FA910115R0038_0002_Hydraulic_Skid_Amend.pdf
PDF 47 KB Posted
- Attached to
- Hydraulic Skid
- Solicitation number
- FA9101-15-R-0038
About this file
FA9101-15-R-0038 00002 Hydraulic Skid Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA910115R0038_0003_Hydraulic_Skid_Amend.pdf | ||
| FA910115R0038_001_Hydraulic_Skid_Amend.pdf | ||
| FA910115R0038_Hydraulic_Skid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
See Block #2
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
04 SEP 2015
4. REQUISITION/PURCHASE REQ.NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY AFTC/PZI ARNOLD CODE FA9101 7. ADMINISTERED BY (If other than Item 6) CODE
AEDC/PZI
100 KINDEL DRIVE, SUITE A-332
ARNOLD AFB, TN 37389-1332
MIRIAM J. HARRIS 931-454-5139
miriam.harris.1@us.af.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
FA9101-15-R-0038
X
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X )
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM
10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide clarification to questions received in regards to equipment specifications. The due date and time for proposals is NOT extended. Proposals are due 10 September 2015, 2pm CST.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print).
16A. NAME AND TITLE OF SIGNER (Type or print)
SETH E. KING
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
BY________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.14.5 FAR (48 CFR) 53.243 Created 04 Sep 2015 10:38 AM
SCHEDULE
FA9101-15-R-0038 0002
The following clarification is provided in response to questions received regarding cylinder size.
Question: What size cylinder is this system operating? Bore - Stroke- rod size and, are there any valves on the cylinder such as counterbalance or pilot operated check valves?
Response: There are no counterbalance valves or pilot operated check valves on the user cylinders. They are simple cylinders. The supplier may have to provide items such as pilot operated check valves in the control cabinet to make the existing cylinders operate as required in the specification. However, the supplier is responsible for the design and selection of appropriate equipment for the cabinet within the bounds of the requirements in the specification.
Each control cabinet will be supplying two cylinders (there are 4 cylinders total). The cylinders are arranged on the main process valve such that one cylinder is advancing while the other is retracting. All four cylinders are MILLER" Model 90, H-Series, 12" Bore, 50.630" Stroke, 3000 psi. 5-1/2" dia. rod size, single rod.
File details come from the government source that posted it. Updated .