Fire Station 43 – Apparatus Bay and Exterior Repaint

This is an Invitation to Bid (ITB #26-049-ITB) issued by the City of West Sacramento, California for interior and exterior repainting and wood damage repair services at Fire Station 43, an active emergency response facility. The base bid scope includes interior apparatus bay surface preparation and painting, exterior building painting and trim repair, CMU perimeter wall painting, surface patching and minor substrate repair, protection of adjacent surfaces, removal and reinstallation of signage, and cleanup and disposal of waste materials. Additive Alternate No. 1 includes repair and replacement of deteriorated and damaged exterior wood components as identified in a third-party Wood Destroying Pests and Organisms Inspection Report. A mandatory pre-proposal meeting is scheduled for June 12, 2026 at 10:00 am at Fire Station 43 (1561 Harbor Blvd, West Sacramento, CA 95691). The deadline for submitting questions is June 22, 2026 at 5:00 pm, with the proposal submission deadline set for July 23, 2026 at 2:00 pm via electronic submittal through OpenGov's e-Procurement Portal. Contractor selection is anticipated for September 16, 2026. The City reserves the right to award Additive Alternate No. 1 in whole or not at all based on available funding and bids received. All work must be coordinated to maintain continuous fire station operations.

Bidders must submit proposals using the City's electronic pricing table and are required to complete a W-9 form, provide proof of California Contractors State License Board registration, submit a current bid bond, and complete a Certification Regarding Debarment. The City will perform a SAM.GOV verification check to confirm debarment status. Proposers must comply with prevailing wage requirements as determined by the Department of Industrial Relations and must maintain all necessary business and professional licenses and certifications. Insurance requirements are detailed in an Insurance Checklist that all proposers must acknowledge. The proposal offer must remain valid for at least ninety (90) business days after the proposal due date. Award will be made to the lowest responsive, responsible bidder whose bid complies with all requirements. This project was previously rebid under Project ID 26-006-ITB due to bids exceeding available funding and non-responsive submissions; the current rebid includes revisions to the original scope with apparatus bay flooring work removed and dry rot repair moved to an additive alternate.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

26-049-ITB

FIRE STATION 43 – APPARATUS BAY AND EXTERIOR REPAINT

City of West Sacramento

1110 W Capitol Ave

West Sacramento, CA 95691

RELEASE DATE: June 5, 2026

DEADLINE FOR QUESTIONS: June 22, 2026

RESPONSE DEADLINE: July 23, 2026, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/cityofwestsacramento https://procurement.opengov.com/portal/%7bproject.government.code%7d

City of West Sacramento

INVITATION TO BID

Fire Station 43 – Apparatus Bay and Exterior Repaint

I. Introduction II. Project Details

III. Terms and Conditions IV. Bid Submittal V. Cost Table

VI. Contract Award

Attachments:

A - Fire Station 43 – Apparatus Bay and Exterior Repaint Construction Bid Packet

B - Insurance Checklist

C - Fire Station 43 Dry Rot Inspection Report and Quote

D - Photos for Bid

E - Fire_Station_43_Building_Shell_Layuot

F - Scuff Tuff EG

G - Pro Ind Pre-Cat Epoxy EG

Invitation to Bid #26-049-ITB Title: Fire Station 43 – Apparatus Bay and Exterior Repaint

1. Introduction

1.1. Summary

The City of West Sacramento is accepting sealed responses for Fire Station 43 – Apparatus Bay and

Exterior Repaint to be received no later than Thursday, July 23, 2026 at 2:00 pm.

Fire Station 43 is an active emergency response facility operated by the City of West Sacramento Fire

Department. The apparatus bay interior masonry walls, ceiling surfaces, exterior painted areas, and existing concrete slab surfaces have experienced normal operational wear due to daily apparatus traffic and environmental exposure.

The City intends to repaint designated interior and exterior surfaces and install a durable resinous flooring system within the apparatus bays to improve durability, cleanability, and long-term performance.

All work shall be coordinated to maintain continuous Fire Station operations.

The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full.

