FY27 ADA Corridors Phase 1 Unspecified Construction - Summary

This is a project manual and invitation to bid issued by the City of Charlotte, North Carolina General Services for the FY27 ADA Corridors Phase 1 Unspecified Construction project (Bid Number 269-2027-001). The contract encompasses a variety of maintenance projects including approximately 400 feet of pathway replacements, 100 feet of curb replacements, 50 square yards of curb ramp replacements, and adjustment of utilities within the right-of-way. Work must be completed within dimensioned areas on individual plan sets, with material staging limited to 24-hour periods and no overnight equipment staging permitted. The goal is to task 10 to 15 project locations over two years while minimizing public impact. The pre-bid meeting is scheduled for August 6, 2026 at 11:00 AM via Microsoft Teams; bids are due electronically through the Procurement Portal by 1:00 PM on August 18, 2026, with public opening at 1:00 PM the same day. The itemized bid includes 62 line items covering excavation, asphalt paving, concrete work (sidewalks, curbs, ramps, shared-use paths), utility adjustments, traffic control, tree protection, seeding, and landscaping services. Successful bidders will receive a Notice to Proceed after contract award and execution, with a pre-construction conference to be scheduled with the contractor's superintendent and major subcontractors.

The estimated project cost ranges from $1.0 million to $2.5 million, and a five percent bid security is required for bids equaling or exceeding $300,000. Performance and payment bonds in the amount of 100 percent of the contract value are required within ten calendar days of award. The Charlotte Business Inclusion (CBI) Program establishes a Small Business Enterprise (SBE) goal of ten percent for this contract. Bidders must be properly licensed under North Carolina state law and demonstrate experience with similar work completed within the past three years. The project is subject to the 2024 NCDOT Standard Specifications and Charlotte Land Development Standards, with special provisions addressing mobilization, removal and replacement of pavement, curbs, sidewalks, ramps, safety rails, tree protection, and water/sanitary sewer utility adjustments. No sales and use tax qualifying as eligible taxes should be included in bids. Payment reporting to the City's InclusionCLT system is required as a condition of receiving payments under the contract.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL SERVICES

PROJECT MANUAL

FOR

FY27 ADA Corridors Phase 1 Unspecified Construction

PROJECT NUMBER:

BID NUMBER:

269-2027-001

CITY OF CHARLOTTE, NORTH CAROLINA

ADVERTISEMENT DATE:

July 20, 2026

2024 NCDOT STANDARD SPECIFICATIONS

v.3-24-2025 (Bonfire Version)

Bid Number: # 269-2027-001 Division 00 - Procurement & Contracting Requirements Project Name: FY27 ADA Corridors Phase 1 Unspecified Construction

Introduction 00 01 00 - 1

PROFESSIONAL ENGINEER SEAL

(Project Special Provisions Prepared for the City of Charlotte, General Services, 600 East Fourth Street, Charlotte, North Carolina 28202):

Docusign Envelope ID: 7DC2471C-B896-82CF-8371-A065056A9F6B

07/06/2026

Project #: 269-2027-001 Division 00 - Procurement & Contracting Requirements

Introduction 00 01 00 - 2

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 10 00 – INVITATION TO BID

00 20 00 – INSTRUCTIONS TO BIDDERS

ARTICLE 1: DEFINITIONS

ARTICLE 2: BIDDER’S REPRESENTATIONS

ARTICLE 3: BIDDING PROCEDURES

ARTICLE 4: BID AWARDS AND REJECTIONS

ARTICLE 5: POST-AWARD

00 40 00 – BID FORMS AND SUPPLEMENTS

ITEMIZED BID

CBI FORM 3 - Subcontractor / Supplier Utilization Commitment

COMMERCIAL NON-DISCRIMINATION CERTIFICATION

EXECUTION OF BID

00 50 00 – ACCEPTANCE BY THE CITY

00 55 00 – CHARLOTTE BUSINESS INCLUSION (CBI) PROGRAM

00 60 00 – PROJECT FORMS

00 70 00 – STANDARD SPECIAL PROVISIONS

ARTICLE 1: NCDOT STANDARD SPECIFICATIONS

1.1 NCDOT Standard Specifications

1.2 ERRATA

ARTICLE 2: CITY STANDARD PROVISIONS

2.1 Curb and Gutter Tapers and Transitions

2.3 Existing Utilities

2.4 CDOT Street Maintenance Division Street Cut Regulations

2.5 Concrete

2.6 Reclamation of Waste or Borrow Sources

2.7 Hazardous Materials

2.8 Sedimentation Pollution Control Act

2.10 Maintenance of the Project

2.11 Storage of Materials and Equipment

2.12 Subletting

2.13 Quantity Tickets

2.14 Periodic Payments

2.15 Final Payment

2.16 Payment Reporting

2.17 Sales and Use Tax

2.18 Allowances

2.19 Commercial Non-Discrimination Policy

2.20 E-Verify

Introduction 00 01 00 - 3

2.21 Iran / Israel

2.22 Indemnification

2.23 Guarantee

2.24 Insurance Requirements

2.25 Holiday Work Restrictions

2.27 Termination

2.28 Dispute Resolution

2.29 Surface Water Quality Protection

2.30 Prohibition of Use of High PAH Pavement Products

2.31 Billing Records

00 75 00 – PROJECT SPECIAL PROVISIONS

ARTICLE 1: GENERAL REQUIREMENTS

1.1 Contract Time

1.2 Liquidated Damages

1.3 Price Adjustments – Asphalt Cement for Plant Mix

1.4 Bituminous Plant Mix Pavements - Recycled

ARTICLE 2: SPECIAL PROVISIONS (SP)

SP-01, Project Mobilization Per Project Location SP-02, Removal Without Replacement Existing Pavements and Removal Without Replacement Existing Pavements and Existing Curb & Gutter SP-03, Remove and Replace Existing Curb and Gutter SP-04, Remove and Replace Existing Drives and Sidewalks SP-05, Remove and Replace 6” SHARED USE PATH SP-06, Remove and Replace 6” REINFORCED CONCRETE SIDEWALKS (BRIDGING TREE ROOTS, CLDS 40.11) . 7 SP-07, Remove and Replace 6” Concrete Wheelchair Ramps SP-08, Remove and Replace Concrete Bicycle Ramps SP-09, Remove and Replace 6” Yellow Tactile Guide Strip SP-10, Repair Wall, Precast Modular Retaining SP-11, Remove and Replace Safety Rail, Metal CLDS 50.04 SP-12, Inlet Protection Filter Bag SP-13, Adjust CDOT Pull Boxes/Vaults SP-14, Concrete Washout Structure SPL-01, Tree Protection Fence SPL-02, Seeding and Mulching

