13437-12-005A_Repair_HVAC_ABC_Control_Rms_MTL_Spec-Dwgs.pdf

PDF 10 MB Posted

Attached to
HVAC for Control Rooms
Solicitation number
FA9101-15-R-0046
Issued by

About this file

Attachment 1 2 CLIN 1

View the file

Other files

File Type Posted
Brand_Name_redacted_J A.pdf PDF
Redacted_J A.pdf PDF
Mod_1.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Section_L.pdf PDF
Wage_Determination.pdf PDF
13776-15-013_Rpl_HVAC_Ctrl_Rm_ETF-C_Bldg_929_Spec-Dwgs.pdf PDF
Solicitation_wo_ATCH.pdf PDF
SECTION_M.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

13437-12-005A NOT SENSITIVE

ANZY059034

SPEC NO. 13437-12-005A

30 April 2015

CONSTRUCTION SPECIFICATION

TO

REPAIR HVAC A, B, & C CONTROL ROOMS MT&L

ARNOLD ENGINEERING DEVELOPMENT CENTER

ARNOLD AIR FORCE BASE, TENNESSEE 37389-9998

NOT SENSITIVE

ANZY059034 INDEX-1

INDEX

DIVISION 01 GENERAL REQUIREMENTS

01 10 00 Summary 01 33 00 Submittal Procedures 01 45 00 Regulatory Requirements 01 73 29 Cutting and Patching 01 74 19 Construction Waste Management and Disposal

DIVISION 02 EXISTING CONDITIONS

02 08 00 Asbestos Removal 02 08 50 Lead Removal 02 41 19 Selective Structural/Mechanical Demolition

DIVISIONS 03-04 NOT USED

DIVISION 05 METALS

05 05 00 Metal Fastening 05 50 00 Metal Fabrications

DIVISION 06 NOT USED

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 21 16 Blanket Insulation

DIVISION 08 NOT USED

DIVISION 09 FINISHES

09 51 23 Acoustical Tile Ceilings 09 90 00 Painting and Coating

DIVISION 10-22 NOT USED

DIVISION 23 HEATING, VENTILATING, AND AIR-CONDITION (HVAC)

23 05 29 Hangers and Supports for HVAC Piping and Equipment 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 00 HVAC Insulation 23 07 50 Piping Insulation 23 09 00 Instrumentation and Control for HVAC

ANZY059034 INDEX-2

23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping 23 21 16 Hydronic Piping Specialties 23 31 00 HVAC Ducts and Casings 23 33 00 Air Duct Accessories 23 34 00 HVAC Fans 23 37 00 Air Outlets and Inlets 23 73 00 Indoor Central-Station Air-Handling Units

DIVISIONS 24-25 NOT USED

DIVISION 26 ELECTRICAL

26 05 03 Equipment Wiring Connections 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Equipment 26 05 33 Raceways and Boxes for Electrical Equipment 26 05 53 Identification for Electrical Systems 26 27 26 Wiring Devices 26 28 13 Fuses 26 28 19 Enclosed Switches 26 51 00 Interior Lighting 26 52 00 Emergency Lighting

DIVISION 27 NOT USED

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

28 31 00 Fire Detection and Alarm

DIVISIONS 29-49 NOT USED

ANZY059034 01 10 00-1

SECTION 01 10 00

SUMMARY

PART 1 GENERAL

1.1 The work consists of providing all materials, equipment, and labor to demolish and replace the HVAC system, associated piping, ductwork, ceiling, interior finishes, lights, and controls to three control rooms and modifications to the fire detection system in Building 676. All work is to be done at Arnold Engineering Development Center, Arnold Air Force Base, Tennessee. The extent of the work is contained in the drawings and specifications. Major items of work include, but are not limited to, the following:

A. Removal of 3 package heat pump units, piping, ductwork electrical connections, and ceilings.

B. Installation of 3 chilled water air handling units, piping, ductwork, insulation, supports, controls and electrical connections.

C. Cutting and patching.

D. Replacement of biobased ceiling tile and grid.

E. Replacement of interior lights.

F. Installation of acoustical blanket.

G. Touch-up painting.

H. Moving and protection of furnishings.

I. Removal and installation of drapery.

J. Design and installation of modifications to fire detection system by a licensed fire protection engineer in the State of Tennessee.

K. Final cleanup prior to final inspection.

1.2 DEFINITIONS

A. Certain terms used in the contract documents are defined below.

Definitions and explanations contained in this section are not complete, but are general for the work to the extent that they are not stated more explicitly in another element of the contract documents.

1. Furnish. The term "furnish" means to supply and deliver to the project site, ready for unloading, unpacking, assembly, installation, and similar operations.

2. Install. The term "install" describes operations at the project site, including the actual unloading, unpacking, assembly, erection, ANZY059034 01 10 00-2 placing, anchoring, applying, working to dimensions, finishing, curing, protecting, cleaning, and similar operations.

3. Provide. The term "provide" means "provide complete in place";

that is, "furnish and install.”

4. Indicated. Where "as indicated" or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise.

5. Postconsumer material (FAR 52.223-9): a material or finished product that has served its intended use and has been discarded for disposal or recover, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered materials”.

6. Recovered material (FAR 2.101): waste materials and by-products recovered or diverted from solid waste. The term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

7. Biobased product (FAR 2.101): a product determined by the U.S.

Department of Agriculture (USDA) to be a commercial or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials (including plant, animal, and marine materials) or forestry materials.

