Site Visit Slides
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Memo_Questions_Answers_Listing2.pdf | ||
| Memo_Questions_Answers_Listing.pdf | ||
| FA9301-15-R-0003-0001_Bollards_Barriers_Amendment.pdf | ||
| Attachment-1_PWS_22DEC15.pdf | ||
| Memo_Preproposal_Site_Vist.pdf | ||
| Memo_Questions_Answers.pdf | ||
| FA9301-15-R-0003_Bollards_Barriers_Solicitation.pdf | ||
| Attachment-7_DFARS_252-209-7991.pdf | ||
| Attachment-4_essential_services.pdf | ||
| Attachment-3_WD_05-2047_Rev-17.pdf | ||
| Attachment-6_PPQ.pdf | ||
| Attachment-1_PWS.pdf | ||
| Attachment-5_PPIF.pdf | ||
| Attachment-2_WD_05-2043_Rev-19.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Air Force Test Center
Integrity - Service - Excellence
Site Visit Bollards and Barriers Maintenance Services
FA9301-15-R-0003
Presenter:
Matt Bawden
16 December 2015 War-Winning Capabilities … On Time, On Cost
AFTC
Requirements Overview Contracting Overview Business Information Technical Information Q&A session Hold ALL questions until Q&A session Please note not all questions can be answered today Agenda
Restrooms Exits Slides will be posted on www.fedbizopps.gov Administrative
Partner with Industry Fair, Open, Communications Complete Understanding of Source Selection Process Enhance Competition Facilitate Quality Proposals Purpose
Will Respond to Questions During Conference Question Forms Provided One Question Per Sheet Formal Answers Will be Posted on FedBizOpps Question Forms Submit to Contracting Personnel Submit Questions by 1600, December 18, 2015 Formal Question Submission
Contracting Officer Aimee Amador, AFTC/PZIOB Contract Administrator Matt Bawden, AFTC/PZIOB Edwards Project Manager Karen Bradshaw, 412 CE/CEOES Plant 42 Project Manager Eddie McCown, 412 TW/OL Acquisition Team
Provide all necessary resources to inspect, maintain, and repair GRAB Barrier and Delta Bollard systems across Edwards AFB and Plant 42 Monthly Preventive Maintenance based on Contractor submitted PMI Plan Routine Service Calls to perform maintenance or repairs not classified as emergency Emergency Service Calls to perform maintenance and repairs to correct dangers or restore essential services
Requirement Overview
Trip charges serve as the minimum payment for work requests not performed in conjunction with scheduled monthly preventive maintenance Over and Above allows negotiation of parts and labor for repairs not identified in the PMI plan Minor parts costing $100 or less are absorbed by the Contractor Requirement Overview Cont.
Competitive Procedures 100% set-aside for small business Contract Type Single Award, Firm-Fixed-Price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ) Period of Performance Five Years, plus the Option to Extend Services for a total of 6 months Evaluation Method Performance Price Trade-off (PPT) with a Technical Pass/Fail where performance is approximately equal to price when being evaluated Important Solicitation Details
Proposals will include three volumes Price Technical Past Performance See 52.212-1 – Instructions to Offerors for specific proposal preparation instructions See 52.212-2 – Evaluation--Commercial Items for specific evaluation criteria
Proposal Preparation
Unit prices are entered on the 1449 Solicitation Schedule for each CLIN except Over and Above, which is a predetermined estimate to be negotiated as needed throughout performance Total price equals unit prices times quantity and includes predetermined Over and Above estimates and the six-month option prices Six-month option unit prices will be the same as the final FY CLIN unit prices Six-month option quantities will be half of the last contract year quantities for evaluation purposes
Price Proposal
All services under the contract have been deemed mission essential In the event of a crisis, services will not be interrupted The Technical Proposal is the offeror’s Mission Essential Services Plan Plan must meet minimum requirements detailed in 52.212-2, 252.237-7024, and 252.237-7023 Technical Proposal rated on a pass/fail basis
Technical Proposal
Offerors submit up to three Past Performance Information Forms (PPIF) detailing recent or current contracts most relevant in demonstrating ability Offerors must also submit up to three PPIFs for all subcontractors, teaming partners, and/or joint venture partners and thoroughly explain the relationship of each partner Include copies of teaming and/or joint venture agreements Include Subcontractor Consents if applicable
Past Performance Info
Offeror sends Past Performance Questionnaires (PPQ) to contract POC’s and is responsible for tracking the ultimate delivery of the PPQ to the AFTC/PZIOB CO and CS Each PPQ must correspond to a PPIF submitted with the offeror’s proposal Past Performance Info Cont.
Simplified Acquisition Procedures are being utilized and basis for award will be in accordance with FAR 13.106-3 A PPT approach utilizing a technical pass/fail will be used for evaluation of proposals Offerors will be ranked in order of lowest price
Basis of Award
If the lowest priced evaluated technically acceptable offeror is judged to have a “Substantial Confidence” performance confidence assessment rating, that offer represents the best value for the government and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers.
If the lowest priced evaluated technically acceptable offeror is not judged to have a “Substantial Confidence” performance confidence assessment rating, the next lowest priced offeror will be evaluated and the process will continue (in order by price) until an offeror is judged to have a “Substantial Confidence” performance assessment or until all offerors are evaluated. The Source Selection Authority shall then make an integrated assessment best value award decision.
Basis of Award Cont.
Last day to submit questions 18 Dec 15 by 1600 Responses to questions posted 22 Dec 15 by 1600
| Proposals Due | 12 Jan 16 by 1600 | |
| Evaluations Complete | 10 Feb 16 | |
| Contract Award | 18 Feb 16 |
Estimated Milestones
| LOCATION | ||||
| MFR | MAKE | MODEL | QUANTITY | |
| West Gate | GRAB | GRAB | 300 | 1 |
| South Gate | GRAB | GRAB | 300 | 1 |
| North Gate | GRAB | GRAB | 300 | 1 |
| Bldg 1 (note 1) | Delta | Delta | DSC800(M) | 10 |
| Bldg 1220 | Delta | Delta | TT210(M) | 12 |
| Bldg 2750 (note 2) | Delta | Delta | DSC800(M) | 12 |
EAFB Bollards and Barriers
| LOCATION | MFR | MAKE | MODEL | QUANTITY |
| ECP85 | GRAB | GRAB | 300 | 1 |
| ECP87 | Delta | Delta | TT210(M) | 6 |
AF42 Bollards and Barriers
AFP42 Pictures
Image Redacted
Previous Contract:
FA9301-11-D-0014, Similar Requirements Loss Prevention Systems, Inc.
$322,552.00 Est Past Performance Questionnaires (PPQ):
Must send out the PPQ attached to our solicitation to all Points of Contact (POCs) identified in each Past Performance Information Form (PPIF); Contract Administrator (CA), Contracting Officer (CO), and Project Manager (PM) The Past Performance Evaluation Team will make their best effort to contact the POCs listed on your PPIF if your company’s past performance is evaluated and there is a missing PPQ
Frequently Asked Questions
Monthly/Annual preventive maintenance CLINs include 12 months per year for monthly preventive maintenance Appendix A Workload Data includes 12 monthly inspections and 1 yearly inspection Once a year, the annual minimum PMI inspection/MX check list items are completed in addition to the monthly PMI checklist items
Frequently Asked Questions
Q&As image4.png image5.png image1.wmf image2.png image3.jpeg