ARTICLE 3: CHARLOTTE WATER SPECIAL PROVISIONS

WATER AND SANITARY SEWER STANDARD SPECIFICATIONS

SPU-01, Adjust Water Valves, Water Meter & Meter Boxes, Water Manholes, Water Vaults, Sanitary Sewer Manholes & Sanitary Sewer Cleanouts

00 90 00 – ADDENDA

Introduction 00 01 00 - 4

LIST OF PLANS

Plans may be issued with a project/task order under the Contract as applicable.

INVITATION TO BID 00 10 00 - 1

00 10 00 – INVITATION TO BID

The City of Charlotte (hereinafter the “City”) will receive sealed bids for the following Project:

PROJECT NAME: FY27 ADA Corridors Phase 1 Unspecified Construction

PROJECT NUMBER: 269-2027-001

PRE-BID DATE: August 6, 2026

PRE-BID TIME: 11:00 AM

PRE-BID LOCATION: Microsoft Teams Meeting https://teams.microsoft.com/meet/219295045877573?p=p0ZQRAg3 HI1CG9noGd

Meeting ID: 219 295 045 877 573 Passcode: mk2hk7Vb Dial in by phone: 872-256-4172 Phone ID: 671 837 002#

The Pre-Bid meeting is not mandatory, but attendance is strongly encouraged.

BID DUE DATE: August 18, 2026 BID DUE TIME: Before 1:00 PM

BID SUBMISSION LOCATION: Bids must be submitted electronically through the Procurement

Portal (https://charlottenc.bonfirehub.com)

BID OPENING DATE: August 18, 2026

BID OPENING TIME: 1:00 PM

BID OPENING LOCATION: Microsoft Teams Meeting Only

Meeting Link:

https://teams.microsoft.com/meet/214898900065877?p=0V1ATNOt 80FfAxNXLo

Meeting Number (access code): 214 898 900 065 877 Meeting Password: r3vy7Yw

Call in (audio only): +1 872-256-4172 Phone Conference ID: 868 576 295#

NOTICE TO BIDDERS

The City will hold all Bid Opening Meetings via conference call or video conference only until further notice.

DESCRIPTION OF WORK:

This contract will encompass a variety of maintenance projects that will be tasked by the City. All work must be completed within the R/W as dimensioned on the individual plan sets. The contractor may not stage any material in the R/W for more than a 24-hr period and no staging of equipment overnight will be permitted. The goal on the projects is to minimize impacts to the public by only removing what can be feasibly replaced within a 24-hr period.

https://teams.microsoft.com/meet/219295045877573?p=p0ZQRAg3HI1CG9noGd https://teams.microsoft.com/meet/219295045877573?p=p0ZQRAg3HI1CG9noGd https://teams.microsoft.com/meet/214898900065877?p=0V1ATNOt80FfAxNXLo https://teams.microsoft.com/meet/214898900065877?p=0V1ATNOt80FfAxNXLo tel:+18722564172,,970981875

INVITATION TO BID 00 10 00 - 2

A typical project will consist of approximately 400 feet of pathway replacements, 100 feet of curb replacements, 50 square yards of curb ramp replacements, and adjustment of valves, boxes, and other items found within the existing pathway replacements. The goal of the contract is to task 10 to 15 project locations in two years.

Bidding documents, which includes a downloadable copy of one (1) Project Manual and one (1) full-size Drawing set, are available for free from the Procurement Portal.

Bidders must be properly licensed under North Carolina state law to perform the work.

A 5% bid security is required with each bid that equals or exceeds $300,000.

The estimated cost of this Project is between $1.0 m - $2.5 M

For information regarding this Invitation to Bid, contact as follow:

Brenda Faison, Contracts Administrator

600 East Fourth Street, Charlotte, NC 28202 Direct Phone: 980.406.7239 Email: Brenda.Faison@charlottenc.gov

Please submit questions or inquiries at least seven (7) calendar days before the Bid Due Date. Questions or inquiries past this deadline may not be addressed by the City prior to the Bid Due Date. Questions or inquiries should be submitted in writing through the Vendor Discussions section of the Procurement Portal (https://charlottenc.bonfirehub.com).

The City of Charlotte reserves the right to reject any and all bids and to waive any informalities or technicalities as it may deem to be in its best interest.

This project is subject to the requirements of the City’s Charlotte Business INClusion Program to promote diversity, inclusion, and local business opportunities in the City’s contracting and procurement process for Minority, Women, and Small Business Enterprises headquartered in the Charlotte Combined Statistical Area.

Following Charlotte Business INClusion goals have been established for this project:

SBE = 10%

Questions relating to the CBI Program should be addressed in writing to:

Joshua Burrus, Business Inclusion Specialist Lead Email: Joshua.Burrus@charlottenc.gov mailto:Brenda.Faison@charlottenc.gov https://charlottenc.bonfirehub.com/ mailto:Joshua.Burrus@charlottenc.gov

INSTRUCTIONS TO BIDDERS 00 20 00 - 1

00 20 00 – INSTRUCTIONS TO BIDDERS

ARTICLE 1: DEFINITIONS

Whenever the following terms are used in the NCDOT Standard Specifications, in any of the Contract Documents, or in the plans, the intended meaning of such terms shall be as follows:

1) “Chief Engineer”, or “State Highway Administrator” shall mean the “City Engineer”

2) “Alternate” or “Alternate Bid” shall mean the amount stated in the Bid which may be added to or subtracted from the Base Bid amount if such Alternate(s) are accepted by the City.

3) “Total Amount Bid” or “Total Base Bid” shall mean the correct sum total obtained by adding together the amounts bid for every item in the proposal including contingencies or allowances, but excluding Alternates.

