FY24-ENG-81 Spec Book.pdf

PDF 2 MB Posted

Attached to
Santa Fe Park Trail
Solicitation number
FY24-ENG-81
Issued by
Upton County, Texas

About this file

This is a specifications and bid document for the City of Laredo, Texas Engineering Department for Project FY24-ENG-81, the Santa Fe Park Trail construction project. The project consists of constructing approximately 3,372 linear feet of 10-foot-wide concrete trail, including rehabilitation and stabilization of an existing concrete channel, pedestrian railing installation, and associated subsidiary work. The bid schedule includes multiple line items covering site clearing and grubbing, cut and fill work, subgrade preparation, conduit installation, concrete trail construction, broadcast seeding and regrading, traffic control, fence removal and installation, pedestrian railing, concrete channel rehabilitation, inlet protection, silt fence installation, construction entrance stabilization, concrete wash pit, trash and debris container installation, and a $50,000 contingency allowance. Sealed bids are to be submitted to the City Secretary's Office at 1110 Houston Street, Laredo, Texas 78040. The contract time for the project is 120 working days. The City reserved the right to award the base bid or any alternate bids, with the Notice of Award expected within ninety (90) days from the bid opening date.

Bids are required on a per unit of work basis with dollar amounts for each specific item listed in the proposal sheets. A bid guarantee of five percent (5%) of the total bid amount is required in the form of a certified check, cashier's check, or bid bond. For contracts exceeding $50,000, performance bonds and payment bonds equal to 100% of the total contract price are required from a surety meeting minimum Best's Key Rating Guide standards. Contractors must provide a Certificate of Insurance with minimum combined single limits of $1,000,000 per occurrence for commercial general liability and $1,000,000 per occurrence for commercial automobile liability. All structural and reinforcement steel must comply with the Build America, Buy America Act (BABAA) requirements. The project is federally funded and contractors must comply with Federal Labor Standards Provision, Davis Bacon Act requirements, Equal Opportunity Clause provisions, and wage determination requirements. The contractor is required to submit weekly certified payrolls. Liquidated damages of $200 per day apply for late completion beyond the 120-working-day contract period. The contractor must provide three local telephone numbers for emergency contact and failure to respond to emergency situations will result in charges of twice the city's costs plus a $500 penalty per incident.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vanessa Perez

District VII

Alyssa Cigarroa

District VIII

Gilbert Gonzalez

Mayor Pro Tempore - District I

Ricardo Richie Rangel, Jr.

District II

Melissa R. Cigarroa

District III

Santa Fe Park Trail

COUNCIL MEMBERS

CITY OF LAREDO

ENGINEERING DEPARTMENT

PLANS AND SPECIFICATIONS FOR

FY24-ENG-81

Honorable Dr. Victor D. Treviño, Mayor

Ricardo "Rick" Garza

District IV

Eliud De Los Santos, P.E.

City Engineer

Joseph Neeb

City Manager

Ruben Gutierrez, Jr.

District V

Dr. David Tyler King

District VI

1110 Houston St.

Laredo, Texas, 78040

Division A

Division B

Ethics Commission Rules

Notice to Bidders

Section A-7

Section A-8

Section A-1

Section A-2

Section A-3

Section A-4

Section A-5

Information to Bidders

Advise to Bidders

Information to Contractors

FY24-ENG-81

Santa Fe Park Trail

TABLE OF CONTENTS

Section A-9

Contract Time & Liquidated Damages

Equal Opportunity Clause

Wage Determination

Inspection by City

Project Sign

Illegal Dumping

Checklist for Bidders

Performance Bond/Payment Bond

Contractors/Subcontractors Certificate of Insurance

Notice of Award

Notice to Proceed

Certificate of Owner’s Attorney

Section A-6

Section A-10

Section A-11

Section A-12

Construction Contract

Section C-2

Section C-3

Section C-4

Section B-1

Section B-2

Section B-3

Section B-4

Section B-5

Section B-6

Proposal, Affidavit, Bid Schedule, Information from Bidders, and Bid Bond https://www.cityoflaredo.com/home/showpublisheddocument/308/638092210923830000

Prosecution and Progress

Measurement and Payment

Warranty Statement Form

Section C-11

Section C-8

Section C-9

Section C-10

Division D - Technical Provisions

Refer to the following link:

Definition of Terms

Definition of Abbreviations

Instruction to Bidders

Award and Execution of Contract

Scope of Work

Control of Work and Materials

Legal Relations and Responsibilities to the Public

Section C-5

Section C-6

Section C-7

Division C

Section C-1

1110 Houston St.

Laredo, Texas, 78040

Bids shall be based on a per unit of work basis and shall include dollar amounts for each specific unit in improvements listed including those items listed as alternatives as per the proposal sheet included in the specifications of this project.

Construction contract time for the project is

SECTION A-2

INFORMATION TO BIDDERS

Sealed bids will be received at City Secretary’s Office, 1110 Houston Street, 3 rd floor, City Hall Building, Laredo, Texas, for the furnishing of all necessary materials, machinery, equipment, labor, superintendence, and all other services and appurtenances required for certain improvements in the City of Laredo and shall include acknowledgment of addenda submitted, and all other documents included in said bid call. Said bids shall be marked, FY24-ENG-81

Santa Fe Park Trail

Working days

This project consists of constructing approximately 3372 LF of 10' wide concrete trail, including rehabilitation/stabilization of existing concrete channel, pedstrain railing, and subsidiary work.

Further, on federally funded projects, contractor must comply with the Federal Labor Standards

Provision, Davis Bacon Act, Equal Opportunity Clause, Wage Determination and HUD and Urban

Development Federal Requirements especially as it regards payrolls and basic records. All structural and reinforcement steel shall follow the Build America, Buy America Act (BABAA).