8. USDA-designated item (FAR 233.401): a generic grouping of products that are or can be made with Biobased materials (1) that is listed by USDA in a procurement guideline (7 CFR 2902, Subpart B); and (2) for which USDA has provided purchasing recommendations.

1.3 CODES AND STANDARDS

A. AEDC Safety, Health, and Environmental (SHE) Standards latest version, available at http://www.aerospacetestingalliance.com/en/vendors/-site-work/safety-standards/

1. A6 with Supplement User and Subcontractor Safety

(Mandatory Documents/Submittals).

2. A9 Hazard Communications.

3. A10 Job Safety Analysis.

4. B1 Master Work Permit.

5. B2 Lockout/Tagout (LOTO).

6. B3 Control of Hazardous Areas Using

Safety Signs, Tags, and Barricades.

7. B5 Confined Spaces.

8. B6 Low Voltage Electrical Safety Related

Work Practices.

9. D3 Identification of Piping Systems.

10. D6 Aerial Work Platforms.

11. D8 Portable Power Tools.

12. D9 Fixed and Portable Ladders.

ANZY059034 01 10 00-3

13. D10 Scaffolds.

14. E7 Asbestos.

15. E17 Oil and Hazardous Substances Spill

Response.

16. E18 Managing Waste Containing Chemical or Petroleum Products.

17. E19 Lead and Heavy Metals.

18. F2 Personal Protection Equipment (PPE).

19. F6 Fall Protection.

B. Air Force Federal Acquisition Regulation:

1. AFFARS 2.101 Definitions of Words and Terms.

2. AFFARS 233.401 Use of Recovered Materials Definition.

3. AFFARS 52.223-9 Estimate of Percentage of Recovered

Material Content for EPA-Designated Items.

4. AFFARS 5352.223-9000 Elimination of Use of Class I Ozone Depleting Substances (ODS).

C. Code of Federal Regulations (CFR):

1. 7 CFR 2902 Subpart B Guidelines for Designating Biobased

Products for Federal Procurement, Designated Items.

2. 29 CFR 1926.1101 Asbestos.

3. 40 CFR 261 Identification and Listing of Hazardous

Waste.

4. 40 CFR 370 EPA Hazardous Chemical Reporting and Community Right to Know Requirement.

D. US Army Corp of Engineers:

1. USACE EM 385-1-1 Safety and Health Requirements

Manual, 2008.

1.4 JOB CONDITIONS

A. Plan and execute this project in a manner to minimize downtime.

Schedule all work in advance with the Government Representative.

B. Work will require coordination with test schedule. Coordinate with Government Representative. Work may involve limited access to the site.

Work shall be completed between test periods and may require multiple outages to complete work in all three tunnels. Allow for up to three outages, consisting of three days each over a 24 week timeframe.

C. Contractor shall make provision in schedule to allow 14 days for Government to drain and flush glycol from existing HVAC system prior to outage.

ANZY059034 01 10 00-4

D. Furnish new components and devices, complete, with all necessary materials for installation to meet this objective.

E. Do not interrupt existing utilities or commence power outages without signed authorization from the Government Representative. Submit each utility outage request for Government approval at least twenty days prior to each requested outage date. Outages may be granted depending upon the Government’s schedule for facility use, and may occur on weekends and/or holidays.

F. Keep work area clean and free from waste and debris. Dispose of waste as directed by the Government Representative.

G. Do not close or obstruct egress width to any building or site exit without written permission from the Government Representative.

H. Do not disable or disrupt building fire or life safety systems without written permission from the Government Representative.

I. Conform to applicable procedures when any hazardous or contaminated materials are discovered.

J. Cease operations immediately for any unsafe conditions and notify the Government Representative. Do not resume operations until authorized by the Government Representative.

K. Provide temporary barricades and other forms of protection as required to protect Government personnel and the general public from injury due to the work. Provide temporary signage as needed or directed in accordance with AEDC SHE Standard B3.

L. Remove protections at the completion of work.

M. Do not close, block, or otherwise obstruct streets, walks, or other occupied or used facilities without written permission from the Contracting officer.

N. Submit sketches of proposed scaffolding, if utilized. All scaffolding shall be in accordance with AEDC SHE Standard D10 and shall be inspected, approved, and tagged by the Contractor’s scaffold competent person after it has been erected and prior to use.

O. Verify lighting circuits are as indicated on the drawings. Mark up the drawings to show any changes.

P. Submit record as-built drawings.

1.5 PROTECTION OF EXISTING IMPROVEMENTS:

ANZY059034 01 10 00-5

A. Protection of the grounds, walkways and structures from deterioration due to excessive vehicular traffic, equipment disturbance, and material staging is critical to maintaining the quality appearance of AEDC. The Contractor shall protect against damage incurred by service vehicles, construction activities, maintenance and repair, and all other work that detracts from the overall appearance of the grounds and increases the costs of grounds maintenance.

B. Prior to commencement of work, inspect areas in which work will be performed. Submit a report with the Contracting Officer listing existing conditions which could be construed as damage resulting from the work.

The Government Representative may also photograph or video tape areas or improvements susceptible to damage to document conditions prior to the start of work.

C. The activity of vehicles and equipment on the grounds shall be limited to only that which is essential and required for completing the work. The Government Representative will approve all access and haul routes required for the work prior to any on site operations to preclude damage to sensitive utilities or improvements which may not be readily apparent.

D. Minimize travel paths and staging areas to limit the impact and damage to work areas. Lay out the work site, material and equipment staging, and vehicle and equipment activity to minimize visibility and aesthetic impact of activities to surrounding areas.