1.2. Background

West Sacramento is a vibrant riverfront community centrally located in Northern California. West

Sacramento shares the Sacramento River with neighboring Sacramento, with the deep water ship canal serving the Port of Sacramento. Incorporated in 1987, West Sacramento encompasses approximately 22 square miles, with a population just over 55,000. West Sacramento has a Council/Manager form of government. Citizens elect four City Council Members by district (as of the November, 2022 election) who serve four year terms and directly elect the mayor who serves a four-year term. The City is full-service with nine (9) departments and nearly 500 full-time employees. The City provides the full range of municipal services including police and fire protection, park, street, fleet, and facility maintenance, economic development and housing, community development, capital projects, and parks and recreation. The City also provides water, wastewater, and solid waste services. In addition, the City maintains port, water, wastewater, and solid waste enterprise funds. Other activities and related entities include the West Sacramento Redevelopment Successor Agency, Reclamation District 900 and the West Sacramento Area Flood Control Agency.

1.3. Contact Information

Damir Arushanov

Project Manager

1110 West Capital Avenue

West Sacramento, CA 95691

Email: damira@cityofwestsacramento.org

Phone: (916) 617-4913 https://secure.procurenow.com/portal/cityofwestsacramento/projects/262623/document?section=undefined mailto:damira@cityofwestsacramento.org tel:(916)617-4913

Department:

Capital Projects - Construction

1.4. Timeline

Release Project Date June 5, 2026

Pre-Proposal Meeting (Mandatory) June 12, 2026, 10:00am

Fire Station 43 - 1561 Harbor Blvd, West

Sacramento, CA 95691

Question Submission Deadline June 22, 2026, 5:00pm

Proposal Submission Deadline July 23, 2026, 2:00pm

Microsoft Teams meeting

Join:

https://teams.microsoft.com/meet/283403205161

169?p=dXw2k98SolLnfbHiam

Meeting ID: 283 403 205 161 169

Passcode: NE2hK3jS

Dial in by phone

+1 619-485-0116,,910923693# United States, All locations

Phone conference ID: 910 923 693#

Contractor Selection Date September 16, 2026 https://teams.microsoft.com/meet/283403205161169?p=dXw2k98SolLnfbHiam https://teams.microsoft.com/meet/283403205161169?p=dXw2k98SolLnfbHiam

2. Project Details

2.1. Important Instructions for Electronic Submittal

The City of West Sacramento is only accepting electronic bid submissions and only through its online bidding platform, OpenGov. Bidders shall create a FREE account by signing up at OpenGov.com. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.

The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full

2.2. PROJECT SCOPE OVERVIEW

The Fire Station 43 Apparatus Bay Interior & Building Exterior Painting and Resinous Flooring Project consists of furnishing all labor, materials, equipment, tools, supervision, and incidentals necessary to complete interior and exterior painting improvements and, if awarded, installation of a heavy-duty resinous flooring system or concrete stain system at Fire Station 43.

Base Bid

The Base Bid includes, but is not limited to:

• Interior apparatus bay surface preparation and painting

• Exterior building painting and trim repair

• CMU perimeter wall painting

• Surface patching and minor substrate repair

• Protection of adjacent surfaces and City property

• Removal and reinstallation of signage as required

• Cleanup and lawful disposal of all waste materials

All work necessary to provide a complete and fully operational finished product, whether specifically described or reasonably inferable from the Contract Documents, shall be included in the Base Bid or the

Additive Alternate, as applicable.

Additive Alternate No. 1 – Dry Rot and Wood Damage Repair

Additive Alternate No. 1 consists of the repair and replacement of deteriorated and damaged exterior wood components at Fire Station 43, as identified in the third-party Wood Destroying Pests and

Organisms Inspection Report prepared by Goodlife Inspections (Report No. 45077 LIM), attached to these Contract Documents and incorporated by reference. The Contractor shall refer to the attached report for scope, findings, locations, and quantities.

https://secure.procurenow.com/portal/cityofwestsacramento/projects/262623/document?section=undefined

The City reserves the right to award Additive Alternate No. 1, in whole or not at all, in its sole discretion based on available funding and the bids received.

Refer to the Technical Specifications in the bid packet for the full scope of work, product requirements, surface preparation, and acceptance standards governing the painting and wood repair work. In the event of a conflict between this overview and the Technical Specifications, the Technical

Specifications shall govern.