4) “Board of Transportation” shall mean “City Council”

5) “City” shall mean the “City of Charlotte, North Carolina”; the City is the Project Owner

6) “City Engineer” shall mean the “Head of the City of Charlotte Engineering and Project Management

Division”.

7) “City Standard” shall mean the latest edition of the applicable “Charlotte Land Development Standards

Manual (CLDSM)”, “Charlotte-Mecklenburg Storm Drainage Design Manual”, “Charlotte Mecklenburg BMP Design Manual” and “Charlotte-Mecklenburg Utility Department Policies, Procedures, Standards and Specifications”

8) “Construction Manager”, “Engineer”, “Division Engineer” or “Resident Engineer” shall mean the City Engineer’s duly authorized Construction Manager to oversee the construction of the project

9) “Contract” shall mean the reciprocal undertakings, obligations, and rights of the City and the Contractor evidenced by the executed agreement and other Contract Documents between the City and the Contractor, covering the performance of and compensation of the Work.

10) “Contract Amount”, “Total Contract Amount” or “Contract Sum” shall mean the Total Base Bid plus Alternates accepted by the City.

11) “Contract Documents” shall consist of the Project Manual, all forms from Section 00 40 00, Bonds and Certificate of Insurance,, Acceptance by the City, and any change orders issued after execution of the contract.

12) “Date of Availability” shall mean “Notice to Proceed Date”

13) “Department”, “Department of Transportation”, “Division of Highways”, and “Raleigh Central Office” shall all mean “City of Charlotte General Services”.

14) “Procurement Portal” shall mean the electronic portal where Bids will be digitally submitted. The portal can be accessed at https://charlottenc.bonfirehub.com.

15) “Project Manual” shall mean the complete set of bidding documents issued by the City of Charlotte

General Services to include the Invitation to Bid, Instructions to Bidders, Bid Forms, sample project forms, conditions and special provisions of the contract, addenda issued prior to the execution of the contract, and drawings.

16) “State” shall mean “City of Charlotte”

17) “State Contract Officer” shall mean “Contract Officer”

18) “Supplemental Agreements” shall mean “Change Orders”

INSTRUCTIONS TO BIDDERS 00 20 00 - 2

ARTICLE 2: BIDDER’S REPRESENTATIONS

2.1 Contractor’s Licenses

Bidders shall be properly licensed under North Carolina state law to perform the Work specified in the Bidding Documents and per SECTION 102-14 of the NCDOT Standard Specifications. Bids received from bidders not meeting the applicable Contractors’ licensure requirements as required by law and as determined by the Engineer’s estimate may be considered non-responsive and may not be considered for award.

2.2 Bidder Qualifications

Bidders must be experienced in the class of work proposed who can refer to projects of similar magnitude and scope that have been successfully completed by them within the past three (3) years. Bidders to whom award of a Contract is under consideration may be required to submit to the City, upon request, a properly executed Contractor’s Qualifications Statement. The Contractor’s Qualifications Statement may include, but is not limited to, the Bidder’s past projects, financial capability, staff qualifications and availability, references, litigation or claims against the Bidder, list of equipment available to execute the Work and NCDOT pre-qualification status. The City reserves the right to request such qualifications from Bidders as part of its bid evaluation. The Bidder’s failure to submit the requested Qualifications Statement within the timeframe specified by the City may be grounds for bid rejection.

2.3 Site Investigation and Conditions Affecting the Work

By submitting a bid, Bidders certify to have carefully examined the Project site and familiarized themselves with the existing conditions on the Project, affecting the cost and execution of the work as described in Section 102-6 of NCDOT Standard Specifications.

ARTICLE 3: BIDDING PROCEDURES

3.1 Electronic Bids

All bids shall be prepared and submitted in accordance with the following requirements. Failure to comply with any of the requirement may cause the bid to be considered irregular and may be grounds for bid rejection.

1) Obtain an account on the Procurement Portal ‘Bonfire’ to bid electronically at https://charlottenc.bonfirehub.com.

2) Download and read carefully the Project Manual, Plans, and other supplemental documents related to this project from the Procurement Portal.

3) Download electronic bid submittal forms from the Procurement Portal. Bid submittal forms includes 1) Itemized Bid Form, 2) CBI Form -3 : Subcontractor / Supplier Utilization Commitment , 3) Commercial Non- Discrimination Certification Form, and 4) Execution of Bid Form. Each form must be completed in its entirety. Upon completion, bidders shall upload them back on the Procurement Portal as part of the bid submittal. Failure to complete and submit the required forms may be grounds for bid rejection.

4) Itemized bid form in Microsoft Excel format must be completed in its entirety. Bidders shall enter a unit price for each line item requiring a bid amount. The electronic version of the Itemized Bid Form will contain formulas to calculate the extensions, percentages and totals which shall not be altered by the bidders.

5) The bid shall be accompanied by a bid bond or bid deposit when applicable. The bid bond shall be prepared in accordance with Article 3.3 Bid Security of this section.

6) Addenda will be published on the Procurement Portal. Bidders shall be responsible for inquiring if any addendum has been issued and shall acknowledge receipt of all addenda on the “Execution of Bid” Form.

All addenda shall become part of the Contract Documents whether or not received or acknowledged by the Bidder.

INSTRUCTIONS TO BIDDERS 00 20 00 - 3

7) All bids shall be submitted with an electronically affixed digital signature. Affixing a digital ID to the bid shall be equivalent of signing before a notary public. If the bidder does not have such digital ID, a wet signature will be acceptable when it is notarized on the bid form.

8) On the day of the bid opening, bids will be opened and read publicly at the time mentioned on the Invitation to Bid.

3.2 The Project Manual

The Project Manual is the bidding document and shall not be altered.

3.3 Bid Security

A five-percent (5%) bid security is required with each bid that equals or exceeds $300,000. Bid Bond or Bid Deposit, made payable to the City of Charlotte, must be provided in accordance with Section 102-10 of NCDOT Standard Specifications.

3.3.1 Electronic Execution of Statutorily-Required Bid Bond

Traditionally, the City has required bonds to be submitted as hard copies with wet signatures. Until further notice, the City will also accept electronically executed bid bonds to satisfy the requirements of N.C.G.S. 143-129(b). In order for electronically executed bid bonds to be valid, a principal and N.C. licensed surety must agree to transact by electronic means. Additionally, the City requires the bidder and surety to use digital signatures that have the following characteristics: (a) each signature is unique to the person using it; (b) the signatures are capable of certification; and (c) each signature is under sole control of the person using it. The notary requirement is waived for bid bonds that are signed electronically.

