GAOA Site Access Completion Columns of the Giants Plans_Updated_TH_FSup app.pdf
PDF 2 MB Posted
- Solicitation number
- 1051796
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section J PAL Fire Plan_Aug 2012-GAOA Site Access Completion Columns of the Giants to meet access standards.doc | DOC document | |
| RFQ final.docx | DOCX document | |
| wage determination.pdf | ||
| GAOA Site Access Completion Columns of the Giants to meet access standards Specifications.pdf | ||
| statement of work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
VICINITY MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVER SHEET 5/11/2022
G-02 GENERAL NOTES & BID SCHEDULE 5/11/2022
C-01 SITE PLAN 5/11/2022
C-02 BATHROOM REPLACEMENT 3/1/2021
C-03 ADA PATH 5/11/2022
FROM THE STANISLAUS NATIONAL FOREST OFFICE, TURN LEFT ON
GREENLEY ROAD. AFTER 0.5 MILES, TURN LEFT ON MONO WAY.
CONTINUE FOR 0.7 MILES BEFORE TURNING LEFT TO MERGE ONTO
SR-108 EAST. CONTINUE FOR 50.2 MILES, THEN THE DESTINATION WILL
BE ON THE RIGHT.
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER
FOREST SUPERVISOR
3/1 5/2
1 0 8:
K
AT
HR
YN
BA
KE
R
C:
\U
SE
RS
\K
AT
HR
YN
BA
KE
R\
BO
X\
EN
GI
NE
ER
IN
G\
FY
C
ON
TR
AC
TS
\G
AO
A
SI
TE
A
CC
ES
S
CO
MP
LE
TI
ON
C
OL
UM
NS
O
F
TH
E
GI
AN
TS
T O
ME
ET
A
CC
ES
S
ST
AN
DA
RD
S\
GA
OA
S
IT
E
AC
CE
SS
C
OM
PL
ET
IO
N
CO
LU
MN
S
OF
T
HE
G
IA
NT
S
CO
VE
RS
HE
ET
.D
W G
(R05) PACIFIC SOUTHWEST REGION
STANISLAUS NATIONAL FOREST
TUOLUMNE COUNTY
CALIFORNIA
GAOA SITE ACCESS COMPLETION
COLUMNS OF THE GIANTS
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/5 /22
:2
7 K
AT
HR
YN
BA
KE
R C:
\U
SE
RS
\K
AT
HR
YN
BA
KE
R\
BO
X\
EN
GI
NE
ER
IN
G\
FY
C
ON
TR
AC
TS
\U
NA
W
AR
DE
D
PR
OJ
EC
TS
\G
AO
A
SI
TE
A
CC
ES
S
CO
MP
LE
TI
ON
C
OL
UM
NS
O F
TH
E
GI
AN
TS
T
O
ME
ET
A
CC
ES
S
ST
AN
DA
RD
S\
GA
OA
S
IT
E
AC
CE
SS
C
OM
PL
ET
IO
N
CO
LU
MN
S
OF
T
HE
G
IA
NT
S
TO
M
EE
T
AC
CE
SS
S
TA
ND
AR
DS
P
LA
NS
.D W
G
(R05)
PACIFIC SOUTHWEST REGION
GAOA SITE ACCESS
COMPLETION
COLUMNS OF THE
GIANTS
STANISLAUS
NATIONAL FOREST
SUMMIT RANGER DISTRICT
GENERAL NOTES AND
SCHEDULE OF ITEMS
03/01/2021
FS090523_R102013_L1-002.dwg
K.BAKER
K.BAKER
T.HUGHES
051653-21-01
G-02
ABBREVIATIONS:
AB AGGREGATE ROAD BASE
AC ASPHALT CONCRETE
CMP CORRUGATED METAL PIPE
CO CONTRACTING OFFICER
COR CONTRACTING OFFICER'S REPRESENTATIVE
CY CUBIC YARD
LF LINEAR FOOT
SF SQUARE FOOT
STA STATION
SY SQUARE YARD
TYP TYPICAL
(N) NEW
WORK NOTES:
1. ALL FOREST SERVICE ROADS OR INFRASTRUCTURE DAMAGED BY CONTRACTOR DURING
CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR
2. BORROW SOURCES, IF NEEDED, WILL BE DESIGNATED BY THE FOREST SERVICE DURING
CONSTRUCTION
3. WASTE AREAS WILL BE DESIGNATED BY THE FOREST SERVICE DURING CONSTRUCTION
4. WATER SOURCES, IF NEEDED, SHALL BE DESIGNATED BY THE FOREST SERVICE DURING
CONSTRUCTION
5. UTILITIES: THERE MAY BE BURIED UTILITIES WITHIN THE PROJECT AREA. CONTACT 811
PRIOR TO DIGGING. DO NOT BEGIN GROUND DISTURBING WORK UNTIL A MEETING IS
HELD WITH THE FOREST SERVICE TO CONVEY THE LOCATION OF FOREST SERVICE
UTILITIES THAT NEED TO BE PROTECTED.
