FINAL TMP NH 0300 176 R.pdf

PDF 449 KB Posted

Attached to
NH-0300(176)R Freeway Management System Phase 4
Solicitation number
B26003484
Issued by
Honolulu County, Hawaii

About this file

This Transportation Management Plan (TMP) document, prepared by AECOM for the Hawaii Department of Transportation (HDOT) Highways Division, outlines traffic management strategies for the Freeway Management System Phase 4, Unit 1 project (Federal-Aid Project No. NH-0300(176)). The project encompasses the replacement of 72 existing closed-circuit television (CCTV) cameras and installation of 5 new CCTV cameras along the H-3 Freeway (including within the Tetsuo Harano Tunnel), Pali Highway, H-201 Freeway, and H-1 Freeway, along with installation of fiber optic cable and conduit infrastructure. The project is expected to require approximately 12 months for completion, with construction activities scheduled to occur during designated daytime hours (typically 8:30 AM to 3:00 PM on weekdays) and overnight hours (9:00 PM to 4:00 AM) for specific work zones. The TMP designates this project as a Level 1 significant project and establishes work hour windows based on traffic volume analysis to minimize impacts to commuters, with most CCTV replacement and installation work requiring shoulder closures or single lane closures during off-peak periods.

The project utilizes Federal Aid funding as a Capital Improvement Program (CIP) initiative through HDOT. Work zone traffic control will be implemented using standard HDOT temporary traffic control measures, public information strategies, and operational management practices in accordance with the Hawaii Department of Transportation Standard Specifications, Highway Capacity Manual, Federal Highway Administration Rule on Work Zone Safety and Mobility, and Manual on Uniform Traffic Control Devices. Traffic analysis based on 24-hour automated traffic recorder data determined optimal work windows by comparing existing traffic volumes against a baseline capacity threshold of 1,300 passenger cars per lane per hour. The TMP identifies specific closure impacts for each location, with most work scheduled during mid-day off-peak periods (8:30 AM to 3:00 PM) to avoid morning and evening commuter peak hours, while fiber and conduit installation at the H-1 Kalihi Interchange requires night work (9:00 PM to 4:00 AM) due to traffic interchange complexity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Freeway Management System, Phase 4, Unit 1 Traffic Management Plan

State of Hawaii Department of Transportation Highways Division Project No. NH-0300(176)

July 9th, 2025

TRANSPORTATION MANAGEMENT PLAN

FREEWAY MANAGEMENT SYSTEM

PHASE 4, UNIT 1

Federal-Aid Project No. NH-0300(176)

Prepared for

State of Hawaii

Prepared by

AECOM

Honolulu, Hawaii

July 9th, 2025

Freeway Management System, Phase 4 Transportation Management Plan

Prepared for: HDOT AECOM iii

Table of Contents

1. Executive Summary

2. Introduction

3. Roles and Responsibilities

4. Project Description Project Background Project Type Project Area/ Corridor Project Goals and Constraints Proposed Construction Phasing/Staging General Schedule and Timeline Related Project Information

5. Existing and Construction Conditions Existing Roadway Characteristics Existing and Historical Traffic Data Existing Traffic Operations Construction Conditions Traffic Predictions During Construction CCTV Replacement CCTV Installation Fiber and Conduit Installation Incident and Crash Data

6. Work Zone Impact Assessment Report Qualitative Summary of Anticipated Work Zone Impacts Impacts Assessment of Alternative Project Design and Management Strategies Traffic Analysis Results

7. Selected Work Zone Impacts Management Strategies

8. TMP Monitoring During Construction

Prepared for: HDOT AECOM iv

Figures Figure 1. CCTV and Conduit Location Map

Tables Table 1. CCTV Work Roadway Impacts Table 2. Fiber/Conduit Work Roadway Impacts

Appendices

Appendix A - Determination of a Significant Highway Project Appendix B - Construction Schedule Appendix C - Traffic Data Summary

Prepared for: HDOT AECOM 1

1. Executive Summary The purpose of this Transportation Management Plan (TMP) is to provide a safe and effective plan through the implementation of a set of coordinated transportation management strategies and a description of how the strategies will be used to manage work zone traffic impacts.

