Attachment_2 _Drawings.pdf
PDF 6 MB Posted
- Attached to
- Repair Air System for Boilers #2, 3, and 4 Federal contract opportunity
- Solicitation number
- FA9101-14-B-0008
About this file
Attachment 2 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_4 _Q A_and_Due_Date.pdf | ||
| Site_Visit_Roster _22_August_2014.pdf | ||
| Amendment_03 _Site_Visit_etc..pdf | ||
| Amendment_0002.pdf | ||
| 4_5.JPG | JPG image | |
| 2_9.JPG | JPG image | |
| 2_14.JPG | JPG image | |
| 3_1.JPG | JPG image | |
| 2_1.JPG | JPG image | |
| 4_1.JPG | JPG image | |
| Amendment_0001.pdf | ||
| 3_5.JPG | JPG image | |
| 4_3.JPG | JPG image | |
| 3_6.JPG | JPG image | |
| 1_1.JPG | JPG image | |
| 2_6.JPG | JPG image | |
| 2_11.JPG | JPG image | |
| 1_6.JPG | JPG image | |
| 4_2.JPG | JPG image | |
| 2_8.JPG | JPG image | |
| 2_12.JPG | JPG image | |
| 3_3.JPG | JPG image | |
| 1_4.JPG | JPG image | |
| 1_7.JPG | JPG image | |
| 2_7.JPG | JPG image | |
| 2_16.JPG | JPG image | |
| 2_2.JPG | JPG image | |
| 3_2.JPG | JPG image | |
| 1_5.JPG | JPG image | |
| 2_5.JPG | JPG image | |
| 2_4.JPG | JPG image | |
| 1_3.JPG | JPG image | |
| 2_15.JPG | JPG image | |
| Attachment_1 _Statement_of_Work_13437-13-003_Rpr_Boilers_2-3-4_Air_Syspdf.pdf | ||
| Attachment_3 _U.S._DOL_Wage_Determination.pdf | ||
| Solicitation.pdf | ||
| Attachment_4 _Bid_Bond.pdf |
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANZY109043
JOB NO. 13437
REPAIR BOILER #2, 3, & 4 AIR SYSTEMS, STEAM PLANT A
SCOPE OF WORK:
NOTE:
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si tiv e
INSTALLATION NOTES:
SECTION: DAMPER CONTROL BOX SUPPORT
SECTION: DAMPER CONTROL BOX SUPPORT
HANDRAIL ELEVATION, BOILER #2 EXHAUST DUCTING
HANDRAIL & DAMPER CONTROL BOX LOCATION PLAN
VIEW, BOILER #2 EXHAUST DUCTING
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/26/2013
N ot
S en si
OPTION 2
OPTION 1
F
D
G
B
A
14 12 10 57 3 1
KEYPLAN
LEGEND:
FORCED DRAFT FAN, ASH HOPPER, AND DAMPER
DEMOLITION PLAN, PARTIAL FIRST FLOOR PLAN, BLDG. 1411
DEMOLITION NOTES:
FORCED DRAFT FAN BOILER #4
OPTION 1 NOTE:
OPTION 2 NOTE:
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si
F
D
G
B
A
14 12 10 57 3 1
KEYPLAN
LEGEND:
INDUCED DRAFT FAN DEMOLITION PLAN, BOILER #2,
FOURTH FLOOR, BLDG. 1411
DEMOLITION NOTES:
INDUCED DRAFT FAN, BOILER #2
MECHANICAL DUST COLLECTOR, BOILER #2
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si
DAMPER
EXPANSION
JOINT
I.D. FAN
#3 & 4
EXPANSION
JOINT
EXISTING FORCE
DRAFT DAMPER
AND CONTROLS
ON SOUTH SIDE OF
F.D. FAN ON
BOILERS #3 & 4.