E. Protect above and below grade utilities, plant life, lawns, and other features or improvements to remain.

F. Protect benchmarks, existing structures, sidewalks, curbs, and pavements from excavation equipment and vehicular traffic.

G. Use protective materials, such as sheeting, steel plating, rigger pads, to protect grounds and pavement from heavy equipment activity and damage.

H. Protect existing facilities from falling debris during construction such as roof materials, ductwork scraps, or other materials, by use of protective materials such as sheeting, steel plates, netting, or other materials.

I. Provide temporary weather protection during any interval between demolition and removal of existing construction on exterior surfaces and installation of new construction to ensure no water leakage or damage occurs to the structure, interior areas, or contents of the existing facility.

J. Implement a daily procedure for area clean up and organized parking of vehicles and equipment.

ANZY059034 01 10 00-6

K. Provide temporary barricades, shoring, bracing, supports or other forms of protection as required to protect all existing improvements not scheduled to be demolished for both above and below ground improvements and to prevent movement, settlement, collapse or damage of any kind.

L. Maintain personnel and vehicular access and existing utilities to all buildings and other structures during the course of the work. Any changes or interruptions shall be coordinated and approved by the Government Representative well in advance. Temporary protections or services may be required as a condition of approval of any such change or interruption.

M. The Contractor shall be responsible for damage caused by the work and shall repair or replace same to the satisfaction of the Government. Obtain Government Representative’s approval of methods, materials, equipment or products for repair or replacement prior to use. All such repair or replacement shall be performed promptly at no additional cost to the Government. The Government will place special emphasis and requirements for repair or replacement of damage to underground utilities, lawns, grassed areas, existing structures, sidewalks, curbing, railings and pavements.

N. Remove all temporary barricades, shoring, bracing, supports or other forms of protection at completion of work. Restore all adjacent structures and surfaces to conditions existing prior to construction. Clean up all stockpiles and spoil areas, and restore all surrounding areas to conditions existing prior to construction.

1.6 SAFETY REQUIREMENTS:

A. All work shall be accomplished in compliance with AEDC SHE A6 with Supplement, A9, A10, B1, B2, B3, B5, B6, D3, D6, D8, D9, D10, E7, E17, E18, E19, F2, and F6. Submit a safety and health plan in accordance with AEDC SHE Standard A6 and USACE EM 385-1-1.

1.7 DISPOSAL OF CONTAMINATED EQUIPMENT

A. The Contractor shall clean equipment or material of contaminants prior to disposal at the AEDC Salvage Yard (with the exception of lead paint, unless the paint is flaking in which case the flaking paint shall be removed prior to transport to prevent contamination during transport). If cleaned equipment is to be turned-in to the Government for storage or excessing, a GC-1785, Special Material Turn-in Certification, shall be completed and submitted to the Government with the equipment or material prior to disposal. The Government Representative will assist the Contractor in filling out the form and in coordinating with Industrial Hygiene and Environmental Quality.

ANZY059034 01 10 00-7

1.8 CONNECTIONS TO POTABLE WATER

A. Contractor shall not make any connections to an AEDC potable water system without specific approval from the Government Representative.

B. Notify Government Representative if connections to hose bibs are needed. Do not connect to any hose bibs without Government-supplied backflow preventer and specific approval from Government Representative.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Deliver all equipment properly packaged in factory containers and/or mounted on shipping skids.

B. Provide and store all equipment in a clean, dry space, and protect from dirt, fumes, moisture, construction debris, and traffic. Ensure that all equipment is prepared for anticipated storage conditions.

C. Where equipment is stored outdoors, ensure electrical components are stored above grade and enclosed with watertight wrapping. Provide 120V temporary power to space heaters or provide temporary heat if required to protect equipment.

D. Notify Government Representative a minimum of two weeks prior to delivery of large equipment being stored on-site. Contractor shall offload equipment at a location designated by the Government Representative.

E. All handling, loading, and offloading of all equipment shall be done by the Contractor.

F. Handle and store all equipment in accordance with manufacturer’s instructions.

1.10 TOOL CONTROL: Coordinate tool control with the Government Representative.

1.11 EPA-DESIGNATED ITEMS

A. The Contractor, on completion of this contract in accordance with AFFARS 52.223-9, shall:

1. Estimate the percentage of the total recovered material content for

EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and

2. Submit this estimate to the Contracting Officer.

ANZY059034 01 10 00-8

1.12 ELIMINATION OF ODS CHEMICALS

A. The use of Class I ozone depleting substances (ODS) is prohibited.

Reference text of AFFARS clause 5352.223-9000.

1.13 DISALLOWED PRODUCTS

A. Do not use products or materials that contain lead, chromium, mercury, cadmium, silver, barium, selenium, beryllium, or arsenic on this project except as expressly authorized by the Contracting Officer. If no substitutes for products containing the listed materials are available, and the Contracting Officer approves the use of products containing the listed materials, highlight and detail their exact location on the drawings.

1.14 ASBESTOS PRODUCTS

A. Do not use products or materials that contain asbestos on this project except as expressly authorized by the Contracting Officer. If no substitutes for asbestos products are available, and the Contracting Officer approves the use of asbestos products, highlight and detail their exact location on the drawings and identify their location in the field following 29 CFR

1926.1101 guidelines.

1.15 HAZARDOUS WASTE

A. Where hazardous waste (as identified in 40 CFR 261) is generated, follow the procedures in AEDC SHE Standard E18, Chemical and Petroleum Products Waste Management, for storing and turning in hazardous waste.