The bid bond must meet all other statutory criteria for bid bonds and must be submitted in compliance with the Instruction to Bidders. The City reserves the right to reject bid bonds that do not meet the above criteria.

3.4 Sales and Use Tax

Refer to Section 00 70 00 of this Project Manual for additional information on sales and use tax. The City reserves the right to request from the bidder after bid opening the estimated amount of total Eligible Taxes that were used to calculate the Bid and any supporting documentation of such. The Bidder, in submitting the Bid for consideration, agrees to provide any such sales or use tax estimates or documentation that may be requested by the City.

ARTICLE 4: BID AWARDS AND REJECTIONS

4.1 Bid Opening

Bid Opening will be conducted in accordance with Section 102-13 of NCDOT Standard Specifications.

4.2 Rejection of Bids and Disqualification of Bidders

Rejection of Bids and Disqualification of Bidders will be provided in accordance with Sections 102-14 and 102-15 respectively of NCDOT Standard Specifications.

4.3 Award and Execution of Contract

Award and execution of Contract will be in accordance with Section 103 of NCDOT Standard Specifications.

The City will award the contract or contracts conditioned upon funds being available for construction and other governmental approvals as may be required.

The City reserves the right to accept Alternates in any order or combination. The City reserves the right to determine the low bidder on the basis of the Total Base Bid with Accepted Alternates.

INSTRUCTIONS TO BIDDERS 00 20 00 - 4

ARTICLE 5: POST-AWARD

5.1 Bonds and Insurance

For bids equal to or greater than $300,000, the successful bidder shall provide the City with performance and payment bonds each in the amount equal to one hundred percent (100%) of the contract amount. Bonds shall be submitted to the City upon ten (10) calendar days of award of the Contract and shall be in conformance with NC GS 44A-33. Failure to provide acceptable bonds within ten (10) calendar days of award of the Contract shall be just cause for forfeiture of the bid bond or bid deposit and rescinding the award of the Contract. Award may then be made to the next lowest responsive, responsible bidder or the Project may be re-advertised at the City’s sole discretion.

The Contractor shall submit to the City within ten (10) calendar days of recommendation of award of the Contract a certificate of insurance in the minimum amounts required in the Contract Documents.

5.1.1 Electronic Execution of Statutorily-Required Performance and Payment Bonds Traditionally, the City has required bonds to be submitted as hard copies with wet signatures. Until further notice, the City will also accept electronically executed performance and payment bonds to meet the requirements of N.C.G.S. 143-129(c) and Article 3 of Chapter 44A of the General Statutes. In order for electronically executed bonds to be valid, a principal and N.C. licensed surety must agree to transact by electronic means. Additionally, the City requires the bidder and surety to use digital signatures that have the following characteristics: (a) each signature is unique to the person using it; (b) the signatures are capable of certification; (c) each signature is under sole control of the person using it; and (d) each signature is linked to document in such a manner that if the text of the document is changed, the electronic signature is invalidated. The notary requirement is waived for payment and performance bonds that are signed electronically and electronically submitted.

Per N.C.G.S. 44A-33, bonds are still required to be submitted to the City upon ten (10) calendar days of award of the Contract.

The bonds must meet all other statutory criteria for payment and performance bonds and must be submitted in compliance with the Instruction to Bidders. The City reserves the right to reject payment and performance bonds that do not meet the above criteria.

5.2 Pre-Construction Conference

A pre-construction conference will be scheduled as soon as practical after award of the Contract. The Contractor shall attend the pre-construction conference with the prospective project superintendent, any anticipated major subcontractors and major suppliers. A proposed progress schedule in a form satisfactory to the Construction Manager and a statement of the anticipated monthly progress payments showing the percent of progress each month shall be submitted by the Contractor to the City. The Contractor shall also provide at least two (2) local telephone numbers that may be used to contact the Contractor or the Contractor’s authorized representative in the event of an emergency after normal business hours. The Contractor shall also provide the name of the Contractor’s on-site representative who is OSHA certified for trenching, shoring, and confined space entry.

5.3 Notice to Proceed

The City will issue a Notice to Proceed (NTP) to the Contractor upon award and execution of the contract. The Contractor shall not perform any Work prior to the date on which the NTP commences. The City reserves the right to issue an Administrative Notice to Proceed authorizing the Contractor to place orders for products requiring long lead times, or to obtain certain permits prior to beginning any Work. If an Administrative Notice to Proceed is issued, the Contractor shall not perform any Work prior to the date on which the Notice to Proceed commences.

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 1

00 40 00 – BID FORMS AND SUPPLEMENTS

Bidder shall download individual BID FORMS posted on the Procurement Portal at https://charlottenc.bonfirehub.com

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 2

ITEMIZED BID

Bidder Name:

Bid #: 269-2027-001

SECTION 1: BID

Item # Section # Description Qty Unit Unit Price ($) Amount Bid ($)

(Qty x Unit Price)

1 SP-01 Project Mobilization ($2500 or 5%) 15 EA

2 226 Undercut Excavation 10 CY

230 Borrow Excavation 125

CY

350 Pipe Cleanout 5

EA

520 Aggregate Base Course 25

TN

545 Incidental Stone Base 25

TN

607 Milling Asphalt Pavement, 0.0" to 3.0" 20

SY

Asphalt Concrete Base Course, Type B 25.0C

TN

Asphalt Concrete Intermediate Course, Type I 19.0C

TN

Asphalt Concrete Surface Course, Type S 9.5C

TN

Asphalt Concrete Surface Course, Type S 9.5B

TN

620 Asphalt Binder for Plant Mix 10

TN

858 Adjustment of Catch Basins 5

EA

858 Adjustment of Drop Inlets 5

EA

858 Adjustment of Manholes 5

EA

Sign Erection, Relocate Type D (Ground Mounted)

EA

Sign Erection, Relocate Type E (Ground Mounted)

EA

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 3

(Qty x Unit Price)