Each proposal and a proposal guaranty must be originals and must be sealed in an envelope plainly marked with the name of the project as shown above, and the name and address of the Bidder. For Bidders electing to submit

Bids and Bid Guaranties electronically via Cit-E-Bid, Bid Guaranties will be verified by the Owner prior to bid certification and electronic copies of Bid Guaranties will not be returned to Bidders. Mailed bids (i.e. USPS, FedEx, UPS), telegraphic, or facsimile submittals will not be allowed/considered. Only the bids and bid guaranties actually in the hands of the designated official at the time set in this Notice to Bidders shall be considered.

The City reserves the right to award the contract on the basis of the alternative which appears most advantageous to the City, to reject any or all bids, to waive objections based on failure to comply with formalities, and to allow the correction of obvious or patent errors. Bidders are expressly advised to review Section C-3 of the

General Conditions of the proposed contract as to the causes which may lead to the disqualification of a bidder and/or the rejection of a bid proposal. Unless all bids are rejected, Owner agrees to give Notice of Award of contract to the successful bidder within ninety (90) days from the date of the bid opening.

Page 1 of 3Information to Bidders

In the event the base bid amount is $50,000.00 or LESS than $50,000.00, a Payment Bond and

Performance Bond will NOT BE REQUIRED. A Bid Guarantee in the form of a Cashier’s or Certified Check or Bid Bond and the Certificate of Insurance however, WILL BE REQUIRED. Under the above conditions, the successful bidder for the project is hereby advised that the total contract price will be paid in ONE

PAYMENT upon completion and acceptance of the project by the City of Laredo. Cashier’s checks are not to be released until a contract for the project has been approved by City Council and signed by the

City Manager.

Over 1,000,000

Bidders are expected to inspect the site of the work and to inform themselves regarding all local conditions.

The Instructions to Bidders, Forms of Bid, Form of Contract, Plans, Specifications, Form of Bid Bond, Performance and Payment Bonds and other contractual documents may be examined free of charge at the City of Laredo Engineering Department, 1110 Houston Street, Laredo, Texas 78040.

Copies of the plans and specifications may be reviewed free of charge at the City Engineer's office, 1110 Houston

Street, Laredo, Texas, or on the Cit-E-Bid web page under the Attachments Section.

https://cityoflaredo.ionwave.net/

A

All lump sum and unit prices must be stated in both script and figures.

Information to Bidders Page 2 of 3

Bid proposals over $50,000.00 shall comply with all conditions of the bid documents.

Any other division or section of this project’s specifications having reference to Bid Guarantee, Cashier’s or

Certified Check, Bid Bond, Payment Bond, or Performance Bond, or having mention at all, to the requirements of bonds, is hereby amended to concur with the above conditions ONLY when the base bid is LESS THAN

$50,000.00.

Bidders for the construction work must submit a satisfactory cashier’s or certified check, or bidder’s bond having a minimum Best’s Rating A according to Best’s Key Rating Guide Latest Edition from a surety duly authorized and licensed in the State of Texas, payable without recourse to the order of the City of Laredo, Texas, in an amount not less than five percent (5%) of the total bid based on the bid which check or bond shall be submitted as a guarantee that the bidder will enter into a contract, and execute performance and payment bonds within ten (10) days after Notice of Award of contract is given to him for contracts in excess of $50,000.00. Bids without the required check or bond will NOT be considered.

The successful bidder for the construction of the improvements must furnish a Certificate of Insurance, and a satisfactory Performance Bond in the amount of 100% of the total contract price, and a satisfactory Payment

Bond in such amount, duly executed by such bidder as principal and by a corporate surety duly authorized so to act under the laws of the State of Texas. The successful bidder will be required to provide Performance and

Payment Bonds issued by an insurance company which meets the minimum State requirements and is licensed in the State of Texas, and has a Best’s Key according to Best’s Key Rating Guide Latest Edition as follows:

A

A

Minimum Best’s RatingConstruction Contract

50,001 - 250,000

250,000 - 1,000,000

Information to Bidders Page 3 of 3

Contractor’s attention is directed to Special Provision 000-6233, “Important Notice to Contractors” and “Statement of Materials and Other Charges” which will be included in all projects, beginning with the September 1991 letting.

These establish the procedures whereby the Contractor will be permitted to obtain an exemption from the sales tax on certain materials. See Comptroller’s Rule 2.291 and Texas Tax Code Chapter 151, as mended by House

Bill Number 11, Acts 1991, 72nd Legislature, First called Session. The Contractor will be required to separate the charges for materials from all other charges and will be furnished an Exemption Certificate of reach contract the

Department. Also, the Contractor must issue resale certificates to suppliers. Sales tax permit applications and information regarding resale certificates may also be obtained by calling the State Comptroller’s toll free number 1-

800-252-5555.

Bidders are advised to contact the City Engineering Department at 1110 Houston Street, Laredo, Texas, 78040, telephone number (956) 791-7346, for visits to project site, and for any additional information required on the project.

Page 1 of 1Advise to Bidders

The Contractor’s attention is directed to the State of Texas Comptroller of Public Accounts Limited Sales Excise and Use Tax Rules and Regulations, Paragraph 3 of Ruling No. 9. Repairmen and Contractors (amended April

3, 1972). Reference Article 20.01 (T). Upon compliance with certain conditions, this ruling provides for exemption from this tax of materials incorporated into work done for an exempt agency under a Contract. The

City is an exempt agency.

Any Bidder may elect to exclude this sales tax from his bid. If the Bidder submitting the lowest acceptable bid for performing the work on this project elects to comply with the above ruling on any bid item included in this Contact by obtaining any necessary permit or permits from the State Comptroller allowing the purchase of material for incorporation into this project without having to pay the Limited Sales, Excise and Use Tax at the time of purchase, he shall upon Award of Contract submit a statement in satisfactory form in which his bid prices to the

City for materials are listed separately from all other charges, either by bid item or by total as required by the comptroller. This statement shall be included in and made part of the Contract.

