to enter into this Contract, Contractor makes the following representations:
1. Contractor has examined and carefully studied the Contract Documents, including Addenda.
2. Contractor has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Contractor is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Contractor has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Contractor has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary…
This is the start of the file's text. The full file is on GovTribe.