AECOM has prepared the TMP in accordance with Hawaii Department of Transportation (HDOT) Standard Specifications, the Transportation Research Board’s Highway Capacity Manual, the Federal Highway Administration’s Rule on Work Zone Safety and Mobility and the Manual on Uniform Traffic Control Devices.

Suggested transportation management strategies for the project work zones include adoption of standard HDOT temporary traffic control measures and devices, public information/outreach, and operational strategies.

Prepared for: HDOT AECOM 2

2. Introduction This project specific Transportation Management Plan (TMP) has been developed to manage traffic operations associated with the construction of the closed-circuit television (CCTV) upgrades and conduit installation to occur along segments of the H-3, H-201, H-1 Freeways and Pali Highway. According to criteria in the “Determination of a Significant Highway Project” flow chart, this project is determined to be a Level 1 project. The TMP Level of Determination is included in Appendix A.

3. Roles and Responsibilities TMP Manager: To be determined

Author: AECOM

Stakeholder Review Committee: To be determined

TMP Monitor: To be determined

Emergency Contact(s): To be determined

4. Project Description Project Background The project includes the installation of five (5) new CCTV cameras and associated power and communication infrastructure, the replacement of seventy-two (72) existing cameras, including cameras located within the Tetsuo Harano tunnel along the H-3 Freeway, the installation of a cable and conduit on the shoulder of a short stretch of H-1 Freeway between Kalihi Street on-ramps and Houghtailing Street. Of the five new cameras, two (2) new CCTV camera locations are to be installed along H-3 Freeway and the other three (3) CCTV camera locations will be on Pali Highway (Route 61). The project also includes the installation of fiber optic cable along the length the H-3 Freeway beginning within interchange area of the H-201 Freeway and extending to the intersection of Kamehameha Highway 83.

Project Type This project is a Capital Improvement Program (CIP) using Federal Funds.

Project Area/ Corridor The project involves the installation of CCTV cameras and conduit as shown in Figure 1.

Prepared for: HDOT AECOM 3

Figure 1. CCTV and Conduit Location Map

Prepared for: HDOT

AECOM 4

Project Goals and Constraints HDOT is upgrading and improving the operations of the current Freeway Management System (FMS) to improve the efficiency of current traffic operations on the Oahu freeways. The objectives of the proposed upgrades will enhance freeway operations to include:

• Monitoring the freeways so that incidents can be rapidly detected and be effectively managed

• Providing travelers with real time traffic information to aid decision making in using alternative traffic routes

• Reduce the impact and occurrence of recurring congestion on the freeways and approaches

• Minimize the duration and effects of non-recurring congestion on the freeways and approaches

• Maximize the operational efficiency for the traveling public while using the freeways

• Provide a means of aiding motorists who have encountered problems (crashes breakdowns confusion etc.) while traveling on the freeways

• Facilitate the effective utilization of the freeways by transit and HOV vehicles

• Enhance the coordination between transportation and emergency response agencies on the island

Proposed Construction Phasing/Staging It is anticipated that the majority of the work for the CCTV cameras will occur within the existing shoulders and in the landscaped areas adjacent to the H-1 Freeway, H-3 Freeway, H-201 Freeway (Moanalua Freeway), and Pali Highway. During construction a combination of short-term and long-term lane closures will be required to support the necessary construction activities. Any necessary long-term lane closures will occur when the work requires more than the permitted 6 hours between the morning peak hour and evening peak hour traffic period (8:30 AM to 3:00 PM) or overnight (9:00 PM to 4:00 PM).

The fiber replacement and conduit installation along the Pali Highway, H-1 Freeway, H-3 Freeway, and H-201 Freeway installations will require the closure of the shoulder and the minor encroachment of a single travel lane. In addition, the work along these roads will involve installing cameras directly overhead. As such, short-term single lane closures along these freeways will need to occur concurrently to install the cameras. Some locations along the Pali Highway, H-3 Freeway, and H-201 Freeway installations will primarily be constructed outside of the travel way in adjacent grassed areas. In those situations, only shoulder closures will be required during non-peak period daytime working hours.