Site Familiarization – 3D Virtual Tour & Building Layout

A 3D virtual tour of Fire Station 43, including interior apparatus bay views and an interactive building floor plan, is available for bidders' reference at the following link:

https://www.asteroommls.com/pviewer?hideleadgen=1&token=jpneCPpjNkSMe2UoUlYXag&autorotati on=0

The 3D tour is provided as a courtesy for general site familiarization only and does not relieve the bidder of the obligation to visit the site, verify existing conditions, take field measurements, and satisfy itself as to the conditions under which the Work will be performed. In the event of any conflict between the 3D tour and actual site conditions, actual site conditions shall govern. Dimensions, finishes, quantities, and conditions shown in the virtual tour are approximate and shall not be relied upon for bidding or construction.

2.3. Rebid Information

2.3. Rebid Information

This project was previously advertised for bid under Project ID 26-006-ITB.

Staff is recommending or has recommended rejection of all bids, with Council action anticipated or approved in June of 2026.

The project is being rebid due to bids exceeding available funding and non responsive submissions.

This rebid solicitation may include revisions to the original scope, including removal of the apparatus bay flooring work, with dry rot and wood damage repair now bid as an additive alternate.

https://www.asteroommls.com/pviewer?hideleadgen=1&token=jpneCPpjNkSMe2UoUlYXag&autorotation=0 https://www.asteroommls.com/pviewer?hideleadgen=1&token=jpneCPpjNkSMe2UoUlYXag&autorotation=0

3. Terms and Conditions

3.1. Prevailing Wages

A. Contractor Registration. Pursuant to Labor Code section 1725.5, no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR pursuant to Labor Code section 1725.5. The work contemplated by this

ITB is subject to compliance monitoring and enforcement by the DIR.

B. Prevailing Wages. Proposers are hereby notified that the DIR has determined the general prevailing rate of wages for each craft, classification, or type of worker needed to execute the work. Copies of the current schedules for California prevailing wages are located in the City’s office, and the contents of those schedules are included herein as if set forth in full. Licensure and Special Certification.

3.2. Statement of Offer

Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost

Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date.

3.3. Project Management Documentation & Administration

Virtual Project Manager (VPM)

The City anticipates using an online cloud-based project management system to manage, assign, and coordinate specific tasks with the City's selected Contractor within the Scope of Work. By way of this section, the City reserves the right to utilize an online cloud-based project management system. By submitting a bid, bidder acknowledges and agrees that they are prepared to use the system, as may be required by the City. The City's specific system is Virtual Project Manager (VPM). VPM allows for paperless documentation and project administration. For more information on VPM, go to www.virtual-pm.com

A. Submittal Procedures and Construction Progress Documentation for requirements for administering and using VPM.

1. The Contractor shall submit the items associated with this section via Virtual Project

Manager (VPM), an online cloud-based project management system, as specified below.

2. Virtual Project Manager (VPM) allows for paperless documentation and project administration. All posted information is available to all personnel involved with the project at any time using the internet.

3. The use of VPM by the Contractor is mandatory. Access to VPM will be provided at no cost to the contractor.

4. In order to utilize VPM, the contractor needs a computer, internet access, a digital camera, and a scanner. For more information, go to www.virtual-pm.com. To Login, from the homepage, select LOGIN and enter the Username and Password that will be provided to you by the agency.

B. The contractor shall use the following features:

1. Daily Logs: Contractor’s daily reports shall be entered electronically via VPM.

2. Change Order Manager: Contractor requests for change order shall be submitted electronically via VPM.

3. Transmittals: Schedules, Pay applications, etc. shall be submitted electronically via VPM.

4. Submittals: Submittals requiring approval shall be submitted electronically via VPM.

5. RFIs: Requests for information (RFIs) shall be submitted electronically via VPM.

C. Technical Submittals

1. Submittal Procedure

a. The Contractor shall utilize the agency’s online cloud-based project management system

(Virtual Project Manager) for submittals.

3.4. Questions and/or Objections

It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the ITB and help prevent the opening of defective proposals upon which the City could not award a Contract. Proposer should carefully review this ITB and all attachments for comments, questions, defects, objections, or any other matter requiring clarification or correction (collectively, “Questions”).