The City will make no further allowance for and will make no price adjustment above or below the originally bid unit price on account of this tax. It shall be the Contractor’s sole responsibility, if he elects to exclude the sales tax from his bid, to comply with the aforementioned Ruling No. 9 and with any other applicable rules, regulation, or laws pertaining to the Texas Limited Sales, Excise and Use Tax which may now or at any time during the performance of this Contract be in effect, and the City shall have no responsibility for any sales or use tax which the Contractor may be required to pass as a result of his failure or the City’s failure to comply with said rules, regulations or laws, or as the result of the performance of the Contract or any part thereof by the Contractor.

Bidders are cautioned that materials which are not permanently incorporated into the work are not eligible for exemption and are not to be included in the statements as “Materials” (example: fuel, lubricants, tools, forming materials, etc.).

SECTION A-3

ADVISE TO BIDDERS

Project:

Santa Fe Park Trail

The Contractor’s attention is directed to Special Provision 000-6233, “Important Notice to Contractors”, and

“Statement of Materials and Other Charges” which will be included in all projects, beginning with the September, 1991 letting. These establish the procedures whereby the Contractor will be permitted to obtain an exemption from the sales tax on certain materials. See Comptroller’s Rule 3.291 and Texas Tax Code, Chapter 151, as amended by House Bill Number 11, acts 1991, 72nd Legislature, First Called Session. The Contractor will be required to separate the charges for materials from all other charges and will be furnished an Exemption

Certificate for each contract by the Department. Also, the Contractor must issue resale certificates to suppliers.

Sales tax permit applications and information regarding resale certificates may be obtained by calling the State

Comptrollers’ toll fee number 1-800-252-5555.

SECTION A-4

INFORMATION TO CONTRACTORS

PROJECT:

FY24-ENG-81

Santa Fe Park Trail

Issued 10/29/91

Information to Contractors

It will also be necessary that the contractor issue resale certificates to his suppliers.

Austin, Texas 78774

The Contractor may also receive information or request sales tax permit applications by calling the State

Comptrollers’ toll-free number 1-800-252-5555.

Subcontractors are eligible for sales tax exemption if the subcontract is made in such manner that the charges for materials is separated from all other charges. The procedure described above will affect a satisfactory separation. When subcontractors are handled in this manner, the Contractor must issue a resale certificate to the subcontractor and the subcontractor, in turn, must issue a resale certificate to his supplier.

Sales tax application for a sales tax permit and information regarding resale certificates may be obtained by writing to:

Comptroller of Public Accounts

Capital Station

Page 2 of 3Information to Contractors

In order to comply with the requirements of Rule 3.291, as mentioned above, it will be necessary for the

Contractor to obtain a sales tax permit.

The Contractor’s attention is directed to Rule 3.291, paragraphs (a) (1), defining separated contracts, subsection

(b) (3) discussing separated contracts, and subsection (c) discussing exempt contracts. Reference: Texas Tax

Code, Chapter 151.

Contractors should note those organizations in subsection (c) that the rule shows as being exempt no longer qualify for the exemption. The rule states that contractors improving realty for organizations listed in Texas Tax

Code 151.309 and 151.310 are exempt from tax. THIS IS NO LONGER TRUE EFFECTIVE WITH

CONTRACTS SIGNED ON OR AFTER AUGUST 15, 1991.

Only those contracts with school districts and nonprofit hospitals qualify for the exemption discussed in subsection (c) of Rule

3.291.

If the low bidder elects to operate under a separated contract as defined by Rule 3.291, by obtaining the necessary permits from the State Comptroller’s office allowing the purchase of materials for incorporation in this project without having to pay the Limited Sales and Use Tax at the time of purchase, the low bidder shall identify separately from all other charges the total agreed contract price for materials incorporated into the project. This form shall be filled out by the low bidder in each of the two bound copies of the contract. Total materials shall only include materials physically incorporated into the realty.

If the Contractor operates under a “separated contract”, the Department will furnish the Contractor with an exemption certificate for the applicable materials.

The Comptroller is amending the rule to reflect this change.

SPECIAL PROVISION

No. 000-6233

IMPORTANT NOTICE TO CONTRACTORS

STATEMENT OF MATERIALS AND OTHER CHARGES

MATERIALS INCORPORATED INTO THE PROJECT: $___________

FY24-ENG-81

Santa Fe Park Trail

PROJECT:

Information to Contractors Page 3 of 3

ALL OTHER CHARGES: $___________

*TOTAL: $___________

*This total must agree with the total figure shown in the Item and Quantity Sheets in the bound contract.

For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor.

NOTE: ONLY THE COPY OF THIS FORM IN THE BOUND CONTRACTS IS TO BE FILLED OUT.

PROPOSAL

Required Submission of one original of the bid package

CITY OF LAREDO

FY24-ENG-81

sheets from Section A-5

Initial & date acknowledgement of:

Addenda if any, Wage

Determination, Labor Provisions, and

Affirmative Actions Programs

COVER PAGE FOR BID

Santa Fe Park Trail

A-5

Proposal Page 1 of 12

To: The City of Laredo, Texas

Address: ________________________

Phone: ________________________

Labor Provisions:_________________________________________________________________

Affirmative Action Program:________________________________________________________

SECTION A-5

BID PROPOSAL

Honorable Dr. Victor D. Treviño, Mayor

From: _________________________________

Contractor

Addendum No. 8: _____________________________________________________________________

Acknowledgment of Addenda: (Please initial and date):

Addendum No. 2: _____________________________________________________________________

Addendum No. 3: _____________________________________________________________________

Addendum No. 4: _____________________________________________________________________

Addendum No. 5:

Addendum No. 6:

Addendum No. 7:

Santa Fe Park Trail

Pursuant to Notice to Bidders, the undersigned bidder hereby proposes to furnish the labor, materials, and equipment in accordance with the plans and specifications, general conditions of the agreement, special provisions of the Agreement, and Addenda, if any. The bidder binds himself upon acceptance of his proposal to execute a contract and bonds accompanying form of performing and completing the said work within the time stated as required by the detailed specifications at the following unit prices. The quantities shown below are based on the Engineer’s estimate of quantities and it is agreed that the quantities may be increased or diminished, and may be considered necessary in the opinion of the City of Laredo, Texas to complete the work fully as planned and contemplated, and that all quantities of work, either increased or decreased, are to be performed at the unit prices set forth below (except as provided in the General Conditions of the Agreement or the specifications, the contract documents).