General Schedule and Timeline This Project is expected to take approximately 12 months to complete. The construction schedule can be found in Appendix B.

Related Project Information There are no known projects conflicting with this project.

Prepared for: HDOT

AECOM 5

5. Existing and Construction Conditions Existing Roadway Characteristics H-1 Freeway

The H-1 Freeway is an east-west, two-way, divided freeway. The project limits within H-1 Freeway will include the Kalihi Interchange between the Kalihi Street on-ramps and Houghtailing Street. The posted speed limit is 45 mph within the vicinity of the project.

H-3 Freeway (John A. Burns Freeway)

The H-3 Freeway is a north-south, two-way, divided freeway. The project limits within H-3 Freeway begin to the south near the H-1 Freeway westbound on-ramp from southbound H-3 Freeway and extend north to the interchange with Kamehameha Highway. Posted speed limits range from 45 to 60 mph within the vicinity of the project.

Pali Highway

The Pali Highway is a north-south, two-way, divided highway. The project limits within Pali Highway begin approximately 500 feet north of the Nu’uanu Pali Tunnels and extend south to about 0.3 miles north of the intersection with Waokanaka Street and Nu’uanu Pali Drive. This roadway serves as the main connection between Kailua to Honolulu. Posted speed limits range from 35 to 45 mph within the vicinity of the project.

H-201 Freeway (Moanalua Freeway)

The H-201 Freeway is an east-west, two-way, divided highway. The project limits within H-201 Freeway begin west near the westbound on-ramp from the H-1 Freeway and end east near the off-ramp to the northbound H-3 Freeway. Posted speed limit is 50 mph within the vicinity of the project.

Kahuapaani Street

Kahuapaani Street is a north-south, two-way, divided roadway. The project limits within Kahuapaani Street will include the eastbound on-ramp to the H-201 Freeway. Posted speed limit is 35 mph within the vicinity of the project.

Existing and Historical Traffic Data 24-hour ATR traffic count data was obtained from the online Traffic Data Map for the state of Hawaii provided by International Road Dynamics Inc. (www.hawaii-map.vi2m.irdinc.com) and not available for export.

Existing Traffic Operations Special use HOV lanes are implemented within the project limits as described below.

H-201 Freeway (Moanalua Freeway)

The median lane in the eastbound direction is designated as an HOV lane starting at the off-ramp to H-3 Freeway southbound and ending before the off-ramp to Puuloa Road. The eastbound median lane operates as an HOV from 6:00 AM to 8:00 AM on weekdays, excluding holidays.

Prepared for: HDOT

AECOM 6

Construction Conditions Traffic Predictions During Construction The twenty-four-hour traffic count data obtained at the traffic count stations closest to the project sites were plotted by 15-minute increments. To minimize the impacts to motorists, a criterion was developed to determine when traffic volumes would be favorable to implement lane closures.

Most of the roadways in this report are classified as freeways. The following freeways are included in this study:

• H-1 Freeway (Lunalilo Freeway)

• H-3 Freeway (John A. Burns Freeway)

• Pali Highway (Route 61)

• H-201 Freeway (Moanalua Freeway)

• Kalihi Street/ Likelike Highway (Route 63)

For this type of facility, and for highways that operate similarly to freeways, the assessment criteria described in the Highway Capacity Manual (HCM) under the temporary short-term work zones section were used. The typical lane capacity is assumed to be 1,400 passenger cars per lane per hour (pc/In/hr). The base value can be adjusted ±10% depending on the intensity of work activity, effects of heavy vehicles or the presence of ramps therefore, 1,300 pc/In/hr was used as a threshold guideline at freeways to determine the most favorable work hours at each project site.

