4. AF Form 3052 Contractor Proposal Form.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Airfield Pavement Striping Federal contract opportunity
Solicitation number
FA9401-12-R-0017
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 4

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Pavement Striping, newest first.
File Type Posted
FA9401-12-R-0017 Amendment 2.pdf PDF
Response to Bidder Questions Airfield Pavement Striping.pdf PDF
Site Visit Sign in Sheet.pdf PDF
Amendment 1 to Solicitation.pdf PDF
10. Wage Determination NM120047 NM47.pdf PDF
8. AF_3000.pdf PDF
12. Past Performance Information Form.pdf PDF
7. Permit Requirement Memorandum.pdf PDF
6. AF 3065 Progress Report.pdf PDF
11. KAFB Map for Site Visit Location —
2. Drawing 100068C1.pdf PDF
FA9401-12-R-0017.pdf PDF
9. Construction AF Form 66 - Airfield Striping.pdf PDF
3. Airfield Striping Specs.pdf PDF
1. Statement of Work-MHMV100068.pdf PDF
5. AF 3064-Progress Schedule.xls XLS spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

INSTRUCTIONS FOR COMPLETING AF FORM 3052

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square
feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be
funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.

FOR OFFICIAL USE ONLY

TOTAL MATERIAL COSTS $ 0.00

TOTAL LABOR COSTS $ 0.00

TOTAL OTHER DIRECT COSTS $ 0.00

TOTAL DIRECT COSTS $ 0.00

OVERHEAD % $ 0.00

PROFIT % $ 0.00

NMGRT 6.0625 % $ 0.00

TOTAL PRICE $ 0.00

DATE : FIRM NAME :

TITLE :BY :
(Signature)

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3-807.4)
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection
with any negotiations prior to contract award.

(Reverse of AF Form 3052., AUG 93)

RECAP

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.1OF1
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANHOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)

RECAPITULATION

1MobilizationLS
2Traffic ControlLS
3Traffic ControlLS
4StripingLF
5
6
7
8
9
10
11
12
13
14
15
16
17
18TOTAL$0.00$0.00$0.00$0.00
(AF Form 3052., AUG 93)

File details come from the government source that posted it. Updated .