Amendment 0003 Site Visit Questions and Answers Additional Information
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_4 _Q A_and_Due_Date.pdf | ||
| Site_Visit_Roster _22_August_2014.pdf | ||
| Amendment_0002.pdf | ||
| 4_5.JPG | JPG image | |
| 3_5.JPG | JPG image | |
| 4_3.JPG | JPG image | |
| 3_6.JPG | JPG image | |
| 1_1.JPG | JPG image | |
| 2_6.JPG | JPG image | |
| 2_11.JPG | JPG image | |
| 1_6.JPG | JPG image | |
| 2_9.JPG | JPG image | |
| 2_14.JPG | JPG image | |
| 3_1.JPG | JPG image | |
| 2_1.JPG | JPG image | |
| 4_1.JPG | JPG image | |
| Amendment_0001.pdf | ||
| 4_2.JPG | JPG image | |
| 2_8.JPG | JPG image | |
| 2_12.JPG | JPG image | |
| 3_3.JPG | JPG image | |
| 1_4.JPG | JPG image | |
| 1_7.JPG | JPG image | |
| 2_7.JPG | JPG image | |
| 2_16.JPG | JPG image | |
| 2_2.JPG | JPG image | |
| 3_2.JPG | JPG image | |
| 1_5.JPG | JPG image | |
| 2_5.JPG | JPG image | |
| 2_4.JPG | JPG image | |
| 1_3.JPG | JPG image | |
| 2_15.JPG | JPG image | |
| Attachment_1 _Statement_of_Work_13437-13-003_Rpr_Boilers_2-3-4_Air_Syspdf.pdf | ||
| Attachment_2 _Drawings.pdf | ||
| Attachment_3 _U.S._DOL_Wage_Determination.pdf | ||
| Solicitation.pdf | ||
| Attachment_4 _Bid_Bond.pdf |
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
See Block #2
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
19 AUG 2014
4. REQUISITION/PURCHASE REQ.NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY AFTC PZI ARNOLD CODE FA9101 7. ADMINISTERED BY (If other than Item 6) CODE
AFTC PZI ARNOLD
100 KINDEL DRIVE, SUITE A-332
ARNOLD AFB, TN 37389-1332
REBECCA J. GARDNER 931-454-4405
REBECCA.GARDNER.1@US.AF.MIL
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
FA9101-14-B-0008
X
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X )
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM
10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide an additional site visit, and provide questions and answers and additional instructions. See page two for details.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print).
16A. NAME AND TITLE OF SIGNER (Type or print)
REBECCA J. GARDNER
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
BY________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.14.1 FAR (48 CFR) 53.243 Created 19 Aug 2014 9:40 AM
SCHEDULE OF CHANGES
FA9101-14-B-0008 0003
AMENDMENT #3
Boiler #2, 3, and 4 Air Systems 19 August 2014
The purpose of this amendment is to provide an additional site visit and final questions deadline.
A. SITE VISIT
1. Another site visit will be scheduled for this Friday, 22 August 2014 at 9:30AM CST.
2. Please register for this site visit by contacting the Contracting Officer at Rebecca.Gardner.1@US.AF.MIL by 21 August 2014 no later than 2:00PM CST.
3. Please bring appropriate personal protective equipment such as hard hat, eye protections, closed toe shoes, etc.
B. BID OPENING
1. The Bid Opening remains the same as 3 September 2014 at 2:00PM CST. All Bids and 20% Bid Bonds must be received by this due date and time. Late Bids will not be accepted.
2. In order to deliver bids, offerors need to register to receive a base access badge. Please contact the Contracting Officer at Rebecca.Gardner.1@US.AF.MIL or 931-454-4405 to request base access. Please indicate whether or not you are a US Citizen. Access approval for Non-US Citizens may take 15-30 days for approval.
3. The lowest priced offeror who is responsive to the solicitation will be asked to verify their price in writing (via e-mail) no later than 2:00PM CST the day following Bid Opening in order to verify that there were no mistakes in bid in accordance with Federal Acquisition Regulation (FAR) paragraph 14.407-1, Mistakes in Bids - General. Any mistakes in bid will be processed in accordance with FAR 14.407.
C. ACKNOWLEDGING AMENDMENTS
1. Please acknowledge all amendments in your Bid either by signing blocks 15a,b, and C on page one of the amendment or completing Block 19 on page two of the solicitation, Standard Form 1442.
