Attach_III____Deductions.doc
DOC document 29 KB Posted
- Attached to
- Security Guard Services USGS EROS Federal contract opportunity
- Solicitation number
- G15PS00162
About this file
Deductions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_G15PS00162_Amd_000001.pdf | ||
| Attach_IX_WD_05-3025.pdf | ||
| Attachment_X_Past_Performance_Questionnaire.docx | DOCX document | |
| Attach_VI_____GFE.doc | DOC document | |
| Attach_II____SOP_G15PS00162.docx | DOCX document | |
| Attachment_VII__Release_of_Claims.doc | DOC document | |
| Attachment_VIII_Non-Disclosure.doc | DOC document | |
| Sol_G15PS00162.pdf | ||
| Attach_V_____CFE.doc | DOC document | |
| Attach_IV_____Training.docx | DOCX document | |
| Attach_I____Guard_Post_Orders.doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G15PS00162
ATTACHMENT III
CRITERIA FOR DEDUCTIONS
Price Deductions
Where security guard services are concerned, there is no way for the Government to obtain reperformance of non-provided or unacceptable work by the contractor’s employees. Therefore, the Government shall remedy the contractor’s non-performance or unacceptable performance through price deductions.
The Government may either accept in part or decline altogether deficient services rendered by the contractor. Following are criteria for deductions that the Government may take as a result of deficient performance.
Deduction for Failure to Provide Equipment, Materials, and Uniforms
In the event the Contractor fails to provide uniforms or equipment as approved by the CO, the CO will make an equitable adjustment in the contract price for the period of deficient performance. In determining the amount of the adjustment, the CO will use as a basis the amount it would cost the government to obtain the item(s) which the contractor failed to provide through rental, lease, or purchase. If the item is able to be rented or leased, the Government will deduct the rental/lease cost on a per shift basis when deficiencies occur. If the item is not readily available for rent or lease and must be purchased, the Government will deduct the full cost of the purchased item for the initial violation. Additional deductions will not be made for subsequent violations involving the same item, by the same employee. This will be the basis for adjusting payments regardless of whether the Government does in fact supply the item.
Deduction for Deficient Equipment, Uniforms, Appearance, etc.
In the event a contract employee is provided with defective equipment, defective uniforms, or his/her appearance is unsatisfactory, the COTR or his/her designee(s) shall, in writing, call the attention of the Contractor to the deficiency and request the deficiency be corrected within such time as the COTR or his designee(s) deems reasonable. If the Contractor does not correct the deficiency within the specified time, the CO shall deduct the costs of providing the service from the Contractor’s next monthly payment until the deficiency is corrected and evidence is provided to the CO or COTR proving the deficiency no longer exists by the Contractor.
Deduction for Loss, Damage, Destruction, or Unauthorized Use of Government Property
In the event any contractor employee loses, damages, destructs, or makes unauthorized use of Government property that causes the Government to incur costs to replace, repair or otherwise make whole the affected property, the Government shall notify the Contractor in writing of the nature of the damage, the costs associated with replacement, repair, etc., and the proposed deduction amount. The Contractor shall have 10 days to respond to the notice of intended deduction. The deduction, if assessed, will be taken from the next monthly payment.
Deduction for Failure to Provide Operable Vehicle In the event the contractor fails to provide vehicle(s) or the vehicle(s) provided is inoperable for any period of time, the Government shall deduct an equitable price from the contract, based on the estimated annual costs to the contractor to provide the vehicle(s). The contractor shall be responsible for furnishing vehicle operation costs to the CO or COTR upon the Governments request.
Deduction Schedule
The deduction rate for failure to provide required level of service shall be the established hourly rate contained in SOW Section 7 Training and Attachment J Exhibit III Guard Post Orders (Assignment) Record and Duties.
Deficiency
DEDUCTION
1. Guard working without valid Basic Training and
100% of the Productive Certification, CPR/AED/First Aid Training and rate for each hour employee Certification, Firearms Training and
Qualification Certification, and a preliminary favorable background suitability determination from OPM and USGS.
2. Failure to provide required relief breaks
Productive hourly rate, pro-rated for amount of relief not provided.
3. Backfill required to cover unmanned
No less than 100% of the posts or closing posts due to no backfill productive hourly rate and no available.
less than the cost for the services required to man post.
4. Failure to provide uniforms or equipment
Based on actual cost of purchase, lease, or rental pro-rated for time period in question
5. Failure to provide vehicle(s) performance
Based on pro-rated share of contractor’s actual costs
6. Loss, Damage, Destruction, or Unauthorized Use
Actual cost to of Government Property replace or repair the affected property.
File details come from the government source that posted it. Updated .