This document is a limited source justification for a replacement emergency power generator at a USDA Agricultural Research Service facility. The existing 400KW diesel generator was condemned due to a failure causing oil and water to mix in the engine block. A new 500KW generator from Generac Power Systems is needed due to compatibility requirements with the existing automatic transfer switch and annunciator controls to avoid integration issues. Market research found that procuring the same brand ensures effective connection to existing control systems without additional work or parts. The estimated price for the replacement Generac generator is $132,000. The solicitation for the replacement generator opportunity is numbered 12405B23Q0465.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Connect Generator-ATS Design.pdf | ||
| Generator ATS Information (Run Hrs).pdf | ||
| Service Provisions 1106524.docx | DOCX document | |
| SOW 400KW Generator USHRL Ft Pierce FL.pdf | ||
| Wage Rates.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Limited Source/Brand Name Justification
FAR 13.106-1(b)(1) – Simplified Acquisitions Control No. (if applicable) ______________________
Tailor this justification for the specific requirement, as applicable. The final product should not include any of the blue text, which is only included to guide the document preparation.
1. Identification of the agency and the contracting activity.
USDA, ARS, HRL
2. Description of supply or service required to meet the agency’s needs.
Replace 400KW 700 Ampere diesel engine driven emergency power generator to 500KW 800 Ampe
3. The rationale or circumstances for limiting competition.
The existing Generac 400KW generator was condemned due to oil and water mixed inside the engine block. Due to the critical nature of these systems, a single source of responsibility needs to exist with the manufacturer. Compatibility is the critical factor with the new unit and communication with the Automatic Transfer Switch and annunciator controls. Different manufacturers can lead to problems when an issue with the performance of the system as a whole. Technical characteristics requested item are essential to our needs especially due to the number of power outages experienced during extreme weather events (hurricanes) and unscheduled power outage in our location.
4. A description of the market research conducted and the results or a statement of the reason market research was not conducted.
Discussions with the locations technical representative who is the facility manager, and discussions with one of the engineers regarding the interconnections with the difficulties of different products to a control system. It becomes highly likely that additional work and/or parts would need to be done or purchased.
This would create higher costs that will be avoided by procuring the same brand name that is already known to connect effectively.
5. Estimated price, including all options, if applicable.
$132,000.00
6. Recommended source(s).
Generac Power System 545 W29290 State Road 59 Waukesha, WI 53187-0008 GSA Contract: GS-07F-0407X
DUNS: 006103055
UEI: DP7KERAZ7LY3
CAGE: 3KDJ8
POC: Lynn S. Jones, Account Manager II – Government Sales, Lynn.Jones@generac.com Tel: (920) 230-1280 Fax: (920) 230-1201
Certifications
Supporting data that is the responsibility of technical or requirements personnel and which form the basis for this justification are accurate and complete to the best of my knowledge.
Victor Agahan Facility Manager
The information contained in this justification is accurate and complete to the best of my knowledge and belief and in accordance with Federal Acquisition Regulation 13.106-1(b)(1), I hereby determine the circumstances described above deem only one source, or limited sources, reasonably available and competition is precluded for the reasons indicated in this document.
Lynn Hults Contracting Officer
| 2023-07-19T07:05:38-0400 | |