2. Please review www.FBO.gov frequently to receive the most recent information.
D. SUBMISSION OF QUESTIONS
1. After the second site visit is completed, questions will be accepted through Tuesday, 26 August 2014 no later than 2:00PM CST. This will allow for a final amendment, if necessary, before bid opening.
2. All questions must be received in writing. Any questions answered at the site visit are not contractually binding unless those questions are submitted in writing and answered through an amendment to the solicitation. Submit questions to the Contracting Officer at Rebecca.Gardner.1@US.AF.MIL.
E. QUESTIONS AND ANSWERS
NOTE: Answers for Questions 1 through 13 are provided on Amendment 02.
SCHEDULE OF CHANGES
FA9101-14-B-0008 0003
Question 14: Reference Q&A Addendum #2, Q/A #3 Question below Question set #5, item #1. Review of answer has noted that any repair to the boiler shell/fire box will required boiler repair specialist and the cost is indeterminate until inspection can be performed. This as noted in Question set #5, Q #1 this bid document nomenclature needs to be remove from the bid documents, or an allowance be declared and will be applied in the bid. Please advise.
Answer 14: Final Clarification is as follows. Boiler bottom will be insulated as stated on M3 Boiler #2 Demo note 9. Any additional repairs to the steel plate bottom will be considered unforeseen site conditions and shall be addressed as a modification negotiated at that time.
Question 15: Reference Q&A Addendum #2, Q/A #5. Review of answer from duct fabrication supplier need an answer what is the existing duct size the FDFD#2 fan will connect to, and for lack of requested submittal data from manufacture of the fan. The assumption is the new fans will direct connect to the existing ductwork with no transition piece needed. Please confirm this assumption.
Answer 15: If Force Draft Fan for Boiler #2 matches that of Boiler #3, and #4 it should connect directly to existing ducting.
Question 16: Reference Q&A Addendum #2, Q/A #12, 13, Question below Question set #3, item #4.
Review of answer by manufacture has noted (question not completed).
Answer 16: Again, the pressures noted on M6 are in PSIA. This equates to a -.7 to 0 psi range on EX- J1 and a 0 to .5 psi range on EX-J2.
Question 17: Site visit indicated that Boiler #2 Hot/Cool Air Ducting are to be demolished but Drawing M- 3 does not indicate this. Please clarify.
Answer 17: The drawings are to be followed.
Question 18: Ducting from Induced Draft Fan Damper down to Mechanical Duster Collector is presumed Asbestos Containing Materials on Boiler #2, Drawing M-3, Note 5?
Answer 18: The mechanical dust collector is the only thing believed to contain lead/asbestos. Any additional lead/asbestos found would need to be addressed at that time. If contractor believes an item contains lead/asbestos, Government representative can have item tested.
Question 19: Can acetylene torches be used during demolition?
Answer 19: Acetylene torches are acceptable but need to be addressed in the submitted safety plan.
Question 20: Reference drawing M1, Note #8, 9. The requirement is to inspect and repair bottom boiler plate as necessary. Boiler repair is an unknown issue until inspected and thus not price-able until the inspection is able to be completed. The requirement for inspection and repairs is unknown at this point.
This item needs to be removed from the bid documents for consideration after bottom plate is exposed and the inspection can start. Full consideration specification and certification are needed to perform inspection and repairs to the boiler. Please advise.
Answer 20: Note #9 does not quantify a number or type of repair. Any required repairs not currently known will be addressed through a modification after removal of the ash hopper and inspection. Price the requirement based on the current Statement of Work and Amendments.
Question 21: Reference drawing M1, Note Option 1, Option 2. Please confirm the wording is correct.
Appears to have some carry over items that make the read in question. Option #1 is for boiler #3 but contains references to boiler #2, Option #2, is for boiler #4 but contains references to boiler #3.
Answer 21: To clarify--Option One is for Boiler #3, Remove Ash Hopper. Option Two is for Boiler #4, Remove Ash Hopper. These options will be awarded or closed after inspection of Boiler #2 steel plate. It is anticipated that the conditions of Boiler #2 steel plate will determine whether or not Options One and Two are to be exercised.
*****END OF AMENDMENT 0003*****