6. PROVIDE COPIES OF WEIGHT TICKETS FOR MATERIAL DELIVERED TO THE SITE FROM
COMMERCIAL SOURCES. AGGREGATE SHALL BE OBTAINED FROM AN APPROVED
SOURCE, CERTIFIED WEED FREE AND CERTIFIED TO CONTAIN NO MORE THAN 0.25%
ASBESTOS TO BE IN COMPLIANCE WITH CALIFORNIA HEALTH AND SAFETY CODE
SECTIONS 93105 AND 93106
7. ANY DISTURBANCE (SUCH AS BORROW SITES AND STAGING AREAS) SHALL BE
RESTORED
GENERAL NOTES:
1. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE
CONTRACT TO THE CO FOR APPROVAL PRIOR TO THE START OF WORK
2. REQUIRED WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS SHALL BE CONSIDERED
SUBSIDIARY TO OTHER PAY ITEMS
3. BEFORE ANY EXCAVATION ACTIVITIES BEGIN, THE CONTRACTOR SHALL CONTACT A
SERVICE TO LOCATE ANY BURIED UTILITIES. USA = 1-800-642-2444, THE NATIONAL 811
NUMBER, OR THE WEBSITE HTTP://WWW.USANORTH811.ORG/
4. EQUIPMENT FOR THIS PROJECT, IF DRIVEN ON STATE OR COUNTY ROADS, SHALL BE
CURRENTLY LICENSED
5. ALL WORK SHALL BE IN COMPLIANCE WITH THE BEST MANAGEMENT PRACTICES
DESCRIBED IN THE REGION 5 FOREST SERVICE SOIL AND WATER CONSERVATION
HANDBOOK, DATED DECEMBER 2011, AND THE NATIONAL BEST MANAGEMENT PRACTICES
FOR WATER QUALITY MANAGEMENT ON NATIONAL FOREST SYSTEM LANDS, DATED APRIL
6. ALL DIMENSIONS, UNLESS OTHERWISE SPECIFIED, ARE IN U.S. FEET
7. CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT AND SAFETY COMPLIANCE
SCHEDULE OF ITEMS
PAY ITEM NUMBER PAY ITEM DESCRIPTION UNIT SHEET NUMBER/DESCRIPTION
QUANTITY
REMARKS
01 70 00 MOBILIZATION LS
02 41 10 DOUBLE VAULT TOILET DEMOLITION EA C-02
13 40 00 DOUBLE VAULT TOILET INSTALLATION EA C-02
32 12 17.01 STRIPING, SINGLE WHITE LINE LF C-01 650
32 12 17.02 STRIPING, ACCESSIBLE MARKINGS LS C-01, C-03
32 12 17.03 STRIPING, DIRECTIONAL ARROWS EA C-01
AT EXISTING ARROW LOCATIONS
32 12 16.01 AC ADA DOOR APRON EA C-03
32 12 16.02 AC ADA PATHWAY LF C-03, C-04 40
5/11/2022
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/5 /22
:2
7 K
AT
HR
YN
BA
KE
R C:
\U
SE
RS
\K
AT
HR
YN
BA
KE
R\
BO
X\
EN
GI
NE
ER
IN
G\
FY
C
ON
TR
AC
TS
\U
NA
W
AR
DE
D
PR
OJ
EC
TS
\G
AO
A
SI
TE
A
CC
ES
S
CO
MP
LE
TI
ON
C
OL
UM
NS
O F
TH
E
GI
AN
TS
T
O
ME
ET
A
CC
ES
S
ST
AN
DA
RD
S\
GA
OA
S
IT
E
AC
CE
SS
C
OM
PL
ET
IO
N
CO
LU
MN
S
OF
T
HE
G
IA
NT
S
TO
M
EE
T
AC
CE
SS
S
TA
ND
AR
DS
P
LA
NS
.D W
G
(R05)
PACIFIC SOUTHWEST REGION
GAOA SITE ACCESS
COMPLETION
COLUMNS OF THE
GIANTS
STANISLAUS
NATIONAL FOREST
SUMMIT RANGER DISTRICT
SITE PLAN
03/01/2021
FS090523_R102013_L1-002.dwg
K.BAKER
K.BAKER
T.HUGHES
051653-21-01