A Proposer may submit Questions related to this RFP to the City through the City’s e-Procurement Portal at or before:

Monday, June 22, 2026 at 5:00 pm.

Questions shall be considered waived and invalid if not brought to the attention of the City in conformity with this subsection. Questions not submitted through the City's e-Procurement Portal will not be accepted or responded to. Questions submitted after the deadline will not be accepted or responded to. Questions and answers will be posted on the City's e-Procurement Portal and visible to all.

3.5. Amendment and Cancellation

The City reserves the right to amend, cancel, or reissue this bid at any time and at its sole discretion. Any amendment shall be in writing and posted to the City's e-Procurement portal. A potential Proposer is solely responsible for clicking "Follow" on the main page to receive notifications and shall be solely responsible for complying with such notifications.

https://secure.procurenow.com/portal/CityofWestSacramento

3.6. Right of Rejection

A. The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this ITB in its entirety.

B. A Proposer must comply with all of the terms and instruction of this ITB, and all applicable state and local laws and regulations. Any Proposal that does not meet the requirements of this ITB may be considered to be nonresponsive and rejected.

C. A Proposer may not restrict the rights of the City or otherwise qualify a Proposal. If a Proposer does so, the City may determine the Proposal is a nonresponsive counteroffer, and the Proposal may be rejected.

D. The City reserves the right, at its sole discretion, to waive variances in a Proposal, provided such action is in the best interest of the City. Where the City waives variances in a Proposal, such waiver does not modify the ITB requirements or excuse the Proposer from full compliance with the ITB. Notwithstanding any variance, the City may hold any Proposer to strict compliance with the ITB.

3.7. Prohibition of Respondent Terms and Conditions

A Proposer shall not submit their own contract terms and conditions in a Proposal. If a Proposal contains such terms and conditions, the City, at its sole discretion, may reject the Proposal. A Proposer may either submit Questions to gain clarification on a term of the City's standard contract or submit proposed revisions to the City's standard contract in redline as part of the Proposal Transmission Letter, both pursuant to the terms of this ITB.

3.8. Joint Ventures and Partnering

A Proposal from joint ventures or entities partnering for a specific service must be designed to minimize any administrative burden on the City as a result of the participation of multiple entities. Joint proposals must adhere to the following:

A. The Proposal shall respond to each section and subsection of this ITB.

B. The Proposal shall clearly set forth the respective responsibilities and functions that each

Principal of the joint venture or partnering entities would perform if awarded a Contract pursuant to this ITB.

C. The Proposal must include a copy of the joint venture or partnering agreement(s) that identify the Principals involved, as well as their rights and responsibilities regarding the Contract pursuant to this ITB.

D. The Proposal Transmittal Letter must be signed by each Principal of the joint venture and include all required information.

3.9. Proposal of Alternate Services

A Proposal for alternate services (i.e., proposals that offer something different from that requested by the ITB) will be considered nonresponsive and rejected.

3.10. Proposal of Additional Services

A Proposal may indicate and offer services in addition to those required by this ITB. These additional services may be added to the Contract, at the sole discretion of the City. The cost for any such additional services shall be mutually agreed upon by the Contractor and the City, and incorporated into the

Contract before execution.

3.11. Severability

If any provision of this ITB is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected, and the rights and obligations of the City and

Proposers shall be construed and enforced as if the ITB did not contain the particular provision held to be invalid.

3.12. Licensure and Special Certification

Before executing the Contract pursuant to this ITB, the Contractor must hold all necessary business and professional licenses and certifications to complete the Scope of Work. The City may require any or all

Proposers to submit evidence of proper licensure and certifications.

3.13. Disclosure of Proposal Contents

All Proposals and other materials submitted to the City related to this ITB shall become the property of the City. Selection or rejection of a Proposal does not affect this right. All proposal information, including detailed price and cost information, shall be held in confidence during the evaluation and selection process. Upon the completion of the evaluation and selection process, or by rejection of all Proposals, the Proposals and shall be open for review by the public to the extent required by the California Public

Records Act, Government Code section 6254 et seq.. By submitting a Proposal, a Proposer acknowledges and accepts that the contents of the Proposal and associated documents shall become open to public inspection.

