12420-08-001A Rpl Windows Bldg 350-Spec.pdf
PDF 1 MB Posted
- Attached to
- Replace PMEL and Decade Windows
- Solicitation number
- FA9101-08-B-0013
About this file
Attachment 1 - General Specification for Replace PMEL Windows
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CE Pics.zip | ZIP file | |
| wage determination.pdf | ||
| 10989-05-001B Replace Decade Windows Spec and Dwgs.pdf | ||
| FA9101-08-B-0013.pdf | ||
| sf24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12420-08-001A
SPEC NO. 12420-08-001A
29 May 2008
GENERAL SPECIFICATION
FOR
REPLACE PMEL WINDOWS
FACILITY 350
AEDC
ARNOLD ENGINEERING DEVELOPING CENTER
ARNOLD AIR FORCE BASE, TENNESSEE 37389-9998
NOT AEDC STINFO
Attachment 1
ANZY080082 INDEX-1
INDEX
DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary 01 33 00 Submittal Procedures 01 45 00 Regulatory Requirements
DIVISION 02 SITE CONSTRUCTION
02 08 00 Asbestos Removal 02 08 50 Lead Removal 02 41 19 Selective Structure Demolition
DIVISIONS 03 - 07 NOT USED
DIVISION 08 OPENINGS
08 63 05 Blast Resistant Metal-Framed Windows
DIVISIONS 09 - 49 NOT USED
Attachment A Example: Blast Resistant FIXED Window Unit Details Attachment B Example: Blast Resistant OPERABLE Window Unit
Details Attachment C PMEL Building Windows (Facility 350)
ANZY080082 01 10 00-1
SECTION 01 10 00
SUMMARY
PART 1 - GENERAL
1.1 Provide all materials, equipment, and labor for the removal of existing windows units and replacement with new blast resistant, double pane, insulated, 6mm (minimum) thick laminated glass (at interior pane), metal frame, window units, for PMEL Facility (Building 350) at Arnold Engineering Development Center, Arnold Air Force Base, Tennessee. The extent of the work is contained in the drawings and specifications. Major items of work include, but are not limited to, the following:
A. Selective demolition of 12 existing window/frame assemblies (each window is approx. 5’ x 6’, and windows are ganged together).
B. Lead/Asbestos removal (treat adjacent painted surfaces and caulking of windows as containing lead/asbestos).
C. Installation of 12 new blast resistant window units, frames, and associated sealants/flashing.
D. Other incidental tasks and repair necessary to complete the work as required by the specifications and drawings.
1.2 CODES AND STANDARDS
A. AEDC Safety Standard*:
1. A6 with Supplement User and Subcontractor Safety (Mandatory
Documents/Submittals), 2007.
2. B1 Master Work Permit, 2007.
3. B2 Logout Tagout (LOTO), 2007.
4. D1 Powered Industrial Trucks, 2008.
5. D8 Portable Power Tools, 2007.
6. D9 Fixed and Portable Ladders, 2008.
7. D10 Scaffolds, 2007.
8. E18 Managing Wastes Containing Chemical or
Petroleum Products, 2007.
9. F2 Personal Protection Equipment (PPE), 2007.
10. F5 Annex A Hazardous Noise and Hearing Conservation, 2007.
11. F6 Fall Protection, 2008.
* The Government representative will furnish a copy of this Safety Standard to the contractor upon request.
B. Air Force Federal Acquisition Regulation (AFFARS):
1. 5352.223-9000 Elimination of Use of Class I Ozone Depleting
Substances (ODS), April 2003.
ANZY080082 01 10 00-2
C. Code of Federal Regulations (CFR):
1. 29 CFR 1926.1101 Asbestos, 2007.
2. 40 CFR 261 Identification and Listing of Hazardous Waste, 2007.
3. 40 CFR 370 EPA Hazardous Chemical Reporting and
Community Right to Know Requirement, 2007.
D. U. S. Army Corp of Engineers:
1. CoE EM 385-1-1 Safety and Health Requirements Manual, 2003.
E. Unified Facilities CriteriaSteel (UFC):
1. UFC 4-010-01-03 DoD Minimum Antiterrorism Standards for
Including Change 1, Buildings.