SEE PHOTO ON
SHEET M1
FAN WHEEL
CASE
STACK
ASH HOPPER
MOTOR
#3 & 4
OPTION 1 FOR
BOILER 3
OPTION 2 FOR
BOILER 4
F
D
G
B
A
14 12 10 57 3 1
KEYPLAN
LEGEND:
BOILER #2 ELEVATION DEMOLITION PLAN, BLDG. 1411 BOILERS #3 & 4 ELEVATION DEMOLITION PLAN, BLDG. 1411
BOILER #2 DEMOLITION NOTES:
BOILER #3 AND 4 DEMOLITION NOTES:
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si
D
G
B
A
14 12 10 57 3 1
KEYPLAN
LEGEND:
TOP SIDE OF BOILER #2, DRUM LEVEL, INSTALLATION PLAN, BLDG. 1411
TOP SIDE OF BOILER #2, DRUM LEVEL, DEMOLITION PLAN, BLDG. 1411
INDUCED DRAFT DAMPER BOILER #2
DEMOLITION NOTES:
INSTALLATION NOTES:
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/26/2013
N ot
S en si
D
G
B
A
14 12 10 57 3 1
KEYPLAN
INSTALLATION NOTES:
FORCED DRAFT FAN, AND DAMPERS INSTALLATION PLAN,
PARTIAL FIRST FLOOR PLAN, BLDG. 1411
NEW FORCED DRAFT CONCRETE PAD, BOILER #2
PLAN VIEW
NEW FORCED DRAFT FAN, BOILER #2
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si
D
G
B
A
14 12 10 57 3 1
KEYPLAN
FORCED & INDUCED DAMPER SCHEDULE BOILERS 2, 3 & 4
FAN SCHEDULE, BOILER #2
INSTALLATION NOTES:
INDUCED DRAFT FAN INSTALLATION PLAN, BOILER #2,
FOURTH FLOOR, BLDG. 1411
NEW INDUCED DRAFT CONCRETE PAD, BOILER #2
PLAN VIEW
EXPANSION JOINT SCHEDULE, BOILER 2
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si
EXISTING
1/2" CWS
D
R
A
I
N
F
I
E
L
D
R
O
U
T
E
T
T
R
O
U
G
H
F
L
E
X
H
S
E
F
D
G
B
A
14 12 10 57 3 1
KEYPLAN
INSTALLATION NOTES:
BOILER 2, 3, AND 4 ELEVATION INSTALLATION PLAN, BLDG. 1411
I.D. FAN BEARING DETAIL, BOILER #2
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si
SECTION: BOILER #2
SECTION: NEW DUCT CUTOUT UNDER I.D. FAN BOILER #2
SECTION: I.D. FAN OPENING
DETAIL: VERTICAL DAMPER
DETAIL: I.D. FAN CASING
DETAIL: RETANGULAR DUCT WALL
DETAIL: EXPANSION JOINT
ELEVATION: EXHAUST DUCTING, BOILER #2
ELEVATION: EXHAUST DUCTING, BOILER #2
INSTALLATION NOTES:
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si
D
G
B
A
14 12 10 57 3 1
KEYPLAN
GENERAL CONTROL NOTES:
EXISTING I/P MECHANICAL DIAGRAM, FORCE DRAFT DAMPER, BOILER #3
LEGEND:
EXISTING I/P MECHANICAL DIAGRAM, FORCE DRAFT DAMPER, BOILER #4
EXISTING I/P MECHANICAL DIAGRAM, FORCE DRAFT DAMPER, BOILER #2
NEW FORCE DRAFT I/P MECHANICAL DIAGRAM TYPICAL
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/27/2013
N ot
S en si
D
G
B
A
14 12 10 57 3 1
KEYPLAN
GENERAL CONTROL NOTES:
LEGEND:
EXISTING I/P MECHANICAL DIAGRAM, INDUCED
DRAFT DAMPER, BOILER #3
EXISTING I/P MECHANICAL DIAGRAM, INDUCED
DRAFT DAMPER, BOILER #4
EXISTING I/P MECHANICAL DIAGRAM, INDUCED
DRAFT DAMPER 4TH FLOOR, BOILER #2
NEW I/P MECHANICAL DIAGRAM, INDUCED
DRAFT DAMPER 3RD FLOOR, BOILERS #3 AND 4
NEW I/P MECHANICAL DIAGRAM, INDUCED
DRAFT DAMPER 3RD FLOOR, BOILER #2
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/27/2013
N ot
S en si
CABLE TABLE
GENERAL NOTES: ELECTRICAL ABBRREVIATIONSELECTRICAL LEGEND:
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/28/2013