SP-02

Removal without replacement of Existing Pavement, Drives & Sidewalks

SY

SP-02

Removal without replacement of Existing Curb & Gutter

LF

SP-03

Remove and Replace 1' 6" Concrete Curb and Gutter

LF

SP-03

Remove and Replace 2' 0" Concrete Valley Gutter, CLDS 10.17B

LF

SP-03

Remove and Replace 2' 6" Concrete Curb and Gutter

LF

SP-03

Remove and Replace 6" X 18" Concrete Curb

LF

SP-04

Remove and Replace 4" Concrete Sidewalk

SY

SP-04

Remove and Replace 6" Concrete Sidewalk

SY

SP-04

Remove and Replace 6" Concrete Driveway

SY

SP-05

Remove and Replace 6” Shared-Use- Path

SY

SP-06

Remove and Replace 6" Reinforced Concrete Sidewalks (Bridging Tree Roots, CLDS 40.11)

SY

SP-07

Remove and Replace 6" Concrete Curb Ramps

SY

SP-08

Remove and Replace Concrete Bicycle Ramps

SY

SP-09

Remove and Replace 6" Yellow Tactile Guide Strip

LF

SP-10

Repair Existing Wall, Precast Modular Block Retaining

SF

SP-11

Remove and Replace Safety Rail, Metal

CLDS 50.04

LF

SP-12

Catch Basin or Drop Inlet Protection - Filter Bag

EA

SP-13

Adjust Existing 13”x 24"x 12” CDOT

PULL BOX

EA

SP-13

Adjust Existing 17”x 30"x 24” CDOT

PULL BOX

EA

SP-13

Adjust Existing 24”x 36"x 24” CDOT

PULL BOX

EA

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 4

(Qty x Unit Price)

SP-13

Adjust Existing 36”x 36"x 12” CDOT Vault

EA

SP-14 Concrete Washout Structure 15 EA

SPL-01 Tree Protection Fence 1300 LF

SPL-02 Seeding and Mulching 4000 SY

1110 Work Zone Signs (Portable) 400 SF

1110 Work Zone Signs (Stationary) 400 SF

1110 Work Zone Signs (Barricade Mounted) 200 SF

1115 Flashing Arrow Board 5 EA

Portable Changeable Message Board (Short Term)

50 DY

1130 Drums 10 EA

1135 Cones 225 EA

1145 Barricades (Type III) 150 LF

1150 Flagger 50 DY

1110 Work Zone Signs (Barricade Mounted) 100 SF

1165 TMA 3 EA

1170 Water Filled Barrier 50 LF

1170 Remove and Reset Water Filled Barrier 100 LF

1180 Skinny Drum 400 EA

1190 Law Enforcement 5 HR

SPU-01 Adjust Existing Water Valve 8 EA

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 5

(Qty x Unit Price)

SPU-01 Adjust Existing Meter and Meter Box 50 EA

SPU-01 Adjust Existing Water Manhole 5 EA

SPU-01 Adjust Existing Water Vault 2 EA

SPU-01 Adjust Existing Sewer Manhole 2 EA

SPU-01

Adjust Existing Sanitary Sewer Cleanout

4 EA

Subtotal

Contingency

Total Bid

Do not include any North Carolina Sales and Use Tax that qualifies as Eligible Taxes per Section 00 70 00, Subsection 2.17

“Sales and Use Tax”.

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 6

CBI FORM 3 - Subcontractor / Supplier Utilization Commitment (page 1 of 2)

This form MUST be submitted at the time of Bid Opening. Copy this CBI Form 3 as needed.

Failure to properly complete and submit Form 3 with the Bid constitutes grounds for rejection of the Bid.

Per Section 3.5 of the CBI Administrative Procedures Manual, the Subcontractor/Supplier Utilization Commitment (CBI Form 3), captures information regarding the MWSBEs and other subcontractors and suppliers that the Bidder intends to use on the Contract FOR ALL TIERS.

For Construction Contracts under $500,000, M/W/SBEs must satisfy the requirements of Section 2 of the CBI Administrative Procedures Manual in order to count the work they intend to perform on the contract with its own current workforces towards the established Subcontracting Goal, and must list themselves below along with their projected utilization amount.

Bidder Name:

Project Name: FY27 ADA Corridors Phase 1 Unspecified Construction

Established MWBE Goal: Established MBE Goal:

Established MSBE Goal: Established WBE Goal:

Established SBE Goal:

List below all M/W/SBEs (Non-Hauling Services) that you intend to use on this Contract. NOTE: You will only receive credit for M/W/SBEs that are currently certified with the City as of the Bid Opening Date.

M/W/SBE Vendor Name (Non-Hauling Services)

Description of work / materials NIGP Code Total Projected Utilization ($)

For all hauling services on this Contract, list below all SBEs and MBEs that you intend to provide such work and the Total Projected Utilization ($).

M/W/SBE Vendor Name (Hauling Services)

Description of work / materials NIGP Code

Total Subcontractor / Supplier Utilization (including SBEs, MBEs, WBEs, and Non-MWSBEs) $

Total MBE Utilization $

Total WBE Utilization $

Total SBE Utilization $

Total MWBE/MSBE Utilization (if goal listed above is combined) $

Total Bid Amount (including Contingency) $

Percent MBE Utilization* (Total MBE Utilization divided by Total Bid Amount) %

Percent WBE Utilization* (Total WBE Utilization divided by Total Bid Amount) %

Percent SBE Utilization* (Total SBE Utilization divided by Total Bid Amount) %

Percent MWBE/MSBE Utilization* (Total MWBE or MSBE Utilization divided by Total Bid Amount) %

* The M/W/SBE Utilization percentage stated MUST be rounded to (2) decimal places.

Version 06-2023

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 7

CBI FORM 3: Subcontractor / Supplier Utilization Commitment (page 2 of 2)

List below all non-M/W/SBEs (subcontractors and suppliers) that you intend to use on this Contract

Vendor Name Description of work / materials NIGP Commodity Code

Projected Utilization (if known) ($)

Letters of Intent submitted upon notice from the City Per Section 3.5 of the CBI Administrative Procedures Manual, within three (3) Business Days after receiving a request from the City (or within such longer time as may be communicated by the City in writing), Bidders must submit a separate Letter of Intent (CBI Form 4) for each M/W/SBE listed on CBI Form 3. Each Letter of Intent must be executed by both the M/W/SBE and the Bidder. The City shall not count proposed M/W/SBE utilization for which it has not received a Letter of Intent by this deadline. In addition, a Hauler’s fees or commissions charged by an MWSBE hauler for providing a Commercially Useful Function shall count towards meeting the applicable Contract Goals. The costs of a hauler’s materials or supplies shall not count as part of the fees or commissions. The Bidder is still obligated to pay the M/W/SBE the full amount listed on the Contract with the M/W/SBE regardless of what percentage is actually counted towards the M/W/SBE Goal.