22 January 2007
1.3 RECORD (AS-BUILT) DRAWINGS
A. Furnish record drawings showing final configuration of work accomplished.
Show all changes, additions, and deviations from the original drawings. If no changes occur, furnish certification to that effect. Submit to the Contracting Officer for approval prior to applying for final payment Drawings may be redlined hardcopies or electronic drawings. If electronic, furnish drawings on a CD-ROM in AutoCAD 2005 format or later accurately showing as-built conditions during the progress of the job. The CD-ROM shall include every associated component file of the drawings including raster images, jpeg, tif, excel, and any related items required to view, modify, or manipulate the electronic files.
1.4 DEFINITIONS
A. Certain terms used in the contract documents are defined in the following paragraphs. Definitions and explanations contained in this section are not complete, but are general for the work to the extent that they are not stated more explicitly in another element of the contract documents.
1. Furnish. The term "furnish" means to supply and deliver to the project site, ready for unloading, unpacking, assembly, installation, and similar operations.
2. Install. The term "install" describes operations at the project site, including the actual unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimensions, finishing, curing, protecting, cleaning, and similar operations.
3. Provide. The term "provide" means "provide complete in place"; that is, "furnish and install.”
4. Indicated. Where "as indicated" or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise.
ANZY080082 01 10 00-3
1.5 JOB CONDITIONS
A. Plan and execute this project in a manner to minimize downtime. Furnish new components and devices, complete, with all necessary materials for installation to meet this objective. Schedule all work in advance with the Government representative. Facility will be occupied.
B. Keep work area clean and free from waste and debris. Dispose of waste as directed by the Government representative.
C. Submit sketches of proposed scaffolding, if utilized. All scaffolding shall be in accordance with AEDC Safety Standard D10 and shall be inspected, approved, and tagged by AEDC Safety representative after it has been erected and prior to use.
1.6 PROTECTION OF EXISTING IMPROVEMENTS:
A. Protection of the grounds, walkways and structures from deterioration due to excessive vehicular traffic, equipment disturbance, and material staging is critical to maintaining the quality appearance of AEDC. The contractor shall protect against damage incurred by service vehicles, construction activities, maintenance and repair, and all other work that detracts from the overall appearance of the grounds and increases the costs of grounds maintenance.
B. Prior to commencement of work, inspect areas in which work will be performed. File a report with the Contracting Officer listing existing conditions which could be construed as damage resulting from the work.
The Government representative may also photograph or video tape areas or improvements susceptible to damage to document conditions prior to the start of work.
C. The activity of vehicles and equipment on the grounds shall be limited to only that which is essential and required for completing the work. The Government representative will approve all access and haul routes required for the work prior to any on site operations to preclude damage to sensitive utilities or improvements which may not be readily apparent.
D. Minimize travel paths and staging areas to limit the impact and damage to work areas. Lay out the work site, material and equipment staging, and vehicle and equipment activity to minimize visibility and aesthetic impact of activities to surrounding areas.
E. Protect above and below grade utilities, plant life, lawns, and other features or improvements to remain.
F. Protect benchmarks, existing structures, sidewalks, curbs, and pavements from excavation equipment and vehicular traffic.
ANZY080082 01 10 00-4
G. Use protective materials, such as sheeting, steel plating, rigger pads, to protect grounds and pavement from heavy equipment activity and damage.
H. Implement a daily procedure for area clean up and organized parking of vehicles and equipment.
I. Provide temporary barricades, shoring, bracing, supports or other forms of protection as required to protect all existing improvements not scheduled to be demolished for both above and below ground improvements and to prevent movement, settlement, collapse or damage of any kind.
J. Maintain personnel and vehicular access and existing utilities to all buildings and other structures during the course of the work. Any changes or interruptions shall be coordinated and approved by the Government representative well in advance. Temporary protections or services may be required as a condition of approval of any such change or interruption.
K. The contractor shall be responsible for damage caused by the work and shall repair or replace same to the satisfaction of the Government. Obtain Government representative’s approval of methods, materials, equipment or products for repair or replacement prior to use. All such repair or replacement will be performed promptly at no additional cost to the Government. The Government will place special emphasis and requirements for repair or replacement of damage to underground utilities, lawns, grassed areas, existing structures, sidewalks, curbing, railings and pavements.