C-01
RESTRIPE ADA
PARKING AND
PATHWAYS
RESTRIPE PARKING
AREA AS SHOWN
REPLACE DOUBLE
UNIT VAULT
TOILET (SHEET
C-02)
CONSTRUCT ADA PATH
CONNECTING TRAIL TO
BATHROOM (SHEET C-03)
RESTRIPE PARKING
AREA AS SHOWN
RESTRIPE PARKING
AREA AS SHOWN
NOTE: ALL PAVEMENT MARKINGS SHALL BE IN
ACCORDANCE WITH MUTCD "MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND
HIGHWAYS" 2009 EDITION AND CALDAG 2020 MANUAL
Feet
0 60 120
CLEAR BRUSH AS REQUIRED TO
ACCOMMODATE PARKING STALLS
RESTRIPE (4) DIRECTIONAL ARROWS
IN EXISTING LOCATIONS
5/11/2022
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/1 7/2
1 0 7:
K
AT
HR
YN
BA
KE
R
C:
\U
SE
RS
\K
AT
HR
YN
BA
KE
R\
BO
X\
EN
GI
NE
ER
IN
G\
FY
C
ON
TR
AC
TS
\G
AO
A
SI
TE
A
CC
ES
S
CO
MP
LE
TI
ON
C
OL
UM
NS
O
F
TH
E
GI
AN
TS
T O
ME
ET
A
CC
ES
S
ST
AN
DA
RD
S\
GA
OA
S
IT
E
AC
CE
SS
C
OM
PL
ET
IO
N
CO
LU
MN
S
OF
T
HE
G
IA
NT
S
TO
M
EE
T
AC
CE
SS
S
TA
ND
AR
DS
P
LA
NS
.D
W G
(R05)
PACIFIC SOUTHWEST REGION
GAOA SITE ACCESS
COMPLETION
COLUMNS OF THE
GIANTS
STANISLAUS
NATIONAL FOREST
SUMMIT RANGER DISTRICT
BATHROOM
REPLACEMENT
03/01/2021
FS090523_R102013_L1-002.dwg
K.BAKER
K.BAKER
T.HUGHES
051653-21-01
C-02
DEMOLISH RESTROOM STRUCTURE
DEMOLITION WORK NOTES:
1. CONTRACTOR TO DEMOLISH EXISTING RESTROOM STRUCTURE,
INCLUDING VAULT
2. PUMP (E) VAULT AND DISPOSE OF WASTEWATER PER REGULATORY
REQUIREMENTS
3. ALL DEBRIS TO BE REMOVED FROM FOREST SERVICE LANDS AND
DISPOSED OF IN A LANDFILL CERTIFIED FOR CONSTRUCTION DEBRIS
INSTALLATION WORK NOTES:
1. CONTRACTOR TO PREPARE INSTALLATION SITE FOR (N) TOILET UNITS
2. CONTRACTOR TO INSTALL 2-UNIT PREFABRICATED VAULT TOILET. THE BUILDING SHALL:
2.1. WITHSTAND 250 PSF SNOW LOADING
2.2. HAVE HORIZONTAL LAP SIDING/RIVER ROCK EXTERIOR TEXTURED WALL AND CEDAR SHAKE
TEXTURED ROOF OR APPROVED EQUAL
2.3. HAVE A MINIMUM
ROOF PITCH
2.4. HAVE A CONCRETE PREFABRICATED UNIFORM VAULT WITH POLYETHYLENE VAULT LINER INSERT, MINIMUM VOLUME OF 1000 GALLON PER TOILET COMPARTMENT, AND A HINGED VAULT CLEANOUT LID
ABLE TO BE LOCKED WITH A PADLOCK
2.5. UNIT TO COME WITH OPTIONAL WASTEBASKETS, CHASE, SOLAR VENT STACK FAN, VENT SCREEN, AND COMMERCIAL GRADE LOCKABLE DOORKNOBS ALL KEYED THE SAME (SCHLAGE OR EQUAL).
CONTRACTOR SHALL PROVIDE 10 KEYS
2.6. INCORPORATE SWEET SMELLING TECHNOLOGY (SST) INTO THE DESIGN OF THE VENTILATION
SYSTEM
3. FINAL INSTALLATION INCLUDES REMOVING RIGGING HARDWARE, PATCHING CONCRETE, SEALING JOINTS, AND COMPLETING ALL PREPARATION NECESSARY FOR THE BUILDING TO BE OPEN FOR PUBLIC USE