N ot
S en si
DEMOLITION NOTES:
LEGEND:
ELECTRICAL COMPONENT TABLE
FD FAN NO. 2
30HP SIZE-3
ID FAN NO. 2
60HP SIZE-4
MCC-N FRONT ELEVATION (EXISTING)
KEY PLAN - BUILDING 1411ELECTRICAL DEMOLITION PLAN - OPERATING FLOOR - BUILDING 1411
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/28/2013
N ot
S en si
FDF-2 MOTOR & LOCAL STOP/LOCKOUT AND JOG
PB-STATION CONDUIT & WIRING DETAILS
EV-231AA
I/P-231A
ZSH231A
ZS231A
EV-231A
FDF-2 DAMPER CONTROLS CONDUIT SCHEMATIC
(DEMOLITION)
I/P-331B
TT-332
PT-333
ZSH331A
ZS331A
I/P-331A
EV-331A
EV-331AA
FDF-3 DAMPER CONTROLS CONDUIT SCHEMATIC
(DEMOLITION)
JUNCTION BOX
WALL MOUNTED
JUNCTION BOX
WALL MOUNTED
FDF-4 DAMPER CONTROLS CONDUIT SCHEMATIC
(DEMOLITION)
TT-432
PT-433
ZSH431A
ZS431A
I/P-431A
EV-431A
EV-431AA
I/P-431B
JUNCTION BOX
WALL MOUNTED
JUNCTION BOX
WALL MOUNTED
NOTES:
LEGEND:
ELECTRICAL DEMOLITION PLAN - PARTIAL FIRST FLOOR - BUILDING 1411 KEY PLAN - BUILDING 1411
ELECTRICAL COMPONENT TABLE
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/28/2013
N ot
S en si
IDF-2 MOTOR & LOCAL STOP/LOCKOUT AND JOG
I/P-237A
IDF-2 DAMPER CONTROLS CONDUIT SCHEMATIC
(DEMOLITION)
EV-237A
DEMOLITION NOTES:
LEGEND:
KEY PLAN - BUILDING 1411
ELECTRICAL COMPONENT TABLE
IDF-4 IDF-3
IDF-2
ELECTRICAL DEMOLITION PLAN - PARTIAL FOURTH FLOOR - BUILDING 1411
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/28/2013
N ot
S en si
MCC-N ONE-LINE DIAGRAM (EXISTING)
MCC-N
LEGEND:
DEMOLITION NOTES:
ELECTRICAL COMPONENT TABLE
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si
DEMOLITION NOTES:
KEY PLAN - BUILDING 1411
ELECTRICAL COMPONENT TABLE
BOILER NO. 4 BOILER NO. 3 BOILER NO. 2
IDFD-4 IDFD-3
I/P-337A
IDFD-3 CONTROLS CONDUIT SCHEMATIC
(DEMOLITION)
EV-337A
IDFD-4 CONTROLS CONDUIT SCHEMATIC
(DEMOLITION)
I/P-437A
ZSH-437A
EV-437A
ELECTRICAL DEMOLITION PLAN - PARTIAL PLATFORM LEVEL - BUILDING 1411
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/27/2013
N ot
S en si
ELECTRICAL COMPONENT TABLE
MCC-N FRONT ELEVATION (MODIFIED) KEY PLAN - BUILDING 1411ELECTRICAL INSTALLATION PLAN - OPERATING FLOOR - BUILDING 1411
INSTALLATION NOTES:
BAILEY SYSTEM I/O PANEL
CONDUIT AND CABLE INSTALLATION
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/27/2013
N ot
S en si
MCC-N ONE-LINE DIAGRAM (MODIFIED)
MCC-N
LEGEND:
NOTES:
ELECTRICAL COMPONENT TABLE
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si
FDF-2 MOTOR & LOCAL STOP/LOCKOUT AND JOG
FDF-4 FDF-3 FDF-2
ELECTRICAL MODIFICATION PLAN - PARTIAL FIRST FLOOR - BUILDING 1411
KEY PLAN - BUILDING 1411
EV-231AA
ZSH231A
ZS231A
FDF-2 DAMPER CONTROL PANEL CABLE
AND CONDUIT CONNECTION DIAGRAM
EV-231A
I/P-231A
JBH0921
EV-331A
EV-331AA
I/P-331A
ZSH331A
ZS331AA
TT-332
PT-333
FDF-3 DAMPER CONTROL PANEL CABLE
AND CONDUIT CONNECTION DIAGRAM
JBH0922
EV-431A
EV-431AA
I/P-431A
ZSH431A
ZS431AA
TT-432
PT-433
FDF-4 DAMPER CONTROL PANEL CABLE
AND CONDUIT CONNECTION DIAGRAM