L. Remove all temporary barricades, shoring, bracing, supports or other forms of protection at completion of work. Restore all adjacent structures and surfaces to conditions existing prior to construction. Clean up all stockpiles and spoil areas, and restore all surrounding areas to conditions existing prior to construction.
1.7 ASBESTOS PRODUCTS
A. Do not use products or materials that contain asbestos on this project except as expressly authorized by the Contracting Officer. If no substitutes for asbestos products are available, and the Contracting Officer approves the use of asbestos products, highlight and detail their exact location on the drawings and identify their location in the field following 29 CFR 1926.1101 guidelines.
1.8 HAZARDOUS WASTE
A. Where hazardous waste (as identified in 40 CFR 261) is generated, follow the procedures in AEDC Safety Standard E18, Chemical and Petroleum Products Waste Management, for storing and turning in hazardous waste.
These procedures include the requirement to complete Forms GC-565 and GC-1337, which will be furnished by the Government representative.
ANZY080082 01 10 00-5
1.9 DISALLOWED PRODUCTS
A. Do not use products or materials that contain lead, chromium, mercury, cadmium, silver, barium, or arsenic on this project except as expressly authorized by the Contracting Officer. If no substitutes for products containing the listed materials are available, and the Contracting Officer approves the use of products containing the listed materials, highlight and detail their exact location on the drawings.
1.10 ELIMINATION OF ODS
A. The use of Class I ozone depleting substances (ODS) is prohibited.
Reference text of AFFARS clause 5352.223-9000 (April 2003).
1.11 SAFETY REQUIREMENTS:
A. All work shall be accomplished in compliance with AEDC Safety Standards A6 with supplement, B1, B2, D1, D8, D9, D10, F2, F5, and F6. Provide a safety and health program in compliance with CoE EM 385-1-1.
1.12 TOOL CONTROL REQUIREMENTS
A. Coordinate tool control requirements with the Government representative.
1.13 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
A. The following procedures shall be followed to meet 40 CFR 370, EPA Hazardous Chemical Reporting and Community Right to Know Requirement.
1. Procedures:
a. The contractor shall provide information on the hazardous materials he brings on AEDC property prior to beginning on-site work.
Hazardous materials may include solvents, paints, adhesives, acids, or any other substance which could be included within the definitions in paragraph 2.
b. The information required is:
1) Company name, point of contact, and phone number.
2) Brief statement indicating how the hazardous material will be used within the scope of the contract.
3) List of all hazardous materials to be used (product name, manufacturer’s name, and address).
4) Amount of each material to be stored on site and where it will be stored.
5) Where the product Material Safety Data Sheets (MSDS) will be maintained.
c. All unused product is the responsibility of the contractor and shall be removed from AEDC property at the completion of the project.
ANZY080082 01 10 00-6
d. The contractor shall coordinate with the Government representative and the Hazardous Waste Operations Group (454-3628) if any hazardous waste is to be generated.
2. Definitions
a. Hazard communication standard. A chemical right-to-know law under OSHA that requires chemical manufacturers and importers to assess the hazards of chemicals they make or import and to distribute this information to inform workers of the hazards associated with these chemicals. This written information is a Material Safety Data Sheet (MSDS).
b. Hazard classes. Hazardous materials that have been grouped into classes by the Department of Transportation (DOT). These classes include explosives, flammables, oxidizers and organic peroxides, compress gases, corrosives, and poisons.
c. Hazardous material. Any substance that may be harmful when used. Specific substances have been designated as hazardous under the Clean Water Act, the Resource and Conservation and Recovery Act, and the hazardous air pollutants under the Clean Air Act.
d. Hazardous waste. Any waste that may cause or significantly contribute to serious illness or death or that may pose a substantial threat to human health or the environment, if not properly managed.
Hazardous wastes may be solids, liquids, semi-solids, or compressed gases.
END OF SECTION
ANZY080082 01 33 00-1
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 DESCRIPTION OF REQUIREMENTS. This section specifies procedural requirements for non-administrative submittals, including shop drawings, product data, samples, and other miscellaneous work-related submittals. These submittals are required to amplify, expand, and coordinate other information contained in the contract. Non-work-related submittals are addressed elsewhere in the contract rather than in the specification and may include items such as:
contract progress schedule, permits, payment applications, performance and payment bonds, insurance certificates, and progress reports.