Adding subcontractors or suppliers after submitting this form Nothing in this certification shall be deemed to preclude you from entering into subcontracting arrangements after submission of this form. However, per the CBI Administrative Procedures Manual, you must comply with the following:

• You must maintain the level of M/W/SBE participation proposed on this CBI Form 3 (and CBI Form 3A, if applicable) throughout the duration of the Contract, except as specifically allowed in Section 5

• If you need to terminate or replace a M/W/SBE, you must comply with Section 5.3

• If the scope of work on the Contract increases, or if you elect to subcontract any portion of work not identified on this form as being subcontracted, then you must comply with Section 5.4

• A Letter of Intent (CBI Form 4) must also be submitted for each M/W/SBE you add subsequent to contract award.

All Subcontractors and Suppliers must be registered with the City of Charlotte.

Pursuant to the City’s Vendor Registration Policy, each subcontractor or supplier (non-MBE/SBE, WBEs, SBEs and MBEs) that you use on this contract must be registered in the City’s vendor database.

Signature

Your signature below indicates that the undersigned firm certifies and agrees that:

(a) It has complied with all provisions of the CBI Policy and Administrative Procedures Manual; and,

(b) Failure to properly document such compliance in the manner and within the time periods established by the CBI Policy and Administrative Procedures Manual shall constitute grounds for rejection of your bid.

Signature of Authorized Official Printed Name Title Submittal Date

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 8

CBI FORM 3B: UTILIZATION COMMITMENT – TASK ORDER

(page 1 of 2) This form MUST be submitted at the time of Task Order Submittal. Copy this CBI Form 3B as needed.

Failure to properly complete and submit Form 3B at the time of Task Order Submittal constitutes grounds for denial of the Task Order.

All MBEs, WBEs, SBEs, and other subcontractors/suppliers that are intended to be used on the Task Order FOR ALL TIERS must be documented.

For Construction Contracts under $500,000, any MWSBE must satisfy the requirements of the CBI Manual in order to count its performance with its own current workforces towards the Contract Goal and must list itself below along with their projected utilization amount.

Contractor Name:

Contract Name:

Contract Number:

Task Order Number:

Established MBE Goal: Established WBE Goal: Established SBE Goal:

List below all MBEs, WBEs, and/or SBEs (Non-Hauling Services) that you intend to use on this Task Order. NOTE: You will only receive credit, as of the Task Order Submittal Date, for SBEs that are currently certified with the City or MBEs and WBEs that are registered with the City.

MBE/WBE/SBE

Vendor Name

(Non-Hauling Services) Description of work / materials NIGP Code Vendor #

Total Projected Utilization ($)

For all hauling services only, list below all MBEs, WBEs, and SBEs that you intend to provide such work and the Total Projected

Utilization ($).

MBE/WBE/SBE

Vendor Name

(Hauling Services) Description of work / materials NIGP Code Vendor #

Total Projected Utilization ($)

Total Subcontractor / Supplier Utilization (including MBEs, WBEs, SBEs, and Non-MWSBEs)

Total MBE Utilization $

Total WBE Utilization $

Total SBE Utilization $

Total Task Order Amount (including Contingency) $

Percent MBE Utilization* (Total MBE Utilization divided by Total Task Order Amount) %

Percent WBE Utilization* (Total WBE Utilization divided by Total Task Order Amount) %

Percent SBE Utilization* (Total SBE Utilization divided by Total Task Order Amount) %

* The Utilization percentage stated MUST be rounded to (2) decimal places.

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 9

CBI FORM 3: UTILIZATION COMMITMENT – TASK ORDER (page 2 of 2)

List below all non-MWSBE (subcontractors and suppliers) that you intend to use on this Task Order

Vendor Name Description of work / materials NIGP Commodity Code Vendor # Projected Utilization (if known) ($)

Letters of Intent submitted upon notice from the City Pursuant to the CBI Manual, within three (3) Business Days after receiving a request from the City (or within such longer time as may be communicated by the City in writing), Contractors must submit a separate Letter of Intent (CBI Form 4) for each MBE, WBE, and/or SBE listed on this CBI Form 3B. Each Letter of Intent must be executed by each MBE, WBE, and/or SBE and the Contractor. The City shall not count proposed MBE, WBE, and/or SBE utilization for which it has not received a Letter of Intent by this deadline. The Contractor is still obligated to pay the MBE, WBE, and/or SBE the full amount listed with the MBE, WBE, and/or SBE regardless of what percentage is actually counted towards the Contract Goal.

Adding subcontractors or suppliers after submitting this form Nothing in this certification shall be deemed to preclude you from entering into subcontracting arrangements after submission of this form. However, per the CBI Manual, you must comply with the following:

• You must maintain the level of MBE, WBE, and/or SBE participation proposed on this CBI Form 3B throughout the duration of the Task Order.

• If you need to terminate or replace a MBE, WBE, and/or SBE, you must comply with the CBI Manual requirements.

• If the scope of work on the Task Order increases, or if you elect to subcontract any portion of work not identified on this form as being subcontracted, then you must comply with the CBI Manual requirements.

• A Letter of Intent (CBI Form 4) must also be submitted for each MBE, WBE, and/or SBE you add subsequent to Task Order assignment.

All Subcontractors and Suppliers must be registered with the City of Charlotte.

Pursuant to the City’s Vendor Registration Policy, each subcontractor or supplier that you use on this contract must be registered in the City’s vendor database. You will need to provide the vendor number for each subcontractor or supplier used on this contract as a condition for receiving payment on this Contract.

Signature Your signature below indicates that the undersigned firm certifies and agrees that:

(a) It has complied with all provisions of the CBI Manual; and,

(b) Failure to properly document such compliance in the manner and within the time periods established by the CBI Manual shall constitute grounds for liquidated damages under the CBI Manual.