JBH0923
ELECTRICAL COMPONENT TABLE
NOTES:
LEGEND:
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/25/2013
N ot
S en si
KEY PLAN - BUILDING 1411
ELECTRICAL COMPONENT TABLE
IDFD-3 CONTROLS CONDUIT SCHEMATIC
(MODIFICATION)
ZSH-337A
I/P-337A
EV-337A
IDFD-4 CONTROLS CONDUIT SCHEMATIC
(MODIFICATION)
EV-437A
I/P-437A
IDFD-2 CONTROLS CONDUIT SCHEMATIC
(MODIFICATION)
I/P-237A
EV-237A
NOTES:
BOILER NO. 4 BOILER NO. 3 BOILER NO. 2
IDFD-4 IDFD-3 IDFD-2
LEGEND:
ELECTRICAL MODIFICATION PLAN - PARTIAL PLATFORM LEVEL - BUILDING 1411
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/28/2013
N ot
S en si
IDF-2
IB2
OB2
KEY PLAN - BUILDING 1411
NOTES:
LEGEND:
ELECTRICAL COMPONENT TABLE
IDF-2 MOTOR & LOCAL STOP/LOCKOUT AND JOG
PB-STATION CONDUIT & WIRING DETAILS
IDF-2 BEARING TEMPERATURE SENSOR
& TRANSMITTER CONDUIT AND CABLE
CONNECTION DIAGRAM
IB2-TT
OB2-TT
IB2-RTD
OB2-RTC
JBH0920
IDF-2 MOTOR CONDUIT & BEARING
TEMPERATURE JUNCTION BOX
INSTALLATION
IB2-TT WIRING SCHEMATIC
IB2-TT
IB2-RTD
OB2-TT WIRING SCHEMATIC
OB2-TT
OB2-RTD
ELECTRICAL MODIFICATION PLAN - PARTIAL FOURTH FLOOR - BUILDING 1411
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/28/2013
N ot
S en si
NOTES:
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/28/2013
N ot
S en si
TEMPERATURE SWITCH MOUNTING STAND
FABRICATION AND INSTALLATION DETAILS
E13
ELEVATION: TEMPERATURE SWITCH MOUNTING STAND
FABRICATION AND INSTALLATION DETAILS (REAR VIEW)
E
IDF-2 BEARING TEMPERATURE SWITCH MOUNTING STAND ELEVATION
D
NOTES:
LEGEND:
A M
Drawing Approved Electronically
RELEASED FOR EXECUTION
03/28/2013
N ot
S en si
| Attachment 1b, Drawing TXT34910.G1_-_01_stamp |
| Attachment 1c, Drawing XT34910.C1_-_01_stamp |
| Attachment 1d, Drawing TXT34910.M1_-_01_stamp |
| Attachment 1e, Drawing TXT34910.M2_-_01_stamp |
| Attachment 1e, Drawing TXT34910.M3_-_01_stamp |
| Attachment 1f, Drawing TXT34910.M4_-_01_stamp |
| Attachment 8, Drawing TXT34910.M5_-_01_stamp |
| Attachment 9, Drawing TXT34910.M6_-_01_stamp |
| Attachment 10, Drawing TXT34910.M7_-_01_stamp |
| Attachment 11, Drawing TXT34910.M8_-_01_stamp |
| Attachment 12, Drawing TXT34910.M9_-_01_stamp |
| Attachment 13, Drawing TXT34910.M10_-_01_stamp |
| Attachment 14, Drawing TXT34910.E1_-_01_stamp |
| Attachment 14, Drawing TXT34910.E2_-_01_stamp |
| Attachment 15, Drawing TXT34910.E3_-_01_stamp |
| Attachment 16, Drawing TXT34910.E4_-_01_stamp |
| Attachment 17, Drawing TXT34910.E5_-_01_stamp |
| Attachment 18, Drawing TXT34910.E6_-_01_stamp |
| Attachment 19, Drawing TXT34910.E7_-_01_stamp |
| Attachment 20, Drawing TXT34910.E8_-_01_stamp |
| Attachment 21, Drawing TXT34910.E9_-_01_stamp |
| Attachment 22, Drawing TXT34910.E10_-_01_stamp |
| Attachment 23, Drawing TXT34910.E11_-_01_stamp |
| Attachment 24, Drawing TXT34910.E12_-_01_stamp |
| Attachment 25, Drawing TXT34910.E13_-_01_stamp |
File details come from the government source that posted it. Updated .