4. TOILET SHALL BE INSTALLED ROUGHLY IN EXISTING FOOTPRINT -- LOCATION TO BE STAKED BY COR.
CONTRACTOR SHALL USE (E) VAULT DEPRESSION FOR PLACING (N) UNIT WHEN APPLICABLE. REMOVE
ADDITIONAL MATERIAL AS NEEDED
5. EXCAVATIONS LEFT OPEN OVERNIGHT SHALL BE FENCED WITH WIRE OR PLASTIC MESH FENCE SECURED
TO STEEL POSTS TO COMPLETELY SURROUND EXCAVATION
5.1. THE BOTTOM OF FENCE SHALL FOLLOW THE CONTOUR OF THE GROUND
5.2. MAXIMUM SPACING OF STEEL POSTS SHALL BE 8'
5.3. MINIMUM HEIGHT OF FENCE SHALL BE 36"
6. ALL NATIVE MATERIALS EXCAVATED SHALL BE STORED AT EACH SITE
7. UNIT SHALL BE PLACED 3" ABOVE CLOSEST PAVEMENT GRADE AND PER MANUFACTURER'S
INSTRUCTIONS IN ACCORDANCE WITH OPERATIONAL AND ABA REQUIREMENTS. BACKFILL AROUND NEW
BUILDINGS TO 95% COMPACTION. GRADE TO DRAIN AWAY FROM BUILDINGS ON ALL SIDES
INSTALL VAULT TOILET
Feet
0 10 20
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/5 /22
:2
7 K
AT
HR
YN
BA
KE
R C:
\U
SE
RS
\K
AT
HR
YN
BA
KE
R\
BO
X\
EN
GI
NE
ER
IN
G\
FY
C
ON
TR
AC
TS
\U
NA
W
AR
DE
D
PR
OJ
EC
TS
\G
AO
A
SI
TE
A
CC
ES
S
CO
MP
LE
TI
ON
C
OL
UM
NS
O F
TH
E
GI
AN
TS
T
O
ME
ET
A
CC
ES
S
ST
AN
DA
RD
S\
GA
OA
S
IT
E
AC
CE
SS
C
OM
PL
ET
IO
N
CO
LU
MN
S
OF
T
HE
G
IA
NT
S
TO
M
EE
T
AC
CE
SS
S
TA
ND
AR
DS
P
LA
NS
.D W
G
(R05)
PACIFIC SOUTHWEST REGION
GAOA SITE ACCESS
COMPLETION
COLUMNS OF THE
GIANTS
STANISLAUS
NATIONAL FOREST
SUMMIT RANGER DISTRICT
ADA PATH
03/01/2021
FS090523_R102013_L1-002.dwg
K.BAKER
K.BAKER
T.HUGHES
051653-21-01
C-03
COMPACTED
SUBGRADE
4" COMPACTED CLASS 2
AGGREGATE BASE
2% MAX
4" ASPHALT
CONCRETE
TOILET FLOOR
N.T.S.
BATHROOM DOOR APRON SECTION
A-A
COMPACTED
SUBGRADE
4" COMPACTED
CLASS 2
AGGREGATE BASE
2% MAX
2" ASPHALT
CONCRETE
N.T.S.
PATHWAY SECTION, TYP.
B-B
5' MINIMUM TURNING
RADIUS AT PATH
INTERSECTION
EXISTING
GROUND
NATIVE BACKFILL
6"
NATIVE FILL FROM
ADJACENT SLOPE
5'
1'-6"
EXISTING
GROUND
5'
NOTE: MAXIMUM OF 5% SLOPE IN DIRECTION OF TRAVEL
A
C
B
C
REMOVE/ RELOCATE
BARRIERS AS
NECESSARY
CONSTRUCT AC
BATHROOM DOOR
APRON
STRIPE
WALKWAY
ACROSS ROAD
CONSTRUCT AC
PATHWAY
Feet
0 10 20
RECONSTRUCT CROSSING
OF EXISTING ASPHALT TO
MEET 2% CROSS SLOPE,
5% SLOPE IN TRAVELWAY
5/11/2022
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| GAOA Site Access Completion Columns of the Giants Coversheet-17x11 EXPANDED |
| GAOA Site Access Completion Columns of the Giants to meet access standards Plans-GENERAL NOTES AND SCHEDULE OF ITEMS |
| GAOA Site Access Completion Columns of the Giants to meet access standards Plans-SITE PLAN |
| GAOA Site Access Completion Columns of the Giants to meet access standards Plans-BATHROOM REPLACEMENT |
| GAOA Site Access Completion Columns of the Giants to meet access standards Plans-ADA PATH |
| GAOA Site Access Completion Columns of the Giants to meet access standards Plans-TRAIL REPAIR |
| GAOA Site Access Completion Columns of the Giants to meet access standards Plans.pdf |
| Sheets and Views |
| GAOA Site Access Completion Columns of the Giants to meet access standards Plans-GENERAL NOTES AND SCHEDULE OF ITEMS |
| GAOA Site Access Completion Columns of the Giants to meet access standards Plans-SITE PLAN |
| GAOA Site Access Completion Columns of the Giants to meet access standards Plans-ADA PATH |
| 2022-05-11T11:40:58-0700 | |
| TIMOTHY HUGHES |
| 2022-05-11T12:28:07-0700 | |
| SARAH LAPLANTE |
| 2022-05-11T20:28:42-0700 | |
| ELIZABETH MARTINEZ |
File details come from the government source that posted it. Updated .