For the remaining roadway classifications, the criteria in the 2007 State of Hawaii Department of Transportation, Highways Division (HDOT), Transportation Management Plan Guidelines and the Work Zone Safety and Mobility Process was used. The document defines a significant project for HDOT is one where the existing traffic volume exceeds 1,000 pc/In/hr during the normal working hours. Lane and shoulder closure recommendations are presented based on the available traffic data summarized in Appendix C.

CCTV Replacement Each CCTV site will require the removal of an existing camera and associated equipment, and the installation of a camera, associated power and communication conduits onto existing camera poles or street light poles. Please refer to Figure 1 for the CCTV location map. For a summary of the affected roadways and work hours see Table 1.

H-3 Freeway between H-1 Freeway interchange and Kamehameha Highway Interchange.

CCTV cameras will be replaced along both directions of the H-3 Freeway between the H-1 Freeway Interchange and the Kamehameha Highway Interchange.

Construction

Construction will take place during the day and will require a shoulder or lane closure along the H-3 Freeway. The most favorable work hours were determined to be on weekdays from 9:00 AM to 3:00 PM for the cameras to be replaced in the H-3 Traffic Operation Center (TOC), Maintenance Tunnels, and Maintenance and Operations (M+O) Buildings, and 8:30 AM to 3:00 PM for the remaining camera replacements along the H-3 Freeway.

Prepared for: HDOT

AECOM 7

CCTV Installation Each CCTV site will require the installation of a camera, associated power and communication conduits onto existing street light poles. Please refer to Figure 1 for the CCTV location map. For a summary of the affected roadways and work hours see Table 1.

Pali Highway between Waokanaka Street and Nu’uanu Pali Drive

This CCTV camera will be installed along the northbound direction on the Pali Highway between the intersection with Waokanaka Street and Nuuanu Pali Drive approximately 2,600 feet north of the intersection with Waokanaka Street.

Construction

Construction will take place during the day and may only require a single lane closure along the Pali Highway in the northbound direction. The most favorable work hours were determined to be on weekdays from 8:30 AM to 3:00 PM.

Pali Highway between Pali Lookout Exit and the Nu’uanu Pali Tunnels

This CCTV camera will be installed in the median landscaped area along the Pali Highway between the Pali Lookout Exit and the Nu’uanu Pali Tunnels approximately 275 feet north of the off-ramp.

Construction

Construction will take place during the day and will require a shoulder closure along the Pali Highway in the northbound direction. The most favorable work hours were determined to be on weekdays from 8:30 AM to 3:00 PM.

Pali Highway at Nu’uanu Pali Tunnel north entrance

This CCTV camera will be installed in the median landscaped area along the Pali Highway between the Nu’uanu Pali Tunnels and the scenic point along Pali Highway.

Construction

Construction will take place during the day and will require a shoulder closure along the Pali Highway in the northbound direction. The most favorable work hours were determined to be on weekdays from 8:30 AM to 3:00 PM.

H-3 Freeway between South Halawa Valley CCTV #4 and Halawa Valley CCTV #5

This CCTV camera will be installed along the northbound direction on the H-3 Freeway between the Halawa Interchange and the Tetsuo Harano Tunnels approximately 5,500 feet (1.04 miles) south of the tunnel.

Construction

Construction will take place during the day and will require a shoulder closure along the H-3 Freeway in the northbound direction. The most favorable work hours were determined to be on weekdays from 8:30 AM to 3:00 PM.

H-3 Freeway between Halawa Valley CCTV #5 and Halawa Approach CCTV #6

This CCTV camera will be installed along the northbound direction on the H-3 Freeway between the Halawa Interchange and the Tetsuo Harano Tunnels approximately 9,900 feet (1.88 miles) south of the tunnel.

Prepared for: HDOT

AECOM 8

Construction

Construction will take place during the day and will require a shoulder closure along the H-3 Freeway in the northbound direction. The most favorable work hours were determined to be on weekdays from 8:30 AM to 3:00 PM.

