Amendment_0002.pdf

PDF 54 KB Posted

Attached to
Repair Air System for Boilers #2, 3, and 4 Federal contract opportunity
Solicitation number
FA9101-14-B-0008
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Repair Air System for Boilers #2, 3, and 4, newest first.
File Type Posted
Amendment_4 _Q A_and_Due_Date.pdf PDF
Site_Visit_Roster _22_August_2014.pdf PDF
Amendment_03 _Site_Visit_etc..pdf PDF
4_5.JPG JPG image
2_9.JPG JPG image
2_14.JPG JPG image
3_1.JPG JPG image
2_1.JPG JPG image
4_1.JPG JPG image
Amendment_0001.pdf PDF
3_5.JPG JPG image
4_3.JPG JPG image
3_6.JPG JPG image
1_1.JPG JPG image
2_6.JPG JPG image
2_11.JPG JPG image
1_6.JPG JPG image
4_2.JPG JPG image
2_8.JPG JPG image
2_12.JPG JPG image
3_3.JPG JPG image
1_4.JPG JPG image
1_7.JPG JPG image
2_7.JPG JPG image
2_16.JPG JPG image
2_2.JPG JPG image
3_2.JPG JPG image
1_5.JPG JPG image
2_5.JPG JPG image
2_4.JPG JPG image
1_3.JPG JPG image
2_15.JPG JPG image
Attachment_2 _Drawings.pdf PDF
Attachment_1 _Statement_of_Work_13437-13-003_Rpr_Boilers_2-3-4_Air_Syspdf.pdf PDF
Attachment_3 _U.S._DOL_Wage_Determination.pdf PDF
Solicitation.pdf PDF
Attachment_4 _Bid_Bond.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

15 AUG 2014

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY AFTC PZI ARNOLD CODE FA9101 7. ADMINISTERED BY (If other than Item 6) CODE

AFTC PZI ARNOLD

100 KINDEL DRIVE, SUITE A-332

ARNOLD AFB, TN 37389-1332

REBECCA J. GARDNER 931-454-4405

REBECCA.GARDNER.1@US.AF.MIL

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

FA9101-14-B-0008

X

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X )

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM

10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to extend the Bid Opening Date, provide an additional site visit, correct information on the photos posted in Amendment 0001, and post questions and answers. Please acknowledge this amendment in your bid.

See Page Two for details.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

REBECCA J. GARDNER

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.14.1 FAR (48 CFR) 53.243 Created 15 Aug 2014 2:34 PM

SCHEDULE OF CHANGES

FA9101-14-B-0008 0002

AMENDMENT #2

Boiler #2, 3, and 4 Air Systems

QUESTIONS AND ANSWERS

15 August 2014

The purpose of this amendment is to extend the Bid Opening Date, provide an additional site visit, correct information on the photos posted in Amendment 0001 and to provide questions and answers. Please acknowledge this amendment in your bid.

A. SOLICITATION RESPONSE DATE

1. The Bid Opening Date for this requirement is being extended to 3 September 2014 no later than 2:00pm CST.

B. SITE VISIT

1. Another site visit will be scheduled. Information on this site visit will be posted next week via an amendment. Please continue to check www.FBO.gov for details.

C. CORRECTION

1. In regards to pictures posted from previous amendment. Pictures 3_2-7 should be omitted. The ducting in these pictures IS NOT to be removed.

D. QUESTIONS AND ANSWERS

Question 1: Solicitation item # 0002, 0003 notes boiler 3 & 4 to remove ash hopper though no drawings are found that indicated in the SOW to remove ash hopper from Boiler 3 & 4. Is the ash hopper of boilers 3 & 4 the same as boiler #2? Please advise or confirm.

Answer 1: Note drawings M1 and M3 for ash hopper 3 & 4 details. If options 1 & 2 are awarded then boiler 3 & 4 ash hopper will be removed. Ash hopper 3 & 4 are identical to ash hopper 2.

Question 2: Please extend the project bid date 10 additional working days.

Answer 2: AF PM is ok with bid due date extension.

