FINAL ADDENDUM NO 1 NH 0300 176 R.pdf
PDF 1 MB Posted
- Attached to
- NH-0300(176)R Freeway Management System Phase 4
- Solicitation number
- B26003484
- Issued by
- Honolulu County, Hawaii
About this file
This is Addendum No. 1 issued by the State of Hawaii Department of Transportation Highways Division on July 21, 2026, for the Freeway Management System Phase 4 project (Federal-Aid Project No. NH-0300(176)R). The addendum amends the original solicitation for work across the Ewa, Honolulu, and Koolaupoko districts on Oahu, which encompasses replacement of 72 existing closed-circuit television (CCTV) cameras along the H-3 Freeway and within the Tetsuo Harano Tunnel, installation of two new CCTV cameras on the H-3 Freeway, corridor-wide fiber optic trunk communications cable installation and replacement, operator equipment upgrades at the Tetsuo Harano Tunnel traffic operations center, and installation of fiber optic cable and conduit between the Kalihi Interchange and Houghtailing Street on the H-1 Freeway. The non-mandatory pre-bid meeting was held on July 14, 2026, via Microsoft Teams, with bid opening scheduled for July 31, 2026 at 2:00 p.m. Hawaii Standard Time. Bidders were required to submit questions by July 16, 2026 at 2:00 p.m. HST, and Notice to Proceed is scheduled for December 2026.
Addendum No. 1 makes specific revisions to Section 683 (CCTV Camera) specifications and Plan Sheet No. 17 (ITS Key Plan), removing references to an additive alternate that does not exist in the proposal. Key clarifications address camera specifications, including Power over Ethernet (PoE+) powered cameras with specific technical requirements (1/2.9" Progressive Scan RGB CMOS image sensor, fixed iris and focus lenses with specifications for both 3.2 mm and 7.5 mm options, video compression supporting H.264 and H.265 standards), camera mount requirements (outdoor type with aluminum or stainless steel components), and clarification that the State will procure PoE+ switches rather than the contractor. The addendum confirms that funds were obligated in July 2025 and are not subject to recent Buy America legislation under blanket microprocessor exceptions, that Project Labor Agreements do not apply to this solicitation, and that Disadvantaged Business Enterprise (DBE) contract goals are not specified pending HDOT's DBE certification reevaluation. The estimated construction cost ranges between $6 million and $10 million, with work scheduled for approximately 12 months including daytime work (8:30 a.m. to 3:00 p.m. weekdays) and overnight work (9:00 p.m. to 4:00 a.m.).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FINAL SPECIFICATIONS w NTB NH 0300 176 R.pdf | ||
| FINAL TMP NH 0300 176 R.pdf | ||
| FINAL PLANS NH 0300 176 R.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FREEWAY MANAGEMENT SYSTEM ADDENDUM NO. 1
PHASE 4 JULY 21, 2026
PROJECT NO. NH-0300(176)R PAGE 1 OF 2
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
HIGHWAYS
ADDENDUM NO. 1
FOR
FREEWAY MANAGEMENT SYSTEM
PHASE 4
DISTRICTS OF EWA, HONOLULU, AND KOOLAUPOKO
ISLAND OF OAHU
FEDERAL AID PROJECT NO. NH-0300(176)R
July 21, 2026
This Addendum shall make the following amendment(s) to the Solicitation:
A. SPECIAL PROVISIONS
1. Delete SECTION 683 - CCTV CAMERA Page 683-3, dated 4/24/26 and replace with the attached SECTION 683 - CCTV CAMERA Page 683-3, dated r7/21/26.
B. PLANS
1. Delete PLANS SHEET NO. 17 ITS KEY PLAN and replace it with the attached
PLANS SHEET NO. ADD. 17 ITS KEY PLAN.
The following is provided for information.
C. PRE-BID MEETING MINUTES
1. The attached PRE-BID MEETING MINUTES are provided for information.
D. RESPONSES TO REQUESTS FOR INFORMATION (RFI’S/QUESTIONS)
1. The attached RESPONSES TO REQUESTS FOR INFORMATION are provided for information.
FREEWAY MANAGEMENT SYSTEM ADDENDUM NO. 1
PHASE 4 JULY 21, 2026
PROJECT NO. NH-0300(176)R PAGE 2 OF 2
Please acknowledge receipt of this ADDENDUM NO. 1 by recording the date of its receipt in the space provided on the PAGE P-4 of the Proposal.