Prepared for: HDOT

AECOM 9

Table 1. CCTV Work Roadway Impacts

Location CCTV

Affected Road

Affected Direction

Lanes Open (no construction)

Lanes Open (with construction) Roadway

Impact Time Closure Duration Type of Work

H-201 at Kahuapani Street Interchange 71 H-201 EB 4 4 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

Pali Highway between

Waokanaka Street and Nu'uanu Pali

Tunnel

83 Pali Highway NB 3 2 One lane closure 8:30 AM to 3:00 PM 5 camera, power and communication

84 Pali Highway NB/SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

85 Pali Highway SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

H-3 Freeway between H-1

Freeway Interchange and Kamehameha

Highway

81 H-3 NB 2 1

Shoulder closure and/or one lane closure

8:30 AM to 3:00 PM camera, power and communication

82 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

72 H-3 ramp SB 1 1 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

70 H-3 ramp SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

1 H-3 ramp NB 1 1 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

2 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

3 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

4 H-3 NB/SB 2 1 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

5 H-3 NB 2 1

Shoulder closure and/or one lane closure

8:30 AM to 3:00 PM camera, power and communication

6 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

7 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

41 H-3 TOC - - - - 9:00 AM to 3:00 PM n/a camera, power and communication

Prepared for: HDOT

AECOM 10

74 H-3 TOC - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

56 H-3 TOC - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

56A H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

57 H-3 TOC - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

50 H-3 M+O - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

51 H-3 M+O - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

52 H-3 M+O - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

53 H-3 M+O - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

9 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

55 H-3 TOC - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

59 H-3 TOC - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

8 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

10 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

42 H-3 TOC - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

58 H-3 TOC - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

40 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

H-3 service building

- - - - 9:00 AM to 3:00 PM 3 camera, power and communication

61 H-3 Maint.

Tunnel - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

11 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

39 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power

Prepared for: HDOT

AECOM 11

38 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

62 H-3 Maint.

Tunnel - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

12 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

37 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

63 H-3 Maint.

Tunnel - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

13 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

14 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

64 H-3 Maint.

Tunnel - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

36 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

35 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

15 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

65 H-3 Maint.

Tunnel - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

16 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

66 H-3 Maint.

Tunnel - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

34 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

17 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

67 H-3 Maint.

Tunnel - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

33 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

18 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

68 H-3 Maint.

Tunnel - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

32 H-3 SB 2 2 Shoulder

Prepared for: HDOT

AECOM 12

31 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

69 H-3 Maint.

Tunnel - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

19 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

30 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

29 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

54 H-3 M+O - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

53 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

52 H-3 M+O - - - - 9:00 AM to 3:00 PM 3 camera, power and communication

51 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

50 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

28 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

27 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

26 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

25 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

24 H-3 SB 2 1 One lane closure 8:30 AM to 3:00 PM 5 camera, power and communication

23 H-3 SB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

73 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

22 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

21 H-3 NB 2 2 Shoulder closure 8:30 AM to 3:00 PM 5 camera, power and communication

20 H-3 SB 2 1 One lane

Prepared for: HDOT

AECOM 13

Fiber and Conduit Installation The conduit installation sites will require trenching, backfilling, and restoring back to existing conditions unless noted otherwise. Fiber installation for much of the project is within existing conduits which will not require additional conduit or trench installation. Please refer to Figure 1 for the conduit location. For a summary of the affected roadways and work hours, see Table 2.

H-1 Freeway between Kalihi Street Interchange and Houghtailing Street intersection

New conduits will be installed in the grass area between the Kalihi Street ramps of the westbound side of the H-1 Freeway. At that point, the conduit will cross over the westbound Likelike Off-ramp through existing LPR conduits, and connect to a new structure mounted pull box on the northwest corner of the Kalihi Street overpass. At the end of the wall, new conduit will be installed under the shoulder until it can be transitioned to the grass alongside Houghtailing Street. Fiber optic cables will then need to be pulled and terminated in the cabinets on either side of the new conduit.

Construction

Construction at Kalihi Interchange will require night work since the installation will cross over traffic within the interchange. The work will require the closure of the westbound shoulder and part of the off-ramp lane approximately 500 feet from the offramp gore and attenuators. From there the drop lane will also be closed to facilitate trench work. The most favorable work hours were determined to be on weekdays from 9:00 PM to 4:00 AM.