Acknowledgment of Addenda: (Please initial and date):

Addendum No. 1: _____________________________________________________________________

Project:

FY24-ENG-81

Wage Determination:______________________________________________________________

Proposal Page 2 of 12

Notary Public

My Commission expires

COUNTY OF WEBB {}

Project:

FY24-ENG-81

Santa Fe Park Trail being first duly sworn, deposes and says

That he is

Form of Non-Collusive Affidavit:

Bidder, if the Bidder is an individual

Partner, if the Bidder is a Partnership

Officer, if the Bidder is a Corporation

Subscribed and sworn before me this _____ day of _________, 20___.

A F F I D A V I T

(a Partner of Officer of the firm of, etc.)

the party making the foregoing proposal or bid, that such proposal or bid is genuine and not collusive or sham;

that said Bidder has not colluded, conspired, connived or agreed, directly or indirectly, with any Bidder or

Person, to put in a sham bid or to refrain from bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference, with any person, to fix the bid price or affiant or of any other Bidder or to fix any overhead, profit or cost element of said bid price, or of that of any other Bidder, or to secure any advantage against the City of Laredo or any person interested in the proposed Contract; and that all statements in said proposal or bid are true.

Signature of (Print and Sign)

STATE OF TEXAS {}

Proposal Page 3 of 12

INFORMATON TO CONTRACTORS

PROJECT:

FY24-ENG-81

Santa Fe Park Trail

The Contractor’s attention is directed to Special Provision 000-6233, “Important Notice to Contractors”, and

“Statement of Materials and Other Charges” which will be included in all projects, beginning with the September, 1991 letting. These establish the procedures whereby the Contractor will be permitted to obtain an exemption from the sales tax on certain materials. See Comptroller’s Rule 3.291 and Texas Tax Code, Chapter 151, as amended by House Bill Number 11, acts 1991, 72nd Legislature, First Called Session. The Contractor will be required to separate the charges for materials from all other charges. Also, the Contractor must issue resale certificates to suppliers. Sales tax permit applications and information regarding resale certificates may be obtained by calling the State Comptrollers’ toll fee number 1-800-252-5555.

Proposal Page 4 of 12

No. 000-6233

IMPORTANT NOTICE TO CONTRACTORS

The Comptroller is amending the rule to reflect this change.

The Contractor’s attention is directed to Rule 3.291, paragraphs (a) (1), defining separated contracts, subsection (b) (3) discussing separated contracts, and subsection (c) discussing exempt contracts. Reference:

Texas Tax Code, Chapter 151.

Contractors should note those organizations in subsection (c) that the rule shows as being exempt no longer qualify for the exemption. The rule states that contractors improving realty for organizations listed in Texas Tax

Code 151.309 and 151.310 are exempt from tax. THIS IS NO LONGER TRUE EFFECTIVE WITH

CONTRACTS SIGNED ON OR AFTER AUGUST 15, 1991.

It will also be necessary that the contractor issue resale certificates to his suppliers.

Comptroller of Public Accounts

Capital Station

Austin, Texas 78774

SPECIAL PROVISION

Only those contracts with school districts and nonprofit hospitals qualify for the exemption discussed in subsection (c) of Rule 3.291.

The Contractor may also receive information or request sales tax permit applications by calling the State

Comptrollers’ toll-free number 1-800-252-5555.

Subcontractors are eligible for sales tax exemption if the subcontract is made in such manner that the charges for materials is separated from all other charges. The procedure described above will affect a satisfactory separation. When subcontractors are handled in this manner, the Contractor must issue a resale certificate to the subcontractor and the subcontractor, in turn, must issue a resale certificate to his supplier.

If the low bidder elects to operate under a separated contract as defined by Rule 3.291, by obtaining the necessary permits from the State Comptroller’s office allowing the purchase of materials for incorporation in this project without having to pay the Limited Sales and Use Tax at the time of purchase, the low bidder shall identify separately from all other charges the total agreed contract price for materials incorporated into the project. This form shall be filled out by the low bidder in each of the two bound copies of the contract. Total materials shall only include materials physically incorporated into the realty.

In order to comply with the requirements of Rule 3.291, as mentioned above, it will be necessary for the

Contractor to obtain a sales tax permit.

Sales tax application for a sales tax permit and information regarding resale certificates may be obtained by writing to:

Proposal Page 5 of 12

NOTE:

For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor.

*TOTAL:

ALL OTHER CHARGES:

ONLY THE COPY OF THIS FORM IN THE BOUND CONTRACTS IS TO BE FILLED OUT.

STATEMENT OF MATERIALS AND OTHER CHARGES

MATERIALS INCORPORATED INTO THE PROJECT:

PROJECT:

FY24-ENG-81

Santa Fe Park Trail

*This total must agree with the total figure shown in the Item and Quantity Sheets in the bound contract

Proposal Page 6 of 12

1.00

2.00

3.00

NOTE: TO BE SUBMITTED UPON REQUEST

Date Completed:

Name of Project:

Value of Contract:

Date Completed:

Name of Project:

Financial Status:

Value of Contract:

Date Completed:

Experience Data:

Name of Project:

A confidential financial statement will be submitted by the apparent successful low Bidder only if the Owner deems it necessary

Santa Fe Park Trail

Value of Contract:

(Include name and experience record of the Superintendent)

Project:

INFORMATION FROM BIDDERS

MUST BE COMPLETED AND SUBMITTED WITH BID PROPOSAL

FY24-ENG-81

Statement of Qualifications: (Similar Projects Completed by Bidder)

IS NOT AN ACCEPTABLE ANSWER.