MUNG FA (MEL) CHUNG
Engineering Program Manager Traffic Branch https://stateofhawaii.na1.adobesign.com/verifier?tx=CBJCHBCAABAAj4Cb-Fu25Mo1CIo5aIvvSIDEO8vVxyW0
NH-0300(176)R Addendum No. 1
683-3 r7/21/26
(a) Camera to be PoE+ powered: 1-port: 100-240 VAC, 89
Max 37 W IEEE 802.3at Type 2 Class 4. Typical 90
Camera consumption 10.2 W., max 25W. The State 91 will provide to the Contractor a PoE+ switch that meets 92 the applicable power and cable length requirements. 93
(6) Camera Mounts. 95
(a) Camera: Wall mounts and adaptors per manufacturers 97 recommendations: 98
1. Outdoor type 99
2. Aluminum or stainless steel components 100
3. Mount cantilever style on pole shafts using straps 101
4. Has cable pull throughs supporting up to 100 lbs. 102
5. Painted white and have the ability to adjust 103 camera to plumb 104
(B) CCTV Camera Assembly (Fixed). 106
(1) Camera. 108
(a) Image Sensor: 1/2.9” Progressive Scan RGB CMOS 110
(b) Lens: Fixed Iris, fixed focus 111
1. 3.2 mm F1.4 112
(i) Horizontal field of view: 101° 113
(ii) Vertical field of view: 54° 114
(iii) Maximum focus distance 1.2 m 115
2. 7.5 mm F1.6 116
(i) Horizontal field of view: 39° 117
(ii) Vertical field of view: 22° 118
(iii) minimum focus distance 3 m 119
(c) Automatically removable infrared-cut filter 120
(d) Frame Rate: Up to 25/30 fps (50/60 Hz) 121
(e) Shutter Speed Range – 1/19000 s to 1/5 s 122
(f) Dimensions: Length 6.7 in. Dia 4.0 in. 123
(g) Weight: 1.1 lbs. 124
(h) Connectors: RJ45 10Base-T/100Base-TX PoE 125
(2) Video. 127
(a) Video Compression: 129
1. H.264 (MPEG)-4 Part 10/AVC) Baseline, Main 130 and High Profiles 131
2. H.265 (MPEG-H Part 2/HEVC) Main Profile 132
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
HIGHWAYS DIVISION
SHEETS
TOTALFED. ROAD SHEET
NO.
FISCAL
YEARDIST. NO. STATE
HAW.OAHU
SHEET No. OF SHEETS
NH-0300(176)R
FEDERAL AID
PROJECT NUMBER
2026 111
G-13
17ADD.
AutoCAD SHX Text fh
AutoCAD SHX Text fh
AutoCAD SHX Text fh
AutoCAD SHX Text t
AutoCAD SHX Text t
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text fh
AutoCAD SHX Text smh
AutoCAD SHX Text wm's
AutoCAD SHX Text wmh
AutoCAD SHX Text wm
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WMH
AutoCAD SHX Text
WV
AutoCAD SHX Text
SMH
AutoCAD SHX Text
SMH
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WMH
AutoCAD SHX Text
WMH
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
TMH
AutoCAD SHX Text
LPB
AutoCAD SHX Text Halona Pl.
AutoCAD SHX Text Makalapua Pl.
AutoCAD SHX Text Halona St.
AutoCAD SHX Text Olomea St.
AutoCAD SHX Text Houghtailing St.
AutoCAD SHX Text Houghtailing St.
AutoCAD SHX Text Ramp K-3
AutoCAD SHX Text Beckley St.
AutoCAD SHX Text Kalihi St.
AutoCAD SHX Text Ramp K-3
AutoCAD SHX Text Kalihi St.
AutoCAD SHX Text Westbound Kalihi Street On-Ramp (Ramp K-1)
AutoCAD SHX Text Eastbound Kalihi Street On-Ramp (Ramp K-2)
AutoCAD SHX Text Eastbound Kalihi Street On-Ramp (Ramp K-6)
AutoCAD SHX Text Westbound Likelike Off-Ramp (Ramp K-5)
AutoCAD SHX Text Eastbound Likelike Highway Off-Ramp (Ramp K-4)
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text smh
AutoCAD SHX Text wmh
AutoCAD SHX Text d36"
AutoCAD SHX Text d24"
AutoCAD SHX Text D24"
AutoCAD SHX Text d30"
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text smh
AutoCAD SHX Text wmh
AutoCAD SHX Text smh
AutoCAD SHX Text smh
AutoCAD SHX Text wmh
AutoCAD SHX Text dmh
AutoCAD SHX Text smh
AutoCAD SHX Text wmh
AutoCAD SHX Text wmh
AutoCAD SHX Text smh
AutoCAD SHX Text smh
AutoCAD SHX Text smh
AutoCAD SHX Text smh
AutoCAD SHX Text d30"
AutoCAD SHX Text d30"
AutoCAD SHX Text d24"
AutoCAD SHX Text d42"
AutoCAD SHX Text d42"
AutoCAD SHX Text d24"
AutoCAD SHX Text d24"
AutoCAD SHX Text d24"
AutoCAD SHX Text d24"
AutoCAD SHX Text d42"
AutoCAD SHX Text d42"
AutoCAD SHX Text d24"
AutoCAD SHX Text d24"
AutoCAD SHX Text d24"
AutoCAD SHX Text d36"
AutoCAD SHX Text d24"
AutoCAD SHX Text d24"
AutoCAD SHX Text d24"
AutoCAD SHX Text d18"
AutoCAD SHX Text d24"
AutoCAD SHX Text d36"
AutoCAD SHX Text d24"
AutoCAD SHX Text d36"
AutoCAD SHX Text d24"
AutoCAD SHX Text d42"
AutoCAD SHX Text sdmh
AutoCAD SHX Text sc
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text wmh
AutoCAD SHX Text fh
AutoCAD SHX Text d42"
AutoCAD SHX Text cb
AutoCAD SHX Text SMH's
AutoCAD SHX Text Alapai St.
