RFI_-7.docx
DOCX document 13 KB Posted
- Attached to
- Replace HVAC, Bldg 129 Federal contract opportunity
- Solicitation number
- FTFA031231
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_-8.docx | DOCX document | |
| 23_09_23_13_20_Spec_Amended.pdf | ||
| FA2823-15-R-4027_Spec_Amendment.pdf | ||
| FA2823-15-R-4027_Amendment_0005.pdf | ||
| FA2823-15-R-4027_Amendment_4.pdf | ||
| RFI_-6.docx | DOCX document | |
| RFI_-5.docx | DOCX document | |
| RFI's_2 3 4.docx | DOCX document | |
| Site_Visit.pdf | ||
| Amendment_3.pdf | ||
| Q_ _A_20_July_15.pdf | ||
| Amendment_2.pdf | ||
| 2_-_Affidavit_9_Jul_2013.pdf | ||
| Questions_and_Answers.docx | DOCX document | |
| Amendment_1.pdf | ||
| Appendix_B.pdf | ||
| ATTACHMENT_G_-_Wage_Determination.pdf | ||
| Appendix_C.pdf | ||
| FTFA03-1231SpecsFinal.pdf | ||
| Hold_Harmless.pdf | ||
| Appendix_A.pdf | ||
| Solicitation.pdf | ||
| 031231_Drawings_all_sheets.pdf | ||
| Bldg_129_Replace_HVAC_SOW_for_Construction.docx | DOCX document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FTFA 03-1231 REPLACE HVAC BUILDING 129
REQUEST FOR INFORMATION (RFI)-7
SECTION 23 09 23 3.2.13 Page 31
Q1: In order to select the correct chilled water meters. We need application details to select the correct rotor. What are the line size(s), flow rates, operating temperatures and pressures?
A1.0: Refer to Drawing Set, Sheet M-504; General Notes, Diagrams, and Diagrams Notes. Also, refer to sheet M-602, WC Magnetic Bearing Chiller Schedule for further details.
A1.1: The flowmeter shall be Turbine (Type), 316 SS (Material), 2-20 FPS (Range), within 0.5% of calibrated velocity (Accuracy), and 4-20 mA or 0-10 V (Outputs). The Contractor shall provide manufacturer’s recommended installation kit complete with branch outlet, nipple, full port ball, reducing bushing, and compression fittings. Also, accuracy shall be within +/- 0.5% of rate at the calibrated velocity, within +/- 1% of rate over a 10:1 turndown (3.0 to 30 FT/S) and within +/- 2% of rate over a 50:1.
Flowmeters of the spec references that the minimum straight unobstructed piping for the flowmeter installation shall be at least 10 pipe diameters upstream and at least 5 pipe diameters downstream and in accordance with the manufacturer's installation instructions.