Proposal Page 7 of 12

NOTE:

Subcontractors: (Submit a list of proposed Subcontractors. List sources, types and manufacturers of proposed materials)

Proposed Progress Schedules:

FY24-ENG-81

Santa Fe Park Trail

Project:

TO BE SUBMITTED UPON REQUEST

IS NOT AN ACCEPTABLE ANSWER.

Data on Equipment to be used on the Work: (Include the number of machines, the type, capacity, age and conditions and location)

Proposal Page 8 of 12

Quantity Unit

1.00

1.1

1 LS

1.2

1 LS

1.3

140 CY

1.4

120 LF

1.5

625 SY

1.6

33720 SF

1.7

1 LS

1.8

1 LS

1.9

1 LS

Total Price Base Bid

Furnish all labor, equipment, and material to construct a 4" Reinforced Concrete Trail as per city specifications, to include all labor materials, tools, equipment, etc. Complete in place.

Furnish all labor, equipment, and material to construct a Broadcast Seeding & Regrade as per city specifications, to include all labor materials, tools, equipment, etc. Complete in place.

Furnish all labor, equipment, and material to provide

Traffic Control as per city specifications, to include all labor materials, tools, equipment, etc. Complete in place

Remove Existing Chainlink Fence as per city specifications, to include all labor, and any (if needed) removal of existing concrete, material, doweling, tools, equipment, etc. Complete in place.

Base Bid

Furnish all labor, equipment, and material for 6"

Subgrade Preparation and compaction as per city specifications, to include all labor materials, tools, pavement, etc. Complete in place

Furnish all labor, equipment, and material for Grade

40 Conduits as per city specifications, to include all labor materials, tools, pavement, etc. Complete in place

Furnish all labor, equipment, and material for Cut/Fill

(Net Cut) & Regrade and Haul Off as per city specifications, to include all labor materials, tools, pavement, etc. Complete in place

Furnish all labor, equipment, and material to Excavate, Clearing and Grubbing, and Haul Off as per city specifications, to include all labor materials, tools, pavement, etc. Complete in place

Mobilization and Bonding of all labor, equipment, tools, and material for the construction of a 10' Concrete

Trail as per city specifications, to include all labor materials, mobilization, tools, equipment, traffic control, material testing, etc. Complete in place.

FY24-ENG-81

Santa Fe Park Trail

CITY OF LAREDO

ENGINEERING DEPARTMENT

BID SCHEDULE

Proposal Page 9 of 12

1.10

1 LS

1.11

50 LF

1.12

1 LS

1.13

1 LS

2.00

2.1

3972 LF

2.2

1 EA

2.3

1 EA

2.4

1 EA

2.5

1 EA

Total

Furnish all labor, equipment, and material to install a

Concrete Wash Pit as per city specifications, to include all labor materials, tools, equipment, etc.

Complete in place.

Furnish all labor, equipment, and material to install a

Trash & Debris Container as per city specifications, to include all labor materials, tools, equipment, etc.

Complete in place.

Furnish all labor, equipment, and material to install

Inlet Protection as per city specifications, to include all labor materials, tools, equipment, etc. Complete in place.

Chainlink Fence Placement as per city specifications, to include all labor, and any (if needed) removal of existing concrete, material, doweling, tools, equipment, etc. Complete in place.

Furnish all labor, equipment, and material to construct

Pedestrian Railing as per city specifications, to include all labor materials, tools, equipment, etc.

Complete in place.

SW3P

Contingency Allowance of $50,000.00 $50,000.00

Furnish all labor, equipment, and material to install a

Silt Fence as per city specifications, to include all labor materials, tools, equipment, etc. Complete in place.

Furnish all labor, equipment, and material to stabilized a Construction Entrance as per city specifications, to include all labor materials, tools, equipment, etc.

Complete in place.

Furnish all labor, equipment, and material for a

Concrete Channel Rehabilitation as per city specifications, to include all labor materials, tools, equipment, etc. Complete in place.

Total

Proposal Page 10 of 12

Total Additive Alternates Written in Words

Contractor

Signature Title

Address ZIP

Telephone Number: ( )

Date:

City/State

Proposal Page 11 of 12

General notes:

3. The successful bidder/contractor shall coordinate at all times during construction with the City of

Laredo Engineering Department and Parks & Recreation Department.

NOTE 2: THE CITY OF LAREDO RESERVES THE RIGHT TO AWARD THE BASE BID OR ANY OF THE

ALTNERATE BIDS LISTED ABOVE TO REJECT ALL BIDS IF FUNDINGS IS NOT AVAILABLE.

1. All bid items will be paid for when complete, in place, tested and accepted by the City of Laredo.

2. The City of Laredo reserves the right to award the base bid or any of the alternate bids listed above or reject all bids if funding is not available.

NOTE 1: ALL BID ITEMS WILL BE PAID FOR WHEN COMPLETE IN PLACE, TESTED, AND ACCEPTED BY

THE OWNER

Proposal Page 12 of 12

[ ] Have you acknowledged receipt of all addenda to the plans and specifications?

[ ] Is your bid properly signed? (Refer to Bid Documents)

[ ] Is your bid guarantee in the proper amount? (Usually 5% of total bid price)

[ ] If required have you entered a unit price for each bid item?

[ ] Are decimals in unit prices in the proper places? Are your figures legible?

[ ] Are the extensions of your unit prices, and your total bid price correct?