AutoCAD SHX Text Kinalau Place
AutoCAD SHX Text Vineyard Blvd. On-Ramp
AutoCAD SHX Text Vineyard Blvd. Off-Ramp
AutoCAD SHX Text Kinau St.
AutoCAD SHX Text Ward Avenue
AutoCAD SHX Text Lunalilo St.
AutoCAD SHX Text Emerson St.
AutoCAD SHX Text Capt. Cook Ave.
AutoCAD SHX Text Kinau St. Off-Ramp
AutoCAD SHX Text C:\Users\PalleyD\OneDrive - AECOM\Hawaii and HDOT\HDOT FMS Ph4 ITS\CAD working\Export Holding For PW\ITS_INDEX_05.dwg
AutoCAD SHX Text
2026-07-21 2:27 PM
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text A.
AutoCAD SHX Text S.
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text U.
AutoCAD SHX Text I, AutoCAD SHX Text
LICENSED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
NO. 19951
AutoCAD SHX Text P
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text %%UFreeway Management System, Phase 4
AutoCAD SHX Text Date: April 2026
AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NOTE BOOK
AutoCAD SHX Text No.
AutoCAD SHX Text
SURVEY PLOTTED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
TRACED BY
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
QUANTITIES BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OR UNDER MY SUPERVISION.
AutoCAD SHX Text
THIS WORK WAS PREPARED BY ME
AutoCAD SHX Text
EXPIRATION DATE
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
OF LICENSE
AutoCAD SHX Text 4/20/2028
AutoCAD SHX Text %%UFederal Aid Project No. NH-0300(176)R
AutoCAD SHX Text E
AutoCAD SHX Text Y
AutoCAD SHX Text Scale: As Indicated
AutoCAD SHX Text 500'
AutoCAD SHX Text
AutoCAD SHX Text 500'
AutoCAD SHX Text C-50
AutoCAD SHX Text C-49
AutoCAD SHX Text C-48
AutoCAD SHX Text Kalihi St.
AutoCAD SHX Text H-1
AutoCAD SHX Text H-1 Freeway
AutoCAD SHX Text ITS KEY PLAN (5 OF 5) Scale: 1" = 500'
AutoCAD SHX Text
ITS KEY PLAN
AutoCAD SHX Text
AutoCAD SHX Text Breakline H-1 STA 72+00 Toward Puowaina
AutoCAD SHX Text Breakline H-1 STA 39+00 Toward Middle St.
AutoCAD SHX Text To Salt Lake
AutoCAD SHX Text To Puowaina
AutoCAD SHX Text Breakline H-1 STA 178+00 Toward Kalihi
AutoCAD SHX Text C-51
AutoCAD SHX Text H-1 Freeway
AutoCAD SHX Text To Kalihi
AutoCAD SHX Text To Waialae
AutoCAD SHX Text Breakline H-1 STA 187+00 Toward Waialae
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text Boring Location
AutoCAD SHX Text Proposed Ground Disturbing Work
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Removed notes for Additive Alternate #1
AutoCAD SHX Text Date
AutoCAD SHX Text Revision
AutoCAD SHX Text 7/21/26
- 1 -
PRE-BID MEETING MINUTES
Project: Freeway Management System, Phase 4
Fed Aid Project No. NH-0300(176)R Solicitation No. B26003484
Subject: Non-mandatory Pre-Offer Conference
Date/Time: July 14, 2026 / 11:00 AM – 12:00 PM
Held: Via Microsoft Teams (Invites were sent to all interested bidders that submitted a request by phone or email)
Invites: Neal Honma / Devin Perry, Hawaii Department of Transportation (HDOT–Traffic
Branch) Dan Williams / Robert Hopper (HDOT - Office of Civil Rights) Gerald Pang / Kent Miyashiro (HDOT – Oahu District)
Jamie Hikiji / Steven Schillero / David Palley (AECOM) Keane Lapez / Norman Santos / Randal Cabalse (Henkels & McCoy West)
Skye Virtudes (Local 3 Operating Engineers) Neal Adachi (Pauls Electrical)
Discussed:
A. Neal Honma opens meeting at 11:05 A.M.
1. Pre-bid meeting is non-mandatory and is intended for clarification prior to bidding.
2. Any discrepancies will be addressed by addendum.
3. The minutes to this meeting will be distributed prior to bid opening.
4. Bidders have until THURSDAY, July 16, 2026, at 2:00 P.M. to submit any questions.
5. Bid opening is scheduled for 2:00 P.M., July 31, 2026.
6. To be eligible for award, bidders must complete all unit prices and amounts in the Proposal Schedule.
7. Robert Hopper (Office of Civil Rights) discussed Disadvantaged Business Enterprises (DBE) program. See attached.
B. Open discussion to prospective bidders.
1. Question: Why is there a plan sheet with “additive alternate?”
Response: There are no additive alternatives. Addendum will address this.
2. Question: Can bid be submitted early?
Response: Yes.
- 2 -
3. Question: When will addendum be issued?
Response: Addendum scheduled to be issued on 7/21/26.
4. Question: When will NTP be given?
Response: Requested to submit question in HIePRO so question can be formally addressed in the addendum.
Meeting Adjourned at 11:15 A.M.
Prepared by: Neal Honma
State of Hawaii, Dept. of Transportation – Administration Division (HDOT OCR)
Disadvantaged Business Enterprises (DBE) Program
Pre – Bid Meeting – 07/14/2026
NH-0300(176)R
Policy of the State of Hawaii, Department of Transportation’s (HDOT) DBE Program:
Bidders/offerors, subcontractors, consultants, vendors, suppliers, distributors, manufacturers, trucking companies, service providers, etc. shall fully inform themselves with respect to the requirements of the DBE Regulations.
The HDOT DBE program will operate in a nondiscriminatory manner and without regard to race or sex, while maximizing efficiency of service.
HDOT’s Disadvantaged Business Enterprise (DBE) Program remains in effect pursuant to 49
CFR Parts 23 and 26. However, consistent with the U.S. Department of Transportation Interim
Final Rule effective October 3, 2025, HDOT has suspended race-conscious measures including
DBE contract goals, counting of DBE participation, and associated special provisions, pending the completion of HDOT’s DBE certification reevaluation. Where indicated, HDOT reserves the right to reinstate or amend DBE special provisions at a later date, subject to approval by the appropriate USDOT operating administration.
DBE Goal for this project: NONE SPECIFIED
Support Hawaiʻi Small Business
Please continue to consider using small business subcontractors, suppliers, manufacturers, trucking companies, distributors, service providers, etc., when qualified
Small Business Directory: https://hands.ehawaii.gov/hands/smallbusiness/search
HDOT SBE Directory: https://hdot.gob2g.com/
BIDDER REGISTRATION
After the solicitation is closed, HDOT’s Office of Civil Rights will be reaching out to all bidders individually, requesting that they fill out a bidder registration form.
Registered bidders/offerors are posted at: https://hidot.hawaii.gov/administration/ocr/dbe/ https://hands.ehawaii.gov/hands/smallbusiness/search https://hdot.gob2g.com/
Questions for solicitation: B26003484 NH-0300(176)R Freeway Management System Phase 4
07/16/2026
1. Plan sheet G-13 shows limits of Additive Alternate 1. Proposal does not include a separate Additive Alternate. Please clarify.
Plan Sheet G-13 is updated with Addendum 1 to remove references to Additive Alternate 1.
2. Please confirm that both the PTZ and Fixed Cameras covered by Section 683.02 must be BABA and Buy America compliant.
The funds were obligated in July 2025 and are not subject to the legislation in question under blanket microprocessor exceptions.
3. We have located the specific cameras referenced by Spec Section 683.02 and they are not advertised as being BABA or Buy America compliant. Has DOT obtained a waiver from FHWA for the cameras?
The funds were obligated in July 2025 and are not subject to the legislation in question under blanket microprocessor exceptions.
4. Spec Section 683.02 states Contractor shall provide a POE+ switch to provide power to cameras. Spec Section 687.02(A) says State will provide switches. Do we provide and additional POE+ capable switch or can we provide a POE+ injector?
Spec Section 683.02(A)(5)(a) is updated with Addendum 1 to clarify that POE+ Switches will be procured by the State.
5. Will this solicitation have to abide by Administrative Directive No. 24-01 regarding PLA (Project Labor Agreements)?
PLA does not apply to this solicitation.
6. When will Notice to Proceed (NTP) be given?
NTP is scheduled for December 2026.