Portions of a Proposal exempt from public disclosure by law may be protected from public disclosure by the City. A Proposer is required to clearly label such portion of a Proposal "CONFIDENTIAL" and list the grounds for non-disclosure. In doing so, the Proposer thereby agrees to indemnify and defend the City from any action arising from the non-disclosure of the information. The failure to so label any information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.

3.14. Conflict of Interest and Restrictions

By submitting a Proposal, the Proposer certifies that no amount shall be paid directly or indirectly to an employee or official of the City as wages, compensation, or gifts in exchange for acting as an officer, agent, employee, subcontractor, or consultant to the Proposer in connection with the procurement under this ITB.

3.15. Proprietary Information

A copy of each Proposal shall be retained for official files and will become public record after the award of a contract unless the Proposal, or specific parts of the Proposal, can be shown to be exempt by law.

Each Proposer may clearly label any part of a Proposal as "CONFIDENTIAL." In doing so, the Proposer thereby agrees to indemnify and defend the City for withholding the information from public inspection.

Failure to label information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.

If a public records request for appropriately-labeled information is received by the City, the City will endeavor to notify the Proposer of the request and delay access to the material until seven (7) working days after the City’s notice. Within that time delay, it will be the duty of the Proposer to act in protection of its labeled information. Failure to so act shall constitute a complete waiver.

4. Bid Submittal

4.1. Please upload a current W-9*

Please download the attached 2024 W9 form and upload a completed form.

• W-9_Form_ver._2024_-_BLANK.pdf

*Response required

4.2. Please enter Legal Company Name and related DBA*

Please state your company name and any related DBA's based on your California Secretary of State

Filing.

*Response required

4.3. Statement of Offer*

Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost

Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date.

☐ Please confirm

*Response required

4.4. Cost Proposal using Electronic Pricing Table*

The bidder acknowledges that a Cost Proposal must be completed using the electronic pricing table provided in the City’s e-Procurement Portal and that this information will be kept separate from the rest of the bid response. The bidder further acknowledges that all pricing and related costs will be based solely on the information entered in the electronic pricing table. The City will not be responsible for any errors, omissions, or discrepancies contained in any additional or supplemental pricing documents submitted by the bidder.

☐ Please confirm

*Response required

4.5. Response (without Cost Proposal)*

Please Upload Your Response Here, excluding your Cost Proposal.

*Response required

4.6. Bid Bond*

Bid contents, including requisite declarations and forms to be signed and included in the Bid, are included in the Attachments - Bid Docs

*Response required

4.7. California Contractors State License Board

Please enter your contractor license number for verification.