H-1 Freeway at Puowaina CCTV near Alapai Street pedestrian bridge.

Fiber optic cables will be pulled within existing conduits connecting the camera pole in the grass area along the H-1 Freeway eastbound on-ramp to the Honolulu Traffic Management Center.

Construction

Fiber optic cables will be pulled along the eastbound shoulder of the H-1 Freeway on-ramp and will require the closure of the shoulder only for access vehicle. The most favorable work hours were determined to be on weekdays from 9:30 AM to 3:00 PM.

H-3 Freeway between H-1 Freeway interchange and Kamehameha Highway Interchange.

Fiber optic cables will be pulled within existing conduits connecting the CCTV cameras and communication devices on the shoulder and in the grass median along both directions of the H-3 Freeway.

Construction

Fiber optic cables will be pulled along the entirety of the H-3 Freeway within project limits between all existing communication junction boxes. This work will require the closure of the shoulder. A single lane closure may be necessary in sections with a narrower shoulder. The most favorable work hours were determined to be on weekdays from 8:30 AM to 3:00 PM.

H-201 Freeway between H-1 Freeway interchange and H-3 Freeway Interchange.

Fiber optic cables will be pulled within existing conduits connecting the CCTV cameras and communication devices on the shoulder and in grass areas along eastbound H-201 Freeway (Moanalua Freeway).

Construction

Prepared for: HDOT

AECOM 14

Fiber optic cables will be pulled along the entirety of the H-3 Freeway within project limits in approximately 500- to 1000-foot-long sections and will require the closure of the shoulder. The most favorable work hours were determined to be on weekdays from 8:30 AM to 3:00 PM.

Incident and Crash Data

Crash analysis was not performed for this work because no long-term traffic control is required for proposed construction. Only short-term traffic control during off-peak periods is proposed.

Prepared for: HDOT

AECOM 15

Table 2. Fiber/Conduit Work Roadway Impacts

Location Affected Road

Affected Direction

Lanes Open (no construction)

Lanes Open (with construction)

Roadway Impact Time Work

Hours Type of Work

500-foot-long sections on H-3 Freeway between H-1

Freeway ramps and Kamehameha Highway interchange

H-3 NB/SB 2 1

Shoulder closure and/or one lane closure

8:30 AM to 3:00 PM 7.5 cable installation

500-foot-long sections on H-201 Freeway between H-1 Freeway interchange and H-3 freeway interchange

H-201 EB 3 2

Shoulder closure and/or one lane closure

8:30 AM to 3:00 PM 7.5 cable installation

H-1 Freeway at Alapai Street pedestrian bridge

H-1 EB

On-ramp EB 2 2 Shoulder closure 9:30 AM to 3:00 PM 5 cable installation

H-1 Freeway between Kalihi Interchange and

Houghtailing Street intersection

H-1 WB 5 4

Shoulder closure and/or one lane closure

9:00 PM to 4:00 AM 8 conduit installation

Prepared for: HDOT

AECOM 16

6. Work Zone Impact Assessment Report Work zone traffic control used for this project is specified in the Plans and referenced in Section 645 of the Special Provisions. Penalties to the Contractor for non-compliance are outlined in Section 108 of the Special Provisions.

Qualitative Summary of Anticipated Work Zone Impacts Should typical work zone traffic control occur during the commuter peak periods, significant delays to motorists would be anticipated. Therefore, traffic control will be implemented during the mid-day off peak periods or night to early morning periods prior to the AM peak period.

Impacts Assessment of Alternative Project Design and Management Strategies Typical work zone traffic control will occur during mid-day off-peak periods or nights to early morning periods prior to the AM peak period to minimize impacts to commuters; traffic control will generally be set up and dismantled in a single day as described in the Plans and Special Provisions.