These procedures include the requirement to complete Forms GC-565 and GC-1337, which will be furnished by the Government Representative.

1.16 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA

A. The following procedures shall be followed to meet 40 CFR 370, EPA Hazardous Chemical Reporting and Community Right to Know Requirement.

1. Procedures:

a. The Contractor shall furnish information on the hazardous materials he brings on AEDC property prior to beginning on-site work. Hazardous materials may include solvents, paints, adhesives, acids, or any other substance which could be included within the definitions in paragraph 2.

b. The information required is:

1) Company name, point of contact, and phone number.

2) Brief statement indicating how the hazardous material will be used within the scope of the contract.

3) List of all hazardous materials to be used (product name, manufacturer’s name, and address).

ANZY059034 01 10 00-9

4) Amount of each material to be stored on site and where it will be stored.

5) Where the product Material Safety Data Sheets (MSDS) will be maintained.

c. All unused product is the responsibility of the Contractor and shall be removed from AEDC property at the completion of the project.

d. The Contractor shall coordinate with the Government Representative and the Hazardous Waste Operations Group (454-3628) if any hazardous waste is to be generated.

2. Definitions

a. Hazard communication standard. A chemical right-to-know law under OSHA that requires chemical manufacturers and importers to assess the hazards of chemicals they make or import and to distribute this information to inform workers of the hazards associated with these chemicals. This written information is a Material Safety Data Sheet (MSDS).

b. Hazard classes. Hazardous materials that have been grouped into classes by the Department of Transportation (DOT). These classes include explosives, flammables, oxidizers and organic peroxides, compressed gases, corrosives, and poisons.

c. Hazardous material. Any substance that may be harmful when used. Specific substances have been designated as hazardous under the Clean Water Act, the Resource and Conservation and Recovery Act, and the hazardous air pollutants under the Clean Air Act.

d. Hazardous waste. Any waste that may cause or significantly contribute to serious illness or death or that may pose a substantial threat to human health or the environment, if not properly managed. Hazardous wastes may be solids, liquids, semi-solids, or compressed gases.

1.17 PROPRIETARY AND BRAND NAMES: Proprietary and brand names used in this document are meant to describe physical, performance, and quality characteristics of items and materials, and are not meant to limit competition or exclude Contractors, Vendors, or Manufacturers from submitting like products to the Contracting Officer for approval. Exception: Specification Section 23 09 23- Direct Digital Control System for HVAC.

END OF SECTION

ANZY059034 01 33 00-1

SECTION 01 33 00

SUBMITTAL PROCEDURES

1.1 DESCRIPTION OF REQUIREMENTS. This section specifies procedural requirements for non-administrative submittals, including but not limited to shop drawings, product data, manufacturer’s certificate, design data, calculations, and verifications, manufacturer’s instructions, manufacturer’s field service reports, samples, operation and maintenance manuals, and other miscellaneous work-related submittals. These submittals are required to amplify, expand, and coordinate other information contained in the contract.

Non-work-related submittals are addressed elsewhere in the contract rather than in the specification and may include items such as: contract progress schedule, permits, payment applications, performance and payment bonds, insurance certificates, and progress reports.

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections of the specification or statement of work.

1.2 SUBMITTAL PROCEDURE

A. Definition: For the purposes of this section, the term “Contractor” denotes the prime Contractor.

B. Listing: At the end of this section is a summarized listing of item submittals requiring approval for the work. The listing is included for the convenience of users of the contract documents. The listing may not be all inclusive and additional item submittals may be required. Within 14 calendar days after receiving contract award, Contractor shall submit a copy of the summarized submittal listing with calendar dates assigned to each item submittal indicating when submittal will be received by the Government. If contract requires a pre-construction conference, Contractor may submit completed submittal listing at the conference.

C. Risk: Do not proceed with the part of the work covered by an item submittal including purchasing, fabricating, and delivering until approval is received. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection. Any fabrication or other work performed in advance of the receipt of accepted item submittals and approvals shall be entirely at the Contractor’s risk and expense.

D. Transmittal Timing: Coordinate the preparation and processing of item submittals with the performance of the work. Prepare and transmit each item submittal to the Contracting Officer sufficiently in advance of the performance of related work and other applicable activities. Transmit

ANZY059034 01 33 00-2

related item submittals for the same unit of work so that processing will not be delayed by the Government's need to review submittals concurrently for coordination. No delay damages or time extensions will be allowed for time lost in late submittals.

E. Content: Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. All submittals which are generic and list more information than is specifically required shall be marked to identify required information. Complete AF Form 3000 and attach as cover sheet for each submittal. Contractor may include multiple item numbers on an AF Form 3000.

F. Language: All item submittals shall be written in English, including documents, notes on drawings, sketches, and/or samples, calculations, manuals, and all other instances of written text and communication.

G. Units: All item submittals shall be marked or show dimensions and values in the same units as specified in the contract documents.

H. Review Time: Allow sufficient time so that contract performance will not be delayed as a result of the time required to properly process submittals, including time for re-submittals, if necessary. Allow 14 calendar days for initial Government processing of each submittal. No extension of time will be authorized because of the Contractor's failure to transmit submittals to the Government sufficiently in advance of the work.

I. Contractor Certification: All submittals shall be carefully reviewed by an authorized representative of the Contractor prior to submission to the Government. Each submittal shall be dated, signed, and certified by the Contractor as being correct and in strict conformance with the contract documents. No consideration for review by the Government of any Contractor’s submittal will be made for any items which have not been so certified by the Contractor. All noncertified submittals will be returned to the Contractor without action taken by the Government, and any delays caused thereby shall be the total responsibility of the Contractor.