[ ] Is proposal being submitted complete together with Information from Bidders?

If required have you entered the unit price or lump sum price in both words and figures? (Unit Price or

Lump Sum price in words govern)

Project:

FY24-ENG-81

Santa Fe Park Trail

SECTION A-6

CHECKLIST FOR BIDDERS

All information required by the terms of the Bid Documents must be furnished. MISTAKES OR OMISSIONS CAN

BE COSTLY AND CAN RESULT IN THE REJECTION OF YOUR BID. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a proper bid. Check as you read. DO NOT INCLUDE THIS CHECKLIST WITH YOUR BID.

If a bid guarantee is required, is it included in your bid? (A late bid guarantee is treated the same as a late bid)

Your bid guarantee must be in the form of a Bidder’s Bond, a Certified Check or Cashier’s Check.

If your bid guarantee is in the form of a Bidder’s Bond, is the bond properly signed by both the bidder and surety and are all required seals affixed?

Is the surety company qualified and licensed by the State of Texas as required by the provisions of the bid documents?

Is the name in which you submitted the bid the same on your bid proposal as on the Bidder’s Bond?

Page 1 of 2Checklist to Bidders

Checklist to Bidders Page 2 of 2

On Federally Funded Projects, all structural and reinforcement steel shall follow the Build

America, Buy America Act (BABAA).

On Federally Funded Projects, contractor must submit certified weekly payrolls with a copy to

City Engineering Files.

Are all erasures or corrections initialized by the person signing the bid or by an authorized representative of the person signing the bid.

Do not restrict your bid by altering any provisions of the Bid Document or by attaching any documents to the Proposal that takes exception to the Bid Documents.

Have you included all pages of the Proposal with your bid? Are all blanks in the Proposal properly completed (equipment brands, alternate materials, etc.)?

Is the envelope containing your bid properly identified that it is a sealed bid and does it contain the correct project name and bid opening date?

Will your bid arrive on time? Late bids will not be considered. Generally, bids must be received by the

City Secretary, City Hall on the date and time specified in the Notice to Bidders. (Other times or dates will be clearly specified in the Notice).

STATE OF TEXAS

COUNTY OF WEBB

CITY OF LAREDO

Owner and, Project:

120 Working days

The Contractor further agrees to pay the sum of

$200.00 for each consecutive day there-in-after as herein provided in Division B, Section 1.

SECTION A-7

WHEREAS, the Owner desired to enter into Contract for the FY24-ENG-81 in accordance with the provisions of the Invitation for Bids, the Specifications and Plans titled as above, and published by City of Laredo, Texas, 1110 Houston Street, (mailing address: P.O. Box 579), Laredo, Texas

78040 all of which are a part thereof; and, Said Contractor further agrees to begin the work on or before the tenth day following the date set by the

Owner in the written notice to proceed and to complete the work within

C, Section 9, General Provisions of the contractual Documents to commence and complete the

FY24-ENG-81

his/their executors, their successors, or assigns, hereinafter termed the Contractor.

Santa Fe Park Trail in the City of Laredo, TX, in accordance with Instructions to Bidders, Special Provisions, General Provisions, Technical Provisions, and all other requirements of the contractual Documents, and in accordance with the

Specifications and Plans (including all maps, plats, blueprints, and other drawings and printed or written explanatory matter thereof) prepared by the Owner's Engineer, a part thereof and collectively, together with this

Agreement constitute the entire Contract; and the Contractor agrees to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, bonds, insurance and other accessories and services, and whatever else may be necessary to complete the said construction in accordance with said specifications, plans, and other contractual documents including such proposal.

FY24-ENG-81 Santa Fe Park Trail

WITNESS:

THAT for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, the Contractor hereby agrees at the unit price set forth in his Bid, made a part

$0.00 based on the Engineer's estimate of quantities, payable in the manner set out in Division

CONSTRUCTION CONTRACT

August 3, 2026

THIS AGREEMENT, made this ____ day of ________________ 2025, by and between the City of Laredo, Texas, acting by and through its duly authorized City Manager hereinafter termed the

Construction Contract Page 1 of 2

Santa Fe Park Trail

WHEREAS, the Contractor has been engaged in and now does such work and represents that he is fully equipped, competent and capable to perform the above desired and outlined work, and is ready and willing to perform the work in accordance with the provisions of the Invitation for Bids, the Specifications and Plans, titled:

FY24-ENG-81 Santa Fe Park Trail

And the Owner in consideration of the full and true performance of the said work by said Contractor hereby agrees to and binds itself to pay the said Contractor the unit price set forth in the attached Bid, and in the manner provided in the Specifications.

thereof totaling the sum of, WITNESS Contractor/Firm (Signature)

Signature Signature

Print Name Print Name

Title

Address

Address

City/State/Zip Code

Telephone Number

E-mail address

ATTEST: CITY OF LAREDO, TEXAS

Mario I. Maldonado, Jr., Joseph Neeb

City Secretary City Manager

APPROVED AS TO FORM:

Project Number:

Account:

City Attorney

Construction Contract Page 2 of 2

IN WITNESS WHEREOF, the OWNER AND THE CONTRACTOR have hereunto set their hand this day of_______ day of __________________, 2025.

Doanh “Zone” T. Nguyen 0

THE STATE OF {}

COUNTY OF {}

a (2) of hereafter called Principal and (3) of

, hereinafter called the Surety, are held and firmly bound unto (4) of hereinafter called Owner, in the penal sum of

Dollars in lawful money of the United Stated, to be paid in (5)

WEBB COUNTY, TEXAS

for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain

Contract with (6) the Owner, dated the day of a copy of which is hereto attached and made a part hereof for the Construction of:

(hereinafter called the “Work”)

These notes refer to the numbers in body of Contract above:

Date of Bond must not be prior to Date of Contract.

(1) Correct name of Contractor.

