FY27 SOW Carpet Horner Hall Teaching Kitchen~2.docx
DOCX document 20 KB Posted
- Contract number
- 27-444DHS-ISDIS-P-102057
- Issued by
- Illinois
About this file
This is a Scope of Work document for Bid 27-444DHS-ISDIS-R-336544 issued by the Illinois School for the Deaf (ISD), a state agency under the Illinois Department of Human Services. The project involves carpet installation services at the ISD facility located at 125 S Webster Ave, Jacksonville, Illinois.
The scope requires bidders to supply and install 26 oz. commercial level loop carpet in blue or the closest available match throughout the Horner Hall teaching kitchen. Bidders must prepare the existing floor according to manufacturer specifications, replace all transitions throughout the kitchen, and provide all necessary tools, building materials, equipment, and labor to complete the installation. Daily cleanup and final debris removal are required. No subcontractors are permitted. A mandatory pre-bid meeting is scheduled for September 2, 2026, at 10:00 a.m. at the ISD main building. The project completion deadline is June 30, 2027. Point of contact is Chris Fairfield, Chief Engineer, at (217) 370-6145 or (217) 479-4253.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Standard Terms and Conditions v23.2~48.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Illinois School for the Deaf (ISD) Bid 27-444DHS-ISDIS-R-336544
1.1 Name of Project: ISD Carpet Installation Horner Hall Kitchen
1.2 Description of Project:
The Illinois School for the Deaf is seeking bidders to install carpet in the Horner Hall teaching kitchen.
1.3 Bidders must: Supply and install carpet over existing flooring in the Horner Hall teaching kitchen. Ensure floor is prepared according to manufacturer’s specifications. Supply and install new 26 oz. commercial level loop carpet in blue or closest available match. Replace all transitions throughout the kitchen. Supply all tools, building materials, carpet, equipment, labor and dumpsters to complete the job. Bidder must daily and on final completion of job, clean up all construction debris and materials.
1.4 Pre-Design Work completed to date (or) required: None
1.5 Additional Requirements and/or Conditions:
There will be a mandatory pre-bid meeting on Wednesday, 09/02/26, at 10:00am at the Illinois School for the Deaf, address- 125 S Webster Ave, Jacksonville IL 62650, Main Building 1st Floor Conference Room.
No subcontractors allowed.
1.6 Timeline of Project: Completed by 06/30/2027
Chris Fairfield Chief Engineer Illinois School for the Deaf
(217) 370-6145 work cell (217)479-4253 office