https://government-project.s3.us-west-2.amazonaws.com/4013/4713e161-0e9b-428f-be7a-2b0ae306a414_W-9_Form_ver._2024_-_BLANK.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4CWEYI4YM%2F20260605%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260605T172131Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEKj%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQC1pjU8r%2B%2F1fjeXkYXGY5kMymZFcDpGL7Od604%2FVsxx6wIgKR6qaLMQ1Q%2BGBNySzSCfLQvJprG4iuOPeLo0G5J98VkqjAUIcRACGgw4OTIzNjQ2ODc2NzIiDM28Tl7D90o2r8mspirpBB8TSXIORnFkYVSbKeQNDNAqRaz6ZqUyiSrRzA1KDJ9A4LMae%2FVWT3BTpCANp%2BWb35ZhLrir37kz2IsOSnxGHUoPtEJD6oVENDw3cQuMmU743wml7FaG5UnpCV2eaSLV3cdh%2BbiYLmJf54%2FVyOpGy4kCAxltW8yyGmROuQ21wUdQzPSSt%2Fk5QKz3DAHvGWttdpbnzpkfvQkhNXnMjjyFf8hulsmqE%2BYK8DBJV1f9EHQMnyGLI1zk%2Ff4OvRVqkDGeMRT19xDCGKPMyWvq8%2Foy%2FAlT8PcJ1G78Ap%2Ft1tPywRQABjvKKoA9wF1FbBppWs2oPF60EfYbJBR3YOCaNAz1loHkNsN%2BLxtFa9sgGynL0nR6fAj41myMbhDsFJANpqN%2B246n3UXELCazz%2Bi1StBClgKWYw2GBL6dDQNp17GhOAOf9z2x6sLPDz8FIeWZDdM65YAqOq2SdkZxFurpRglxR0bTQmbi%2BGwvQ98xSgkES86TBOa8VcjqTb3bB9o%2FACP7%2FS9Qo41f4yxOZTdkCCHGq8P3dmMkEuEQp7WFCzdmfzbOaV0MHjZaJ8qPKlCyCt1rUoMBpdZP3qqphrIEI0UNPFP8I3KQmfB0yScg6f81RI5AhXwKBmJEir6lG%2FuUciVw0OgkySz4eXwnlTOva5odvvinRUS0Uvpny8abwc6P2m3kd6GqBSnoyI5MFd1NqOVkPzCi7iuRoWB1OC%2FmeBBLh9HFTUr15FABuNlfFWMdqQjClecGeY3L0X4HG4y1Zue7L%2B2F23jCSV%2BW%2BC%2FouJNHZs2k9f7%2FPbOZr0J68R64BZIBxtu24tm%2FAgDnMMXci9EGOpkBV8%2F1yvHKj1Fby0Ws33WskqnzXJ70wMnjheGricfvIw%2FoUVo3jqdF8FkJu9QUD4C42fyRM8z8%2BZNuZlgx5j8tx5CdgL7H7IJ8N2%2BF9LeaIKB45w6wU8lOV3dG%2Fi454mhPCbBl2g41JjTxpXIuGdTsnIChHxm3VVuUo0GVzRTeT6NsSA0nEddSh5FvpnlfmGNNWGlfh%2F1Lwlxu&X-Amz-Signature=5ce8c8cccb2c6072ad2f47939e2ac0bb02bf901555d545c91ad144165829eefc&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22W-9_Form_ver._2024_-_BLANK.pdf%22&x-id=GetObject https://secure.procurenow.com/portal/cityofwestsacramento/projects/262623/document?section=2520937

4.8. Certification regarding Debarment

The City performs a SAM.GOV verification check to confirm debarment status. Please download the attached document, complete the form, and upload.

A unique entity identifier is requested for contracts greater than $25,000 or funded with Federal dollars.

Your entity may register for a unique entity identifier on SAM.GOV at the following link https://sam.gov/content/entity-registration.

For all other proposers, the completed form is sufficient.

• Certification_Regarding_Deb...

4.9. City Contract *

The Proposer acknowledges and is presumed to have accepted the Contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification pursuant to the Contract.

☐ Yes

☐ No

*Response required

4.10. Insurance Requirements*

The Proposer acknowledges the City's insurance requirements and endorsements as outlined in the

Insurance Checklist in Attachments. Any Proposal unable to meet the Insurance Checklist requirements shall be considered nonresponsive and ineligible for Contract award.

☐ Yes

☐ No

*Response required

4.11. Authorized Contract Signer *

Please provide the name, title and email address of the authorized contract signer.