Traffic Analysis Results The analysis is based on past experience and analysis of 24-hour traffic patterns against expected per-lane capacity from HCM. This methodology is selected because work zones will be limited to discreet portions of the project area at any given time, and work zones will not be active for longer periods than the following: The standard construction day work hours are 8:30 AM to 3:00 PM or 9:00 PM to 4:00 AM per Section 645, Section F. The day work hours were further adjusted to coincide when traffic volumes are lower.

7. Selected Work Zone Impacts Management Strategies

Temporary Traffic Control (TTC) Strategies Traffic control elements are described in the Plans and in Section 645 of the Special Provisions.

The closure schedule in the Traffic Predictions During Construction Section are meant for recurring travel patterns as it is recognized that fluctuations in traffic pattern will occur due to various non-recurring causes. The schedule in Tables 1 and 2 will be modified should congestion occur at the beginning or at the end of the time period in 1⁄2 hour increments.

Public Information

Prepared for: HDOT

AECOM 17

All public information will be handled by the Public Affairs Office, Construction Engineer (HWY- OC). Section 645 of the Standard Specifications outlines public information practices required for the project.

Transportation Operations Applicable Work Zone Safety Management Strategies will be implemented during construction, including use of advisory speed limits and traffic control devices in accordance with MUTCD guidelines and as indicated in the plans and Section 645 of the Special Provisions.

8. TMP Monitoring During Construction

Evaluation Report of Failures of TMP A request will be made of HWY-OC to implement and track the effectiveness of the TMP, for future use by other projects.

Appendix A:

Determination of a Significant Highway Project r10-3-07

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATON

HIGHWAYS DIVSION

DETERMINATION OF A SIGNIFICANT HIGHWAY PROJECT

Hawaii Department of Transportation Projects

Notes:

Is this project on one of the following roadway classifications? 1

National Highway System Interstate/Freeway/Expressway Urban or Rural Principle Arterial

O LEVEL 1: Not a significant project. Proceed to TMP Checklist

YES

Will the project have any of the following characteristics? A “yes” answers to any of the characteristics below is considered a YES response.

Mobility

Increase in delay (equal to or above 30 minutes4) or travel time (i.e.

traffic volumes that will exceed roadway capacity in the work zone) Substantial impact to alternative routes (overall delay equal to or above 30 minutes4)

Safety

High crash location(s) within the project limits5

Other Characteristics

High level of public interest Significant impact on public/private access (e.g., businesses, communities, park & ride lots, schools, fire stations, special events, seasonal traffic, etc.)

Conta-flowed lanes Full roadway closure Two-way one-lane operations Impact to environmental or historical features

Perform Maintenance of Traffic Alternatives Analysis (MOTAA) 6 to mitigate the “Characteristics” above.

Do the selected alternatives still have significant work zone safety and mobility impacts (see “characteristics” above)?

LEVEL 3: Significant Project. Proceed to TMP Checklist

YES

LEVEL 2: Not a significant project. However, may still require transportation operations and public information strategies. 2,3 Contact HWY-T and Public Affairs Office for assistance. Proceed to TMP Checklist

YES

Is the existing traffic volume of the roadway greater than 1,000-passenger cars/lane/hour (pc/ln/hr) during normal working hours?

NO

YES

Refer to C&C of Honolulu and Neighbor Island County Project Flow-chart.

Is this project an HDOT project?

NO

NO

YES

1. Roadway classification can be found on the Straight Line Diagram or contact HWY-P

2. Some projects may not fall under the Significant Project definition, but may still benefit from transportation operations and/or public information strategies. For example, projects that impact a moderated number of travelers with moderated public interest, such as single lane closures in urban areas or commercial business districts. The preparation of a TMP should be considered for these types of projects.

3. A project in the Interstate system that are within the boundaries of a designated Transportation Management Area (TMA) and occupies a location for more than three days with either intermittent or continuous lane closures will require the submittal of an exception request. Contact the Traffic Branch to determine if your project is within a TMA.

4. Reference CalTrans Transportation Management Plan Guidelines, June 11, 2001.

5. High crash locations are determined by requesting a crash analysis for the segment of roadway or intersection within the project limits. HWY-T should be contacted to perform the crash analysis.