Signature of Authorized Official

Printed Name Title Submittal Date

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 10

COMMERCIAL NON-DISCRIMINATION CERTIFICATION

Project: FY27 ADA Corridors Phase 1 Unspecified Construction

Name of Company (Bidder):

The undersigned Bidder hereby certifies and agrees that the following information is correct:

1. In preparing its Bid, the Bidder has considered all bids submitted from qualified, potential subcontractors and suppliers, and has not engaged in or condoned discrimination, as defined in Section 2 below.

2. For purposes of this form, discrimination means discrimination in the solicitation, selection, or treatment of any subcontractor, vendor, supplier or commercial customer on the basis of a person's race, color, gender, religion, national origin, ethnicity, age, familial status, sex (including sexual orientation, gender identity and gender expression), veteran status, pregnancy, natural hairstyle or disability, or any otherwise unlawful form of discrimination. Without limiting the foregoing, discrimination also includes retaliating against any person or other entity for reporting any incident of discrimination.”

3. Without limiting any other remedies that the City may have for a false certification, it is understood and agreed that, if this certification is false, such false certification will constitute grounds for the City to reject the bid submitted with this certification and terminate any contract awarded based on such bid. It shall also constitute a violation of the City’s Commercial Non-Discrimination Ordinance and shall subject the Bidder to any remedies allowed thereunder, including possible disqualification from participating in City contracts or bid process for up to two years.

4. As a condition of contracting with the City, the Bidder agrees to promptly provide to the City all information and documentation that may be requested by the City from time to time regarding the solicitation and selection of subcontractors in connection with this solicitation process. Failure to maintain or failure to provide such information shall constitute grounds for the City to reject the bid submitted by the Bidder and terminate any contract awarded on such bid. It shall also constitute a violation of the City’s Commercial Non-Discrimination Ordinance and shall subject the Bidder to any remedies allowed thereunder.

5. As part of its bid, the Bidder shall provide to the City a list of all instances within the past ten years where a complaint was filed or pending against the Bidder in a legal or administrative proceeding alleging that the Bidder discriminated against its subcontractors, vendors or suppliers, and a description of the status or resolution of that complaint, including any remedial action taken.

6. As a condition of submitting a bid to the City, the Bidder agrees to comply with the City’s Commercial Non-

Discrimination Policy as described in Section 2, Article V of the Charlotte City Code, and consents to be bound by the award of any arbitration conducted thereunder.

By:

Signature of Company’s Authorized Representative

Title:

Date:

BID FORM AND SUPPLEMENTS Initials: _______ 00 40 00 - 11

EXECUTION OF BID

NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the Bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the Bidder has not been convicted of violating North Carolina General Statute 133-24 within the last three years, and that the Bidder intends to do the work with its own bona fide employees or subcontractors and is not bidding for the benefit of another contractor.

In addition, execution of this bid in the proper manner also constitutes the Bidder’s certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable.

NC General Statute 133-32 prohibits the offer to, or acceptance by, any City employee of any gift from anyone with a contract with the City or State, or from any person seeking to do business with the City of Charlotte. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

In the event the Bidder is awarded the Contract, execution of the Bid by the Bidder is considered the same as execution of the Contract. Affixing the corporate seal to this document is only intended to verify the officer signing on behalf of the corporation has the authority to do so.

The undersigned, having carefully examined the site and familiarized himself with the existing conditions on the Project area affecting the cost of work and hereby proposes to furnish all supervision, labor, equipment, materials and services required to construct and complete the Project in accordance with the Project Manual at and for the Total Amount Bid, excluding any Allowances, such as contingency, which may be used by the Contractor only upon written instructions from the Engineer in accordance with the terms of this Contract.

The undersigned agrees to comply with the self-performance requirement identified within Section 108-6 of the 2024 NCDOT Standard Specifications for Roads and Structures. 2024 Standard Specifications for Roads and Structures.pdf.

The undersigned acknowledges receipt of the following addenda (initial next to each addendum):

# 1: ______ # 2: _____ # 3: _____ # 4:_____ # 5: _____ #6: _____ # 7: _____ # 8: _____ # 9: _____

Type of Bidder: Sole Proprietor Partnership Corporation Limited Liability Company Joint Venture

(check 1 box) (if joint venture, complete this “Execution of Bid” sheet for each joint venture company and identify the “Name of Joint Venture” on each sheet)

NAME OF JOINT VENTURE: _________________________________________________________

Company Name:

Mailing Address:

City/State/Zip:

Phone: Email:

Printed Name: Title:

Signature: NC Gen. Contractor License #:

Subscribed and sworn to before me this day of 202___

Signature of Notary Public of County

State of

My Commission Expires:

https://connect.ncdot.gov/resources/Specifications/2024StandardSpecifications/2024%20Standard%20Specifications%20for%20Roads%20and%20Structures.pdf

ACCEPTANCE BY THE CITY 00 50 00 - 1

00 50 00 – ACCEPTANCE BY THE CITY

A CONTRACT FOR:

PROJECT NAME: FY27 ADA Corridors Phase 1 Unspecified Construction

BID NUMBER: 269-2027-001 CONTRACT NUMBER:

CONTRACT AMOUNT ($):

THIS CONTRACT (the “Contract”) is made and entered into and shall be by and between the CITY OF CHARLOTTE, a North Carolina Municipal corporation (the “City”), and ________________________________________________, a company doing business in North Carolina (the “Contractor”).

WHEREAS the City of Charlotte advertised an Invitation to Bid (ITB) for the Project on July 20, 2026, together with all attachments and addenda, WHEREAS the Contractor submitted to the City a Bid on ________________________ in response to the ITB, together with all attachments and separately sealed confidential trade secrets, herein referred to as the “Bid”, WHEREAS the execution of the Bid is the same as the execution of the Contract by the Contractor, WHEREAS the City of Charlotte Council, on ____________________________________, authorized the City to enter into this Contract with the Contractor for construction services for the Project, WHEREAS this Contract includes the following:

a. Project Manual, including all addenda issued prior to execution of the Contract;

b. Plans;

c. Contractor’s Bid;

d. Performance & Payment Bonds;

e. Acceptance by the City; and

f. Executed Change Orders issued after execution of the Contract.