*Response required https://government-project.s3.us-west-2.amazonaws.com/4013/7fbcd8f3-7d1e-4b79-a50c-03f71fe54e62_Certification_Regarding_Debarment_Form_COWS.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4CWEYI4YM%2F20260605%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260605T172131Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEKj%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQC1pjU8r%2B%2F1fjeXkYXGY5kMymZFcDpGL7Od604%2FVsxx6wIgKR6qaLMQ1Q%2BGBNySzSCfLQvJprG4iuOPeLo0G5J98VkqjAUIcRACGgw4OTIzNjQ2ODc2NzIiDM28Tl7D90o2r8mspirpBB8TSXIORnFkYVSbKeQNDNAqRaz6ZqUyiSrRzA1KDJ9A4LMae%2FVWT3BTpCANp%2BWb35ZhLrir37kz2IsOSnxGHUoPtEJD6oVENDw3cQuMmU743wml7FaG5UnpCV2eaSLV3cdh%2BbiYLmJf54%2FVyOpGy4kCAxltW8yyGmROuQ21wUdQzPSSt%2Fk5QKz3DAHvGWttdpbnzpkfvQkhNXnMjjyFf8hulsmqE%2BYK8DBJV1f9EHQMnyGLI1zk%2Ff4OvRVqkDGeMRT19xDCGKPMyWvq8%2Foy%2FAlT8PcJ1G78Ap%2Ft1tPywRQABjvKKoA9wF1FbBppWs2oPF60EfYbJBR3YOCaNAz1loHkNsN%2BLxtFa9sgGynL0nR6fAj41myMbhDsFJANpqN%2B246n3UXELCazz%2Bi1StBClgKWYw2GBL6dDQNp17GhOAOf9z2x6sLPDz8FIeWZDdM65YAqOq2SdkZxFurpRglxR0bTQmbi%2BGwvQ98xSgkES86TBOa8VcjqTb3bB9o%2FACP7%2FS9Qo41f4yxOZTdkCCHGq8P3dmMkEuEQp7WFCzdmfzbOaV0MHjZaJ8qPKlCyCt1rUoMBpdZP3qqphrIEI0UNPFP8I3KQmfB0yScg6f81RI5AhXwKBmJEir6lG%2FuUciVw0OgkySz4eXwnlTOva5odvvinRUS0Uvpny8abwc6P2m3kd6GqBSnoyI5MFd1NqOVkPzCi7iuRoWB1OC%2FmeBBLh9HFTUr15FABuNlfFWMdqQjClecGeY3L0X4HG4y1Zue7L%2B2F23jCSV%2BW%2BC%2FouJNHZs2k9f7%2FPbOZr0J68R64BZIBxtu24tm%2FAgDnMMXci9EGOpkBV8%2F1yvHKj1Fby0Ws33WskqnzXJ70wMnjheGricfvIw%2FoUVo3jqdF8FkJu9QUD4C42fyRM8z8%2BZNuZlgx5j8tx5CdgL7H7IJ8N2%2BF9LeaIKB45w6wU8lOV3dG%2Fi454mhPCbBl2g41JjTxpXIuGdTsnIChHxm3VVuUo0GVzRTeT6NsSA0nEddSh5FvpnlfmGNNWGlfh%2F1Lwlxu&X-Amz-Signature=4977c09ad6e0d381917727e6b82929ec74c061c337e9537497344ac4ed374f78&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Certification_Regarding_Debarment_Form_COWS.pdf%22&x-id=GetObject https://secure.procurenow.com/portal/cityofwestsacramento/projects/262623/document?section=undefined

5. Cost Table

BASE BID – PAINTING IMPROVEMENTS

CIP-51054

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Mobilization, Setup, Protection, Dust

Control

1 LS

2 Interior Surface Preparation –

Apparatus Bays (Walls, Ceilings, Conduit, Doors)

1 LS

3 Interior Painting – Apparatus Bays

(Primer & Finish Coats)

1 LS

4 Exterior Painting – Building & Trim 1 LS

5 CMU Perimeter Wall/Fence Painting 1 LS

6 Stucco Patch and Paint – Removal of

Existing Siren Light and Horn

1 LS

7 Lettering, Gate, Flag Pole Base

Painting

1 LS

8 Temporary Removal and

Reinstallation of Exterior Signage

1 LS

9 Cleanup & Lawful Disposal – Painting 1 LS

10 Exterior Sealant – Remove and

Replace Loose/Cracked Sealant at

Joints and Penetrations

1 LS

TOTAL

ADD ALT 1

TABLE 2 — ADDITIVE ALTERNATE NO. 1 – DRY ROT AND WOOD DAMAGE REPAIR

Line Item Description Quantity Unit of

Measure Unit Cost Total

11 Dry Rot and Wood Damage Repair per

Section 06 73 00 and attached

Goodlife Inspections Report (No.

45077 LIM) – includes wood removal, replacement, priming, stucco/sealant repair, and lawful disposal

1 LS

TOTAL

6. Contract Award

6.1. Opening & Award of Contract

Bids will be opened publicly and read aloud at the time and date established in the invitation to Bidders.

Bid Summaries may be made available to Bidders after the Bid Date.

The City reserves the right to accept or reject any and all Bids for a period of sixty (60) days after the date of opening, and to waive any informality or irregularity in any Bid. No Bid can be withdrawn during that period, except pursuant to Public Contract Code section 5102, et seq. 1751480.1 7203-001

The City reserves the right to reject any or all Bids, including, without limitation, the right to reject any non-conforming, non-responsive, or conditional bids.

Before a Bid is considered for award, the City may, in addition to the Experience & Qualifications form included in the Bid documents, require a Bidder to submit a statement of facts and detail as to its business, technical organization and financial resources and equipment available and to be used in performing the work. Additionally, the City may require evidence that the Bidder has performed other work of comparable magnitude and type. The City expressly reserves the right to reject any Bid if it determines that the business and technical organization, equipment, financial and other resources or other experience of the Bidder (including the bidder’s Subcontractors) is not sufficiently qualified for the work Bid upon and, therefore, justifies such rejection.

The award of the Contract, if it is awarded, will be to the lowest responsive, responsible Bidder whose

Bid complies with the requirements set forth herein.

The issuance by the City of a notice to the successful Bidder of the award of the Contract (“Notice of

Award”) shall be deemed the Award of Contract.

6.2. Bid Protests

The lack of a prompt procedure to resolve disputes regarding the bidding process would impair the

City’s ability to carry out its purpose of constructing this project in a timely manner. Therefore, to the maximum extent authorized by law and notwithstanding any other procedures specified in documents referenced herein, all disputes and/or protests regarding the bidding process shall be subject to the following procedure. In submitting a Bid to the City for this project, the Bidder agrees to comply with and to be bound by this procedure.

Any Bid protest must be submitted in writing to the Director of Capital Projects & Transportation of the

City of West Sacramento before 5:00 p.m. on the fifth (5th) working day following Bid opening.

(a) The initial protest document must contain a complete statement of the basis for the protest, and all supporting documentation.

(b) The party filing the protest must have actually submitted a Bid for the Work. A Subcontractor of a party submitting a Bid for the Work may not submit a Bid protest. A party may not rely on the Bid protest submitted by another Bidder, but must timely pursue its own protest.

(c) The protest must refer to the specific portion of the Contract Documents which forms the basis for the protest.

(d) The protest must include the name, address and telephone number of the person representing the protesting party.

(e) The party filing the protest must concurrently transmit a copy of the initial protest document and any attached documentation to all other parties with a direct financial interest which may be adversely affected by the outcome of the protest. Such parties shall include all other Bidders who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.

(f) The City will give the protested Bidder five (5) working days after the receipt of the protest to submit a written response. The responding Bidder shall transmit the response to the protesting Bidder concurrent with delivery to the City.

(g) The procedure and time limits set forth in this paragraph are mandatory and are the Bidder’s sole and exclusive remedy in the event of Bid protest. The Bidder’s failure to comply with these procedures shall constitute a waiver of any right to further pursue the Bid protest, including filing a Government

Code Claim or legal proceedings.

(h) If the City determines that a protest is frivolous, the protesting Bidder may be determined to be non-responsible and that Bidder may be determined to be ineligible for future contract awards.

1. Introduction
1.1. Summary
1.2. Background
1.3. Contact Information
1.4. Timeline
2. Project Details
2.1. Important Instructions for Electronic Submittal
2.2. PROJECT SCOPE OVERVIEW
2.3. Rebid Information
3. Terms and Conditions
3.1. Prevailing Wages
3.2. Statement of Offer
3.3. Project Management Documentation & Administration
3.4. Questions and/or Objections
3.5. Amendment and Cancellation
3.6. Right of Rejection
3.7. Prohibition of Respondent Terms and Conditions
3.8. Joint Ventures and Partnering
3.9. Proposal of Alternate Services
3.10. Proposal of Additional Services
3.11. Severability
3.12. Licensure and Special Certification
3.13. Disclosure of Proposal Contents
3.14. Conflict of Interest and Restrictions
3.15. Proprietary Information
4. Bid Submittal
4.1. Please upload a current W-9*
4.2. Please enter Legal Company Name and related DBA*
4.3. Statement of Offer*
4.4. Cost Proposal using Electronic Pricing Table*
4.5. Response (without Cost Proposal)*
4.6. Bid Bond*
4.7. California Contractors State License Board
4.8. Certification regarding Debarment
4.9. City Contract *
4.10. Insurance Requirements*
4.11. Authorized Contract Signer *
5. Cost Table
6. Contract Award
6.1. Opening & Award of Contract
6.2. Bid Protests

File details come from the government source that posted it. Updated .