Question 3: Reference drawing M3, Boiler #2 Demolition notes #9: By this note it is assumed that a plate exists in the bottom of the boiler at the ash hopper. The SOW is only to insulate after the ash hopper is removed. Please confirm.

Answer 3: See demolition notes on M1. With unknown conditions of the plates, a modification would be completed if work required was greater than what is listed in the spec. We spec that the plates will be insulated after the ash hopper is removed and if minor holes exist they will be patched/sealed.

Question 4: Drawing M5, Detail G/M5, Drawing M7 Installation note 7, at top of duct transition piece to existing F.D. Ductwork: This dimension to the existing duct is not found in the drawings/bid docs. What is the dimension of this existing ductwork so the connective transition part can be sized and priced correctly?

Answer 4: See drawing M6 for table titled Expansion Joint Schedule, Boiler 2.

Question 5: Drawing M8, Detail F/M8, at top of duct transition piece to existing Ductwork:

This dimension to the existing duct is not found in the drawings/bid docs. What is the dimension of this existing ductwork so the connective transition part can be sized and priced correctly?

Answer 5: See drawing M6 for table titled Expansion Joint Schedule, Boiler 2.

Question 6: Drawing M8, Detail 4/M8. Detail of duct wall notes a angle iron stiffener. What is the material size, type of material and requirements where to be use of this stiffener? Please advise.

Answer 6: Duct stiffeners will need to match those found on Boilers 3 & 4. I do not have access to these parts while boilers 3 & 4 are currently in operation. Please attempt to estimate requirements and bid appropriately. We will confirm prior to starting construction.

Question 7: For demo and installation, a crane will be needed for the elevated work and material placement. What is the access availability and placement location for a crane to perform the SOW? Please advise and provide a site plan for crane placement.

Answer 7: There is space off the North East Corner of the building that is sufficient for crane operation.

Question 8: For demo and installation, a scaffolding system needed to be erected. Are there any special requirements or concerns for use of scaffolding? Please confirm assumption of no special requirements.

Question 8: A scaffolding plan will need to be submitted with the safety plan.

Question 9: Reference drawing M3, Boiler #2 elevation plan. Top of I.D. Fan boiler #2 indicates an expansion joint. Please confirm that the stack above expansion joint is to be left in place for the SOW and the stack above is supported by overheat structures with no change to the mounting to the exist stack.

Answer 9: Concur. Everything above the expansion joint is to be left as is and is supported separate from the ID Fan.

Question 10: Reference drawing M3, Boiler #3 & 4 elevation plan: For the SOW on boiler #2 please confirm the building structure is the same as shown on Boiler 3 & 4 Elevation Demo plan of the same page.

Answer 10: Concur. Structure above and around Boiler 2 is identical to that of Boilers 3&4.

Question 11: Can roof or side wall panels be removed to perform equipment rigging for the

SOW.

Answer 11: Removal of roof or side wall panels is unnecessary and is not permitted. Rigging and access to 4 th floor where ID fans are located can be accomplished by using double doors that open to partial 3 rd floor roof top. See pics 4_3 and 4_5 for doors located next to ID Fan 2.

Question 12: Reference drawing M6, Expansion joints EX-J1 (2 ea), EX-J2 (1 ea). Per manufacture the schedule for design pressure noted at 14 to 14.7 (PSIA) is not available in this model. The recommended pressure is 14" WC. Please confirm this acceptable. See attached for manufacture configuration.

Answer 12: The drawing is correct. Design pressure is 14-14.7PSIA. I noticed in the email attachment the FLEXCOM contact stated 14.7PSIG. I believe this may be the issue.

Question 13: Reference drawing M6, Expansion joints EX-J1 (2 ea), EX-J2 (1 ea). Per manufacture the schedule for frame noted at "Internal - J", is not configured to U-Belt type.

Please advise. See attached for manufacture configuration.

Answer 13: The drawing is correct. The information is directly from the manufacturer.

*****END OF AMENDMENT 0002*****

File details come from the government source that posted it. Updated .