J. Deviations: Should any item submittals required by the contract documents show deviations from the contract requirement, the Contractor shall make specific mention of such deviations in the letter of transmittal, including stating cost effects, and product and system limitations which may adversely affect the work, in order that if acceptable, suitable action may be taken for proper adjustment of the contract; otherwise the Contractor will not be relieved of the responsibility for executing the work in accordance with the contract documents and the approved submittals.

Contractor shall clearly mark the proposed variation in all documentation and specifically point out deviations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government. Deviations from contract requirements require

ANZY059034 01 33 00-3

Government approval and will only be considered when advantageous to the Government. When proposing deviations, deliver written request to the Contracting Officer, with documentation of the nature and features of the deviation and why the deviation is desirable and beneficial to the Government. If lower cost is a benefit, include an estimate of the cost savings. In addition to documentation required for deviation, include the submittal information required for the item. Allow an additional 14 calendar days beyond normal submittal review period for consideration by the Government of submittals with deviations.

K. Approved Submittals: The part of the work covered by the approved item submittal may proceed provided it complies with the requirements of the contract documents. Final acceptance will depend upon that compliance.

The term “Approved” shall only indicate that there is no exception taken to the submittal. Approval of the item submittal shall not be construed as a complete check, and indicates only that the general method or other information appears to meet the contract requirements. Approval does not relieve the Contractor of the responsibility for any error which may exist.

After item submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment, or changes to any other information will be considered unless accompanied by an explanation of why a substitution or change is necessary.

L. Disapproved Submittals: Contractor shall correct disapproved item submittals and resubmit for approval within timeframe noted. If no date is given, Contractor shall submit corrected submittal within 14 calendar days.

If the Contractor considers any correction or notation on the returned submittal to constitute a change to the contract drawings, specification, or statement of work the Contractor shall notify the Contracting Officer.

M. Responsibility: The Government’s review of Contractor submittals shall not relieve the Contractor of the entire responsibility for the correctness of details and dimensions and conformance to the specifications. The Contractor shall assume all responsibility and risk for any mistakes and/or costs due to any errors in submittals.

N. Inconsistencies: If a conflict or inconsistency arises between an approved item submittal and the contract documents, the contract documents shall govern.

1.3 SPECIFIC SUBMITTAL DESCRIPTIONS AND REQUIREMENTS: Submittal requirements for individual units of work are specified in the applicable specification section or Statement of Work (SOW). Except as otherwise indicated in the individual specification sections or SOW, comply with the following requirements for each type of submittal.

A. Shop Drawings: These are technical drawings and data specially prepared for this contract including fabrication and installation drawings, setting and seaming diagrams, and coordination drawings (for use on-site). Shop

ANZY059034 01 33 00-4

drawings include drawings, diagrams and schedules specifically prepared to illustrate some portion of the work, diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project, or drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated. Information required on shop drawings includes dimensions, identification of specific products and materials which are included in the work, compliance with specified standards, and notations of coordination requirements with other work.

Provide special notations of dimensions that have been established by field measurements. Highlight, encircle, or otherwise indicate deviations from the contract documents on the shop drawings. Furnish one hard copy and one electronic copy.

B. Product Data: This data includes standard printed information on manufactured products that has not been specially prepared for this contract, including manufacturers' product specifications illustrating size, physical appearance and other characteristics of materials, installation instructions, standard color charts, catalog cuts, illustrations, schedules, standard wiring diagrams, standard product operating and maintenance manuals, and samples of warranty language when the contract requires extended product warranties. General information required specifically as product data includes manufacturers' standard printed recommendations for application and use, compliance with recognized standards of trade associations and testing agencies, the application of their labels and seals (if any), special notation of dimensions which have been verified by way of field measurement, and special coordination requirements for interfacing the material, product, or system with other work. Furnish three hard copies and one electronic copy.

C. Samples: These are physical examples of work, including, swatches showing color, texture, and pattern, color-range sets, and units of work to be used for independent inspection and testing. Samples include fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged, color samples from the manufacturer’s standard line (or custom color samples if specified) to be used in selecting or approving colors for the project, and field samples and mock-ups constructed on the project site to establish standards by which the ensuring work can be judged. This includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work. Submit samples for the Contracting Officer's visual review of general kind, color, pattern, and texture for a final check of the coordination of these characteristics with other related elements of the work and for quality control comparison of these characteristics between the final sample submittal and the actual work as it is delivered and installed. Submit one each.

ANZY059034 01 33 00-5

D. Design Data: Design data includes design calculations, mix designs, analyses or other data pertaining to a part of work. Refer to individual sections of the specification or statement of work for required quantities, formats, and signatures or certifications required. Furnish three hard copies and one electronic copy.

E. Test Plans and Reports: Test plans shall include planned testing, including a description of the test, equipment and supplies needed, and step-by-step notation of test activities and tasks. Test reports include reports signed by an authorized official of a testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with the specified requirements.

Testing shall have been within three years of date of contract award for the project. Reports also include findings of tests required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to the job site, findings of tests made at the job site or on a sample taken from the job site, investigation reports, daily logs and checklists, and final acceptance test and operational test procedures. Furnish three hard copies and one electronic copy of each such report required.