(2) A Corporation, or Partnership or an Individual, as case may be.

(3) Correct name of Surety.

(4) Correct name of Owner.

(5) County and State.

(6) Owner.

SECTION A-8

PERFORMANCE BOND

(As required by Chapter 2253, Texas Government Code)

KNOW ALL MEN BY THESE PRESENTS: That we (1)

NOW THEREFORE, if the Principals shall well, truly and faithfully perform the work in accordance with the Plans, Specifications and Contract Documents during the original term thereof, and any extensions thereof which may be granted by the Owner with or without notice to the Surety, and if he shall satisfy all claims and demands incurred under such Contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the owner all outlay and expense which the

Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect.

Performance and Payment Bonds Page 1 of 6

ATTEST:

By:

(SEAL)

Witness as to Principal (Print and Sign)

ATTEST:

SURETY: (Surety)

Secretary (Print and Sign)

By:

(SEAL) (Print and Sign)

(Surety) Secretary Address (State and Zip Code)

Telephone No. (Area Code)

(SEAL)

Witness as to Surety (Print and Sign)

Address (State and Zip Code)

PROVIDED FURTHER, that if any legal action be filed upon this Bond, venue shall lie WEBB County, State of

Texas, and that the said surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or the Specifications accompanying the same shall in any wise affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the work or to the

Specifications.

IN WITNESS WHEREOF, this Instrument is executed in six counterparts, each one of which shall be deemed an original, this the

PRINCIPAL (Print and Sign)

(Print and Sign)

(Principal) Secretary

Address (State and Zip Code)

Telephone Number

Address (State and Zip Code)

Performance and Payment Bonds Page 2 of 6

THE STATE OF {}

COUNTY OF {}

KNOW ALL MEN BY THESE PRESENTS: That we (1)

(2) of hereinafter called Principal and (3) of , State of

, hereinafter called the Surety, are held and firmly bound unto (4) of hereinafter called Owner, and unto all Persons, Firms, and Corporations who may furnish materials for, or perform labor upon the building or improvements hereinafter referred to in the penal sum of ($ ) Dollars in lawful money of the United Stated, to be paid in (5) WEBB COUNTY, TEXAS for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

the Owner, dated the day of a copy of which is hereto attached and made a part hereof for the construction of:

(hereinafter called the “Work”)

These footnotes refer to the numbers in body of contract above:

Date of Bond must not be prior to Date of Contract.

(1) Correct name of Contractor.

(2) A Corporation, or Partnership or an Individual, as case may be.

(3) Correct name of Surety.

(4) Correct name of Owner.

(5) County and State.

(6) Owner.

(As required by Chapter 2253, Texas Government Code)

THE CONDITIONS OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain Contract with

(6)

This Bond is made and entered into solely for the protection of all claimants supplying labor and material in the prosecution of the work provided for in said Contract, and all such claimants shall have a direct right of action under the Bond as provided in Section 2253.073, Texas Government Code.

NOW THEREFORE, if the Principals shall well, truly and faithfully perform the work in accordance with the Plans, Specifications and Contract Documents during the original term thereof, and any extensions thereof which may be granted by the Owner with or without notice to the Surety, and if he shall satisfy all claims and demands incurred under such Contract, then this obligation shall be null and void; otherwise to remain in full force and effect.

PAYMENT BOND

Performance and Payment Bonds Page 3 of 6

ATTEST:

(SEAL)

Witness as to Principal (Print and Sign)

ATTEST:

SURETY: (Surety)

Secretary (Print and Sign)

By:

(SEAL) (Print and Sign)

(Surety) Secretary Address (State and Zip Code)

Telephone No. (Area Code)

(SEAL)

Witness as to Surety (Print and Sign)

Address (State and Zip Code)

Telephone Number

PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

PROVIDED FURTHER, that if any legal action be filed upon this Bond, venue shall lie WEBB County, State of

Texas, and that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or the Specifications accompanying the same shall in any wise affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the work or to the Specifications.

IN WITNESS WHEREOF, this instrument is executed in six counterparts, each one of which shall be deemed an original, this the ______ day of ___________________.

(Principal) Secretary PRINCIPAL (Print and Sign)

(Print and Sign)

Address (State and Zip Code)

Address (State and Zip Code)

NOTE: If Contractor is Partnership, all Partners should execute Bond.

Performance and Payment Bonds Page 4 of 6

PERFORMANCE - PAYMENT BOND FORM

M-24, 25, Attach. Sa

(SEAL)

Business (Print) Individual Principal (Print and Sign)

Address (State and Zip Code) Business - Address

Telephone Number (Area Code) Telephone Number (Area Code)

ATTEST:

Corporate Principal

(Print and Sign)

(State and Zip Code) Business Address Name

Telephone Number (Area Code)

Address (State and Zip Code) (Affix Corporate Seal)

(Sign and Print)

ATTEST: Address (State and Zip Code)

______________________________________________ Corporate Surety

(Print and Sign)

Business Address

(Affix Corporate Seal)

Telephone:

Performance and Payment Bonds Page 5 of 6

I, , certify that I am the

Secretary of the Corporation named as Principal in the within Bond; that

, of said Corporation:

Title

Date:

Telephone No. (Affix Corporate Seal)

The rate of premium on this Bond is per thousand. Total of premium charge

NOTE: The above must be filled in by Corporate Surety.

Power-of-Attorney of person signed for Surety company must be attached.

Performance and Payment Bonds Page 6 of 6

CERTIFICATE AS TO CORPORATE PRINCIPAL

, who signed the said Bond on behalf of the Principal was then that I know his signature thereof is genuine; and that said Bond was duly signed, sealed, an attested for and in behalf of said Corporation by authority of its governing body.