WHEREAS the City and the Contractor now desire to fully execute this Contract for the Contractor to provide construction services for the Project in accordance with the terms and conditions set forth in the Contract, NOW, THEREFORE, the City of Charlotte, acting through its City Council, has caused this Contract to be executed in the name of the City of Charlotte by an authorized official.

CITY OF CHARLOTTE:

By:

Print Name:

CHARLOTTE BUSINESS INCLUSION (CBI) PROGRAM 00 55 00 - 1

00 55 00 – CHARLOTTE BUSINESS INCLUSION (CBI) PROGRAM

CBI Policy adopted July 1, 2023

The Charlotte Business INClusion (CBI) Program seeks to enhance competition and participation of Minority-owned, Women-owned, and Small Business Enterprises (MWSBEs) in City contracting.

To accomplish this, the City has increasingly examined its procurements and set specific MWSBE participation goals on a contract-by-contract basis.

In addition, CBI makes a concerted effort to expand its certified MWSBE vendor pool and assist city-certified firms in growing, enhancing, and developing their businesses. CBI currently offers numerous development programs that support certified businesses in organizational training, strategic development, and networking opportunities.

A complete list of City of Charlotte certified Small Business Enterprises (SBEs) and City of Charlotte registered Minority- Owned Business Enterprises (MBEs) and Women-Owned Business Enterprises (WBEs) (SBE, MBE, and WBE, collectively MWSBE) is available on the City’s InclusionCLT system: http://charlotte.diversitycompliance.com

PROJECT SUBCONTRACTING

GOAL:

SBE Goal: 10%

In order to count MWSBE firms toward to project goal, MWSBEs must be certified with the City of Charlotte at the time of bid. For more information around certification requirements, please review the CBI Manual.

1. APPLICATION:

The City’s Charlotte Business INClusion (CBI) Policy and CBI Manual are incorporated into and made a part of this solicitation and the resulting contract (the “Contract”). Copies of the CBI Policy and CBI Manual may be obtained by:

Internet: www.charlottebusinessinclusion.com

Mail: Charlotte Business INClusion Office 600 East Trade Street Charlotte, North Carolina 28202

Capitalized terms used in this document shall have the meanings set forth in the CBI Manual. Each reference to “you” or “your” in these provisions refers to any entity that submits a bid, proposal or statement of qualifications on a City contract, and any entity that enters into a contract with the City.

For this solicitation, the CBI Manual requires that you either (a) meet the established Contract Goal, as listed on the first page of this document; or (b) comply with the Good Faith Efforts and Good Faith Negotiation requirements referenced in Section 3 below. Failure to comply with the CBI Policy and CBI Manual in the bid phase constitutes grounds for rejection of your Bid.

Failure to comply after the contract award may result in the assessment of damages and/or termination of your contract.

http://charlotte.diversitycompliance.com/ http://www.charlottebusinessinclusion.com/

CHARLOTTE BUSINESS INCLUSION (CBI) PROGRAM 00 55 00 - 2

2. SUBCONTRACTING GOALS:

You must submit your proposed MWSBE utilization for this Contract on CBI Form 3 (Subcontractor/Supplier Utilization Commitment Form) listing all subcontractors and suppliers that will be providing goods or services.

MBE or WBE established Goals can only be met with the City of Charlotte registered MBEs and WBEs that have been certified as a Historically Underutilized Business by the State of North Carolina.

SBE established Goals for this project can only be met with City of Charlotte certified SBEs.

CBI Form 3 MUST be submitted at the time of bid opening. Failure to submit CBI Form 3 at the time of bid opening shall constitute grounds for rejecting the Bid. All bidders must submit their proposed goal commitment at the time of Bid.

If the Bidder does not meet the goal at the time of bid opening, they will have twenty-four (24) hours to submit a completed CBI Form 3 demonstrating that they have met or exceeded the goal. If the goal is not met then, the City will proceed with the Good Faith Efforts process.

Bidders must state the projected dollar amount for each MWSBE firm listed on their CBI Form 3 and indicate the total dollar value of participation for the contract. In the event the bidder has no MWSBE participation, the bidder is still required to indicate this on CBI Form 3 by entering the word or number zero. Blank forms will be deemed to represent zero participation.

The City will only give Bidders credit towards the established Subcontracting Goal that:

a. Is listed on CBI Form 3 submitted at bid or within twenty-four (24) hours of bid opening (if goal not met at bid opening); and

b. Is listed on CBI Form 3A (when applicable); and

c. Is documented by CBI Form 4 (CBI Letter of Intent) which is submitted to the City within three (3) Business Days after the City requests it; and

d. Meets all of the requirements of the CBI Manual.

NOTE: MWSBEs listed on CBI Form 3 must be actively certified/registered with the City of Charlotte as of bid date and must be performing a Commercially Useful Function as defined in the CBI Manual.

Bids submitted that do not have the above required MWSBE information indicated on CBI Form 3 constitutes grounds for the Bid to be considered non-responsive and rejected.

The established Contract Goal will represent the total dollars to be spent with MWSBEs as a portion of the total bid amount, which includes Contingency and excludes Allowances. The MWSBE percentage will be rounded to two decimal places. As an example, if the MBE percentage is 3.571, it should be listed as 3.57%, or if it is 3.578, it should be listed as 3.58%. The percentage will not be rounded to the next “whole” number, i.e., 4%. A Bidder may round up if the third number after the decimal is a five (5) or greater.

In the event Alternates are selected by the City, the established Contract Goal for this Contract will apply to the total contract amount, including Contingency, selected Alternates, and excluding Allowances (“Total Contract Amount”). If a low Bidder would meet the established Contract Goal on the base bid amount, but would not meet the established Subcontracting Goal for the Alternates selected by the City, the Bidder will have three (3) days after the City notifies it of its low bid status to secure enough additional participation to meet the established Contract Goal calculated on the Total Contract Amount. The low Bidder will be required to utilize CBI Form 3A to meet this requirement. This in no way exempts the bidder from the CBI requirements due at bid time.

If the Bidder fails to meet the established Contract Goal, calculated on the Total Contract Amount, then the Bidder must earn the Minimum Good Faith Effort (GFE) Points and meet the Good Faith Negotiation…