Amendment_4 _Q A_and_Due_Date.pdf

PDF 218 KB Posted

Attached to
Repair Air System for Boilers #2, 3, and 4 Federal contract opportunity
Solicitation number
FA9101-14-B-0008
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Amendment 0004 Questions and Answers and Extending Bid Opening Date

View the file

Other files for this federal contract opportunity

Other files attached to Repair Air System for Boilers #2, 3, and 4, newest first.
File Type Posted
Site_Visit_Roster _22_August_2014.pdf PDF
Amendment_03 _Site_Visit_etc..pdf PDF
Amendment_0002.pdf PDF
4_5.JPG JPG image
2_9.JPG JPG image
2_14.JPG JPG image
3_1.JPG JPG image
2_1.JPG JPG image
4_1.JPG JPG image
Amendment_0001.pdf PDF
2_4.JPG JPG image
1_3.JPG JPG image
2_15.JPG JPG image
4_2.JPG JPG image
2_8.JPG JPG image
2_12.JPG JPG image
3_3.JPG JPG image
1_4.JPG JPG image
1_7.JPG JPG image
2_7.JPG JPG image
2_16.JPG JPG image
2_2.JPG JPG image
3_2.JPG JPG image
1_5.JPG JPG image
2_5.JPG JPG image
3_5.JPG JPG image
4_3.JPG JPG image
3_6.JPG JPG image
1_1.JPG JPG image
2_6.JPG JPG image
2_11.JPG JPG image
1_6.JPG JPG image
Attachment_2 _Drawings.pdf PDF
Attachment_4 _Bid_Bond.pdf PDF
Attachment_3 _U.S._DOL_Wage_Determination.pdf PDF
Solicitation.pdf PDF
Attachment_1 _Statement_of_Work_13437-13-003_Rpr_Boilers_2-3-4_Air_Syspdf.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

02 SEP 2014

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY AFTC PZI ARNOLD CODE FA9101 7. ADMINISTERED BY (If other than Item 6) CODE

AFTC PZI ARNOLD

100 KINDEL DRIVE, SUITE A-332

ARNOLD AFB, TN 37389-1332

REBECCA J. GARDNER 931-454-4405

REBECCA.GARDNER.1@US.AF.MIL

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

FA9101-14-B-0008

X

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X )

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM

10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide Questions and Answers and to extend the Bid Opening date to 11 September 2014. See page two for details.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

REBECCA J. GARDNER

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.14.1 FAR (48 CFR) 53.243 Created 02 Sep 2014 2:50 PM

SCHEDULE OF CHANGES

FA9101-14-B-0008 0004

AMENDMENT #4

Boiler #2, 3, and 4 Air Systems Questions and Answers

2 September 2014

The purpose of this amendment is to provide technical question and answer and to extend the bid opening.

A. BID OPENING

1. The Bid Opening is extended to 11 September 2014 at 2:00PM CST. All Bids and 20% Bid Bonds must be received by this due date and time. Late Bids will not be accepted.

2. In order to deliver bids, offerors need to register to receive a base access badge. Please contact the Contracting Officer at Rebecca.Gardner.1@US.AF.MIL or 931-454-4405 to request base access. Please indicate whether or not you are a US Citizen. Access approval for Non-US Citizens may take 15-30 days for approval.

3. The lowest priced offeror who is responsive to the solicitation will be asked to verify their price in writing (via e-mail) no later than 2:00PM CST the day following Bid Opening in order to verify that there were no mistakes in bid in accordance with Federal Acquisition Regulation (FAR) paragraph 14.407-1, Mistakes in Bids - General. Any mistakes in bid will be processed in accordance with FAR 14.407.

B. AMENDMENT

1. Please acknowledge all amendments in your Bid either by signing blocks 15a,b, and C on page one of the amendment or completing Block 19 on page two of the solicitation, Standard Form 1442.

C. QUESTIONS AND ANSWERS

Question 1: Please clarify the asbestos contained in the ash hoppers.

Answer 1: Perform asbestos removal for insulation lining the metal skins of the upper soot / ash hopper and associated ducting for boiler #2. Main level ash hoppers for boilers # 2, 3, and 4 will have bricks and other debris containing asbestos as well as the insulation lining the metal skins. The debris containing asbestos is believed to fill 50% -75% of the main level ash hoppers for boilers # 2, 3, and 4.

Question 2: Reference drawing M6, scheduled equipment dampers (IDFD-2,3,4), specified manufacture by Ruskin is missing model numbers in the schedule. Thus with missing scheduled details the dampers is proposed as a design build item with interpolation by manufacture for the functionally. In this case some of the listed specs do not mate up to all items of the schedule spec. Please complete the equipment schedule to provide manufacture and model for the required dampers IDFD - 2,3,4, concur on what has been proposed and or advise. The recommendation at this point with 2 working days before bid date is to concur with what is proposed and if necessary work out further issues in the submittal process.

Answer 2: All offerors should bid equipment as specified (and/or amended) and any material issues will be addressed through the submittal process.

SCHEDULE OF CHANGES

FA9101-14-B-0008 0004

D. SUBMISSION OF QUESTIONS

1. Based on the current extension of the bid opening date all final questions are to be submitted by 2:00PM CST on 4 September 2014.

2. All questions must be received in writing. Any questions answered at the site visit are not contractually binding unless those questions are submitted in writing and answered through an amendment to the solicitation. Submit questions to the Contracting Officer at Rebecca.Gardner.1@US.AF.MIL.

*****END OF AMENDMENT 0004*****

File details come from the government source that posted it. Updated .