Page 1 of 7Insurance Provisions and Limits

SECTION A-9

CITY OF LAREDO INSURANCE PROVISIONS AND LIMITS

Contractor shall provide and continuously maintain the minimum insurance coverages set forth below during the term of its agreement with the City of Laredo; and Contractor shall require its subcontractors to purchase the same types and amounts of insurance, at a minimum, as set forth below with respect to statutory workers ' compensation and liability insurance.

1. Commercial general liability standard ISO insurance at minimum combined single limits of

$1,000,000 per-occurrence and $2,000,000 general aggregate for bodily injury and property damage, which coverage shall include: products/completed operations ($2,000,000 products/completed operations aggregate);

XCU (explosion, collapse, underground) hazards; and contractual liability. Without limitation, the commercial general liability coverage must cover all operations required in the contract, as well as contractual liability for the indemnity obligations assumed by the Contractor in the contract. Coverage must be written on an occurrence form.

2. Workers' compensation insurance at statutory limits, including employers' liability coverage at minimum limits of $1,000,000 each-occurrence, each accident/$1,000,000 by disease each- occurrence/$1,000,000 by disease aggregate.

3. Commercial automobile liability insurance at a minimum combined single limit of $1,000,000 per-occurrence for bodily injury and property damage, including non-owned and hired car coverage and owned vehicles if any are owned .

At a minimum, coverage must apply to on-premises and transit operations.

Contractual liability coverage to be included in contractor's pollution liability coverage.

Retro date shall not be later than the inception date of contract.

$5,000,000 per- claim/$10,000,000 aggregate minimum.

5. Pollution Legal Liability if applicable:

a) Project costs of $1,000,000 to $10,000,000 and over $10,000,000; reference page four for limits.

b) Contractors Pollution Liability:

Applies to operations that include the use, application, or consumption of pollutants.

Retro date shall not be later than the inception date of contract.

Contractual liability coverage to be included in contractor's pollution liability coverage.

4. Umbrella liability or following-form excess liability at minimum limits, reference page four for project costs over $1,000,000. Coverage must be at least as broad as the underlying commercial general liability, auto liability, and employer's liability.

c) Environmental Liability:

a. Applies to asbestos and removal of other hazardous materials and/or repair, maintenance, installation, construction operations that are high hazard.

6. Professional liability applies to professional services which include but are not limited to design build contractors, engineers, and architects at minimum limits of $1,000,000 per-clairn/$2,000,000 annual aggregate.

The retro date shall not be later than the inception date of the contract. Reference page four for limits based on project cost.

10. Coverage for commercial general liability, professional liability, and pollution legal liability must be maintained for at least one (I) to two (2) years after the project is completed.

9. Insurance must be purchased from insurers that are financially acceptable to City of Laredo with a minimum A.M Best financial rating of A-:VII.

11. For project s in excess of $10,000,000 in cost, a per-project aggregate limit must be included in the commercial general liability.

7. Builders Risk if applicable:

a) "All-risk" including collapse, flood, and earthquake, to be written on completed value form.

b) Coverage to include limits of at least $250,000 for off-premises storage and transit of construction materials. Soft costs to be included at a minimum limit of $500,000.

c) Thirty (30)-day occupancy clause to apply.

d) No testing exclusion should apply.

With reference to the foregoing insurance requirements, Contractor shall specifically endorse applicable insurance policies as follows:

1. City of Laredo shall be named as an additional insured on a primary and non-contributory basis, regardless of the application of other insurance, with respect to all liability coverages, except for the professional liability and workers' compensation.

3. A waiver of subrogation in favor of City of Laredo shall be contained in all policies.

2. All liability policies shall contain no cross-liability exclusions or insured versus insured restrictions.

4. All insurance policies shall be endorsed to require the insurer to immediately notify City of Laredo of any material change in the insurance coverage.

5. All insurance policies shall be endorsed to the effect that City of Laredo will receive at least thirty (30) days' notice prior to cancellation or non-renewal of the insurance.

6. The additional insured coverage in the CGL policy in favor of City of Laredo must apply to the ongoing operations of Contractor for contract costs or up to $1,000,000 and expanded to include product s/completed operation for contract costs in excess of $1,000,000.

7. Required limits may be satisfied by any combination of primary and umbrella/excess liability insurances.

8. Contractor may maintain reasonable and customary deductibles, subject to approval by City of Laredo.

BONDS

All insurance must be written on standard ISO or equivalent forms. Certificates of insurance shall be prepared and executed by the insurance company, or its authorized agent, shall be furnished to City of Laredo within five

(5) business days of being notified of the award of the contract, and shall contain provisions representing and warranting the following:

Shall specifically set forth the notice-of-cancellation or termination provisions to City of Laredo.

Shall set forth all endorsements and insurance coverages according to requirements and instructions contained herein.

Copies of all required endorsements must be attached to the certificate of insurance. The certificates of insurance must be updated and resubmitted to the City of Laredo to show renewal coverages, as applicable, at least thirty (30) days prior to expiration of any one or more policies.

All of the above insurance provisions and limits are the minimum requirements, as referenced, and may be modified at the sole discretion of the City of Laredo.

Upon request, Contractor shall furnish City of Laredo with certified copies of all insurance policies.

Bonds are required for public works contracts under the following circumstance:

A Bid or Proposal Bond is required in the amount of the bid submitted to the City of Laredo. Proposers must submit a certified check or cashier's check payable to City of Laredo, or a satisfactory original Bid Bond executed by the Proposer and an acceptable surety, in an amount not less than five percent (5%) of the total bid based on the bid which check or bond shall be submitted as a guarantee that the bidder will enter into a contract, and execute performance and payment bonds within ten (10) days after Notice of Award of contract is given to him for contracts in excess of $50,000.00. Bids without the required check or bond will NOT be considered.

1. Performance Bond when the contract is in excess of $100,000, in a personal sum equal to 100% of the contract cost.

2. Payment or Labor and Material Bond when a contract is in excess of $50,000, each in a personal sum…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .