Questions and Answers 1 (Demountable Walls).docx
DOCX document 22 KB Posted
- Attached to
- Demountable Walls - UPDATED 20 APR 2022
- Solicitation number
- FA9302-22-Q-0019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis-Solicitation_Demountable Walls_Updated 20 Apr 2022.docx | DOCX document | |
| SCA Wage Determination-LA County 2015-5613.txt | TXT text file | |
| Combined Synopsis-Solicitation_Demountable Walls.pdf | ||
| Solicitation - FA930222Q0019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Demountable Walls
FA9302-22-Q-0019
Questions and Answers
Question 1: What level of sound (STC) will the demountable walls in the conference room need?
Answer: No sound rating required.
Question 2: What material finish and color are you looking for the demountable walls?
Answer: Neutral
Question 3: A time extension for delivery of panels needs to be granted due to availability of supply.
Answer: This is fine. If we can have an estimated delivery date on a quote, the information will be on the contract.
Question 4: Can you share photos of the cubicles/area that need to be dissembled? Are these cubicles in a second floor?
Answer: A photographer will need to take these pictures if needed. Building 1820E is on the second floor, which there are four cubicles needing disassembled.
Question 5: Are you implying that the dissemble cubicles in item three of page 3 of the solicitation will be mounted/assemble per item 1 or do we need to bring new demountable walls to building 1819E-F?
Answer: The contractor will bring and install new demountable walls and remove the existing system furniture, which are in the way.
Question 6: If the cubicles on the item three page 3 needs to be relocated to another office can you give us distance between offices and will the cubicles need to be assemble in the office/warehouse that the materials need to be relocated to?
Answer: The system furniture removed will be stored in one of our connexs behind building 1830A.
Question 7: Do you have a manufacture in mind for these demountable walls?
Answer: We do not have a particular manufacturer in mind.