F. Certificates: These include statements printed on the manufacturer’s letterhead and signed by the responsible officials of the manufacturer of a product, system or material attesting that the product, system or material meets specification requirements. Certificates include documentation required of the Contractor, or of a manufacturer, supplier, installer or subcontractor through the Contractor, to further demonstrate the quality of orderly progressions of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications. Examples include confined space entry permits, and text of posted operating instructions.

Certificates shall be dated after award of the project contract and clearly name the project. Furnish three hard copies and one electronic copy of each certificate required.

G. Manufacturer’s Instructions: Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.

Furnish three hard copies and one electronic copy.

H. Manufacturer’s Field Reports: Documentation of the testing and verification actions taken by a manufacturer’s representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with the manufacturer’s standards or instructions. The documentation shall be signed by an authorized official of a testing laboratory or agency and shall state the test results, and indicate whether the material, product, or system has passed or failed the test. Furnish three hard copies and one electronic copy.

ANZY059034 01 33 00-6

I. Operation and Maintenance Data: Data furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer’s help and product line documentation necessary to maintain and install the equipment, and needed by operating and maintenance personnel for the safe and efficient operation, maintenance, and repair of the item. The data is intended to be incorporated in an operations and maintenance manual or control system.

Furnish two hard copies and one electronic copy.

J. Final Design Drawings and Documentation: Final design documentation including drawings, specifications, estimates, and other required deliverables. Electronic documentation submitted shall include every associated component file of drawings and other documentation, including raster images, jpeg, tiff, Excel, and any related items required to view, modify, or manipulate the electronic files. Furnish a CD-ROM of all final design documentation, and drawings in AutoCAD 2005 format or later, to the Contracting Officer for approval prior to applying for final payment.

K. Record (As-Built) Drawings: Record drawings showing final configuration of work accomplished. Show all changes, additions, and deviations from the original contract drawings and documentation. If no changes occur, furnish certification to that effect. Drawings may be redlined hardcopies or electronic drawings, and shall accurately show as-built conditions during the progress of the job. If electronic, furnish drawings on a CD-ROM, in AutoCAD 2005 format or later, including every associated component file of the drawings, including raster images, jpeg, tiff, Excel, and any related items required to view, modify, or manipulate the electronic files. Submit to the Contracting Officer for approval prior to applying for final payment.

L. Miscellaneous Submittals: These are work-related, non-administrative submittals that do not fit in the previous categories, including the following:

1. Maintenance agreements. Furnish one hard copy and one electronic copy.

2. Survey data and reports. Furnish one hard copy and one electronic copy.

3. Project photographs. Furnish both hard copies and digital files.

4. Keys and other security protection devices.

5. Maintenance tools, spare parts, and overrun or maintenance stock.

Refer to individual sections of the specification for required quantities of spare parts, extra and overrun stock, maintenance tools and devices, keys, and similar physical units to be submitted.

6. Qualification certificates. Furnish one hard copy and one electronic copy.

7. Employee training certificates and documentation showing successful completion of training.

8. Documentation of percentage of recovered material content used during contract.

9. Contractor safety and work plans and schedules.

ANZY059034 01 33 00-7

10. Warranties.

1.4 REQUIRED SUBMITTALS

No. Section Reference Submittal Description Due 1 01 10 00 para 1.4C Outage Request 2 weeks prior to outage 2 01 10 00 para 1.4L Proposed Scaffolding Before assembly and use 3 01 10 00 para 1.4N Record As-Built Drawings Before final inspection 4 01 10 00 para 1.5B Existing Conditions Report Which could be Construed as Damage Resulting from Work

Before beginning work

5 01 10 00 para 1.6A Safety and Health Plan Before beginning on-site work

6 01 10 00 para 1.9.A.2 Percentage of Recovered Material Content

Before final

7 01 10 00 para 1.11A Disallowed Products Locations Before final

8 01 10 00 para 1.12A Asbestos Locations Before final

9 01 10 00 para 1.13A Forms GC-565 and GC-1337 Before final

10 01 10 00 para 1.14.A.1.a Hazardous Material Info Before beginning on-

11 01 33 00 para 1.2B Summarized submittal listing with delivery dates

14 days after contract award

12 01 73 29 para 1.2A Proposed Procedures for Cutting and Patching

2 weeks prior to the procedure

13 01 74 19 para 1.4A Construction Waste Management Plan Before beginning on-

14 02 08 00 para 1.3A Employee Certification Before beginning on-

15 02 08 00 para 1.3B Training and Medical Certifications Before beginning on-

16 02 08 00 para 1.3C Training and Hazard Communications Certification

Before beginning on-

17 02 08 00 para 1.3D Product List Before beginning on-

18 02 08 00 para 1.3E Equipment List Before beginning on-

19 02 08 00 para 1.3F Notice of Violation Before beginning on-

Table I. Required submittal list - continued

ANZY059034 01 33 00-8

20 02 08 00 para 1.3G Environmental, Health, and Safety Plan Before beginning on-

21 02 08 00 para 1.3H Asbestos Removal Plan Before beginning on-

22 02 08 00 para 1.3I Air Sampling Reports Before beginning on-

23 02 08 00 para 1.3J Testing Certifications Before beginning on-

24 02 08 00 para 1.3K CPR Certification Before beginning on-

25 02 08 00 para 1.3L Insurance Coverage Certification Before beginning on-

26 02 08 00 para 1.3M Sampling List Before beginning on-

27 02 08 00 para 1.3N Operator’s Log and Shipper’s Log Before beginning on-

28 02 08 00 para 1.3O Daily Logs: Sign-In and Field Notes Before beginning on-

29 02 08 50 para 1.4A Employee Certification Before beginning on-

30 02 08 50 para 1.4B Training and Medical Certification Before beginning on-

31 02 08 50 para 1.4C Notice of Violation Before beginning on-

32 02 08 50 para 1.4D Environmental, Health, and Safety Plan Before beginning on-

33 02 08 50 para 1.4E Training and Hazard Communications

Certification Before beginning on-

34 02 08 50 para 1.4F Product List Before beginning on-

35 02 08 50 para 1.4G Lead Abatement Plan Before beginning on-

36 02 08 50 para 1.4H Air & Substrate Sampling Reports Before beginning on-

37 02 08 50 para 1.4I Testing Laboratory Qualifications Before beginning on-

38 02 08 50 para 1.4J Air Monitoring Results Before beginning on-

39 02 08 50 para 1.4K Equipment List Before beginning on-

40 02 08 50 para 1.4L Rental Equipment List Before beginning on-

41 02 08 50 para 1.4M Shower Water Test Results Before beginning on-

ANZY059034 01 33 00-9

42 02 41 19 para 1.3A Detailed Demolition Plan and Schedule Before beginning on-

43 05 05 00 para 1.3A Welders’ Certification Before beginning on-

44 05 50 00 para 1.3A Shop Drawings 14 days before beginning on-site

45 07 21 16 para 1.3A Product Data Before purchasing 46 07 21 16 para 1.3B Manufacturer’s Certificate Before purchasing 47 09 51 23 para 1.3A Product Data Before purchasing 48 09 51 23 para 1.3B Samples Before purchasing 49 09 90 00 para 1.4A Product Data Before purchasing 50 09 90 00 para 1.4B Samples Prior to Purchasing 51 23 05 29 para 1.3A Hanger and Supports Product Data Before beginning on-

52 23 05 29 para 1.3B Manufacturer’s Installation Instructions Before beginning on-

53 23 05 53 para 1.3A Nameplate and Pipe Marker Sample Before beginning on-

54 23 05 93 para 1.3A Testing, Adjusting, and Balancing

Reports Before final

55 23 05 93 para 1.3B Adjusting And Balancing Agency 14 days after

56 23 05 93 para 1.3C Project Record Documents Before final

57 23 07 00 para 1.3A Product Data Before purchasing 58 23 07 00 para 1.3B Manufacturer’s Installation Instructions Before beginning on-

59 23 07 50 para 1.3A Product Data Before purchasing 60 23 07 50 para 1.3B Manufacturer’s Instructions Before beginning on-

61 23 09 00 para 1.2A Product Data Before purchasing 62 23 09 00 para 1.2B Manufacturer’s Installation Instructions Before beginning on-

63 23 09 23 para 1.2A Manufacturer’s Literature Before beginning on-

64 23 09 23 para 1.2B Shop Drawings 2 weeks before beginning on-site

65 23 09 23 para 1.2C Test Data Before final

66 23 09 23 para 1.2D Graphics Page Files Before final

ANZY059034 01 33 00-10

67 23 09 23 para 1.2E Warranty Before final

68 23 21 13 para 1.3A Test Reports Before final

69 23 21 13 para 1.3B Product Data Before purchasing 70 23 21 16 para 1.3A Product Data Before purchasing 71 23 21 16 para 1.3B Installer Certification Before beginning on-

72 23 21 16 para 1.3C Manufacturer’s Installation Instructions Before beginning on-

73 23 21 16 para 1.3D Operation and Maintenance Data Before beginning on-

74 23 31 00 para 1.3A Product Data Before purchasing 75 23 33 00 para 1.3A Product Data Before purchasing 76 23 34 00 para 1.2A Shop Drawings Before purchasing 77 23 34 00 para 1.2B Product Data Before purchasing 78 23 34 00 para 1.2C Manufacturer’s Installation Instructions Before beginning on-

79 23 37 00 para 1.2A Product Data Before beginning on-

80 23 73 00 para 1.3A Product Data Before beginning on-

81 23 73 00 para 1.3B Manufacturer’s Installation Instructions Before beginning on-

82 23 73 00 para 1.3C Maintenance Data Before beginning on-

83 23 73 00 para 1.3D Equipment Physical Layout Prior to purchase 84 23 73 00 para 1.3E Warranty Before beginning on-

85 26 05 03 para 1.3A Manufacturer’s Descriptive Literature Before purchasing 86 26 05 19 para 1.3A Product Data Before purchasing 87 26 05 19 para 1.3B Test Results 14 days after

88 26 05 26 para 1.3A Manufacturer’s Descriptive Literature Before purchasing 89 26 05 33 para 1.3A Product Data Before purchasing 90 26 27 26 para 1.3A Equipment/Material List Before beginning on-

91 26 28 19 para 1.3A Product Data Before purchasing 92 26 28 19 para 1.3B Project Record Documents Prior to pre-final

93 26 51 00 para 1.4A Equipment/Material List Before beginning on-

94 26 51 00 para 1.4B Manufacturer’s Descriptive Literature Before purchasing

ANZY059034 01 33 00-11

95 26 51 00 para 1.4C Operation and Maintenance Manuals Before beginning on-

96 26 52 00 para 1.2A Product Data Before purchasing 97 28 31 00 para 1.4A Shop Drawings Before beginning on-

98 28 31 00 para 1.4B Product Data Before purchasing 99 28 31 00 para 1.4C Test Reports 2 weeks after test

100 28 31 00 para 1.4D Installer’s Field Reports 2 weeks after installation

101 28 31 00 para 1.4E Project Record Documents Prior to pre-final

102 28 31 00 para 1.4F Operation and Maintenance Data Before beginning on-

Table I. Required submittal list – Complete.