6. The Maintenance of Traffic Alternatives Analysis (MOTAA) is intended to develop and evaluate the best combination of construction phasing/staging, project design options, temporary traffic control, transportation operations strategies, public information, and outreach strategies. The MOTAA should be conducted during analysis of detailed alternatives, before each final alternative is selected to proceed to design. Each alternative’s ability to conform to the Work Zone Mobility Process should be reviewed at this stage.

Guidance on performing a MOTAA can be obtained from the HDOT - Design Branch or the Traffic Branch.

aluke Rectangle aluke Rectangle aluke Rectangle aluke Oval aluke Oval aluke Oval aluke Rectangle aluke Polygonal Line aluke Polygonal Line aluke Polygonal Line palleyd Oval palleyd Oval palleyd Rectangle palleyd Rectangle palleyd PolyLine

Appendix B:

Construction Schedule

PROJECT: HDOT FMS PHASE 4

ISLAND OF OAHU

PROJECT NO. : FEDERAL AID PROJECT NO. NH-0300(176)R

WORKING DAYS

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340 345 350 355 360 365 370 375 380 385 390 395 400 405 410

H3 CCTV UPGRADE

MOBILIZATION 2 2 10 DAYS

SHOP DRAWING AND EQUIPMENT

PROCUREMENT

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 110 DAYS

REPLACE FIBER OPTIC

BACKBONE

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 185 DAYS

INSTALL CAMERAS 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 80 DAYS

INSTALL TOC EQUIPMENT 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 80 DAYS

TERMINATE AND TEST FIBER 5 5 5 5 5 5 5 5 40 DAYS

FIELD TEST CAMERAS 5 5 10 DAYS

PERFORM SYSTEM TESTING 5 5 5 5 20 DAYS

PERFORM 30-DAY SYSTEM

TESTING

5 5 5 5 5 5 30 DAYS

FINISH

PALI HWY

INSTALL E&S MEASURES 10 DAYS

SITE DEMOLITION 5 5 5 5 20 DAYS

INSTALL CONDUIT AND CABLE

INFRASTRUCTURE

5 5 5 5 5 5 5 5 5 5 5 5 60 DAYS

INSTALL ROADSIDE CABINET

EQUIPMENT AND SYSTEM

INTERFACE

5 5 5 5 5 5 5 5 40 DAYS

INSTALL CAMERAS 10 DAYS

TEST CAMERAS 5 DAYS

H1 FIBER INSTALLATION

INSTALL E&S MEASURES 5 DAYS

INSTALL CABLE AND CONDUIT

INFRASTRUCTURE

30 DAYS

SPLICE AND TEST FIBER OPTIC

CABLE

5 DAYS

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340 345 350 355 360 365 370 375 380 385 390 395 400 405 410

WORKING DAYS CONSTRUTION BAR CHART

6/5/2025

Appendix C:

Tra�ic Data Summary

0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00

A v e ra g e p c

/v e h /l n

Time of Day

H-3 Near Kaneohe Interchange

15-minute Interval pc/ln/hr Equivalents

Average NB pc/ln/hr Average SB pc/ln/hr 1300 veh/ln/hr

0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00

A v e ra g e p c

/v e h /l n

Time of Day

H-3 Near Halekou Interchange

NB pc/ln/hr SB pc/ln/hr 1300veh/ln/hr

-200

0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00

A v e ra g e p c

/v e h /l n

Time of Day

H-201 Near H-1

NB pc/ln/hr WB pc/ln/hr 1300veh/ln/hr

0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00

A v e ra g e p c

/v e h /l n

Time of Day

Pali Highway Near Tunnels

NB pc/ln/hr SB pc/ln/hr 1300veh/ln/hr

0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00

A v e ra g e p c

/v e h /l n

Time of Day

H-1 near Likelike Interchange

EB pc/ln/hr WB pc/ln/hr 1300veh/ln/hr

File details come from the government source that posted it. Updated .