ANZY059034 01 45 00-1

SECTION 01 45 00

REGULATORY REQUIREMENTS

1.1 This section lists regulations, codes, and standards which specify procedural and administrative requirements imposed upon the work.

1.2 The Contractor shall comply with provisions of the following documents to the extent referenced herein.

A. Government Documents:

1. AEDC Safety, Health, and Environmental (SHE) Standards latest version, available at http://www.aerospacetestingalliance.com/en/vendors/-site-work/safety-standards/

a. A6 with Supplement User and Subcontractor Safety (Mandatory

Documents/Submittals).

b. A9 Hazard Communications.

c. A10 Job Safety Analysis.

d. B1 Master Work Permit.

e. B2 Lockout/Tagout (LOTO).

f. B3 Control of Hazardous Areas Using Safety

Signs, Tags, and Barricades.

g. B5 Confined Spaces.

h. B6 Low Voltage Electrical Safety Related Work

Practices.

i. D3 Identification of Piping Systems.

j. D6 Aerial Work Platforms.

k. D8 Portable Power Tools.

l. D9 Fixed and Portable Ladders.

m. D10 Scaffolds.

n. E7 Asbestos.

o. E17 Oil and Hazardous Substances Spill

Response.

p. E18 Managing Waste Containing Chemical or

Petroleum Products.

q. E19 Lead and Heavy Metals.

r. F2 Personal Protection Equipment (PPE).

s. F6 Fall Protection.

2. Air Force Federal Acquisition Regulation (AFFARS):

a. AFFARS 2.101 Definitions of Words and Terms.

b. AFFARS 233.401 Use of Recovered Materials Definition.

c. AFFARS 52.223-9 Estimate of Percentage of Recovered Material

Content for EPA-Designated Items.

d. AFFARS 5352.223-9000 Elimination of Use of Class I Ozone Depleting

Substances (ODS).

3. Code of Federal Regulations:

a. 7 CFR 2902 Subpart B Guidelines for Designating Biobased Products for Federal Procurement, Designated Items.

b. 29 CFR 1910.134 Respiratory Protection.

ANZY059034 01 45 00-2

c. 29 CFR 1910.1200 Hazard Communication.

d. 29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists.

e. 29 CFR 1926.57 Ventilation.

f. 29 CFR 1926.59 Hazard Communication.

g. 29 CFR 1926.62 Lead Standard.

h. 29 CFR 1926.1101 Asbestos.

i. 40 CFR 61 National Emission Standards for Hazardous

Air Pollutants (NESHAP).

j. 40 CFR 82 Subpart F Protection of Stratospheric Ozone, Recycling and Emissions Reduction.

k. 40 CFR 82.161 Technician Certification.

l. 40 CFR 260 Hazardous Waste Management Systems:

General.

m. 40 CFR 261 Identification and Listing of Hazardous

Wastes.

n. 40 CFR 262 Generators of Hazardous Waste.

o. 40 CFR 370 EPA Hazardous Chemical Reporting and

Community Right to Know Requirement.

p. 49 CFR 172 Department of Transportation (DOT)

Regulations for Use of Hazardous Materials Tables and for Communication.

q. 49 CFR 178 DOT Specifications for Packaging.

4. Environmental Protection Agency Document:

a. EPA SW-846 Proposed Sampling and Analytical Methodologies for Additions to Test Methods for Evaluating Solid Waste: Physical/Chemical Methods, 2012.

5. Public Law:

a. PL 101-637 The Asbestos School Hazard Abatement

Reauthorization Act (ASHARA), 1990.

6. Tennessee Department of Environment and Conservation:

a. TDEC Chapter 1200-01-20 Asbestos Accreditation Requirements, 2009.

b. TDEC Chapter 1200-3-11-02 Hazardous Air Contaminants, Asbestos, 2011.

c. TDEC Cross-Connection Control Manual and Design Criteria for Cross-

Connection Control Plans, Ordinances, and Polices, 2008

7. US Army Corp of Engineers:

a. USACE EM 385-1-1 Safety and Health Requirements Manual, 2008.

B. Non-Government Documents:

1. Air-Conditioning, Heating and Refrigeration Institute:

a. AHRI 430-09 Central-Station Air-Handling Units.

2. American Institute of Steel Construction:

a. AISC 325-11 Steel Construction Manual.

3. American Society of Mechanical Engineers:

a. ASME A13.1-13 Scheme for the Identification of Piping Systems.

b. ASME B16.3-11 Malleable Iron Threaded Fittings Classes 150 and 300.

ANZY059034 01 45 00-3

c. ASME B16.18-12 Cast Copper Alloy Solder Joint Pressure Fittings.

d. ASME B16.22-13 Wrought Copper and Copper Alloy Solder Joint Pressure Fittings.

e. ASME B31.1-14 Power Piping.

f. ASME B31.9-14 Building Services Piping.

g. ASME B40.100-13 Pressure Gauges and Gauge Attachments.

4. American Society of Safety Engineers:

a. ASSE Z9.2-12 Fundamentals Governing the Design and

Operation of Local Exhaust Ventilation

5. American Welding Society, Inc.:

a. AWS D1.1-10 Structural Welding Code - Steel.

b. AWS Z49.1-12 Safety in Welding, Cutting, and Allied

Processes.

6. Associated Air Balancing Council:

a. AABC MN 1-02…