A. Shop drawings. These are technical drawings and data specially prepared for this project including fabrication and installation drawings, setting and seaming diagrams, and coordination drawings (for use on-site).
B. Product data. This data includes standard printed information on manufactured products that has not been specially prepared for this project, including manufacturers' product specifications and installation instructions, standard color charts, catalog cuts, standard wiring diagrams, and standard product operating and maintenance manuals.
C. Samples. These are physical examples of work, including swatches showing color, texture, and pattern; color-range sets; and units of work to be used for independent inspection and testing.
D. Miscellaneous submittals. These are work-related, non-administrative submittals that do not fit in the three previous categories, including the following:
1. Maintenance agreements.
2. Survey data and reports.
3. Project photographs.
4. Record drawings (as-built drawings).
5. Field measurement data.
6. Operating and maintenance manuals.
7. Keys and other security protection devices.
8. Maintenance tools and spare parts.
9. Overrun or maintenance stock.
10. Qualification certificates.
1.2 SUBMITTAL PROCEDURES
A. Coordination. Coordinate the preparation and processing of submittals with the performance of the work. Coordinate each submittal with other submittals and related activities, such as testing, purchasing, fabricating, and delivering, that require sequential activity.
ANZY080082 01 33 00-2
B. Listing. At the end of this section is a summarized listing of the submittals required for the work. The listing is included for the convenience of users of the contract documents.
C. Transmittal timing. Prepare and transmit each submittal to the Contracting Officer sufficiently in advance of the scheduled performance of related work and other applicable activities. Transmit different kinds of submittals for the same unit of work so that processing will not be delayed by the Government's need to review submittals concurrently for coordination.
D. Review time. Allow sufficient time so that contract performance will not be delayed as a result of the time required to properly process submittals, including time for re-submittals, if necessary. Allow 10 working days for initial Government processing of each submittal. No extension of time will be authorized because of the contractor's failure to transmit submittals to the Government sufficiently in advance of the work.
E. "Approval" submittals. Submittals requiring approval by the Contracting Officer are so designated in the applicable sections and the submittal list at the end of this section. When brand names or equal are specified, any "equal" submitted will require approval. Any submittal requesting a deviation will require approval. Do not install any equipment or material requiring approval submittals until approvals are received from the Contracting Officer. The Government will status receipt or approval of all submittal requirements in the last two columns.
F. "Information only" submittals. Submittals not requiring the Contracting Officer's approval are considered to be "information only" submittals.
1.3 SPECIFIC SUBMITTAL REQUIREMENTS. Submittal requirements for individual units of work are specified in the applicable specification section. Except as otherwise indicated in the individual sections, comply with the following requirements for each type of submittal.
A. Shop drawings. Information required on shop drawings includes dimensions, identification of specific products and materials which are included in the work, compliance with specified standards, and notations of coordination requirements with other work. Provide special notations of dimensions that have been established by field measurements. Highlight, encircle, or otherwise indicate deviations from the contract documents on the shop drawings. Furnish one reproducible and four copies.
B. Product data. General information required specifically as product data includes manufacturers' standard printed recommendations for application and use, compliance with recognized standards of trade associations and testing agencies, the application of their labels and seals (if any), special notation of dimensions which have been verified by way of field
ANZY080082 01 33 00-3
measurement, and special coordination requirements for interfacing the material, product, or system with other work. Furnish four copies.
C. Samples. Submit samples for the Contracting Officer's visual review of general kind, color, pattern, and texture for a final check of the coordination of these characteristics with other related elements of the work and for quality control comparison of these characteristics between the final sample submittal and the actual work as it is delivered and installed.
D. Miscellaneous submittals. These submittals include the following:
1. Inspection and test reports. Furnish three copies of such reports.
2. Record drawings.
3. Operating and maintenance data. Furnish three bound copies of operating data and maintenance manuals.
4. Materials and tools. Refer to individual sections of the specification for required quantities of spare parts, extra and overrun stock, maintenance tools and devices, keys, and similar physical units to be submitted.
5. Certifications, reports, instructions, and lists. Furnish three copies of such submittals.
1.4 REQUIRED SUBMITTALS
No. Section Reference Submittal Description App Info 1 01 10 00 para 1.3A Record Drawings X 2 01 10 00 para 1.5C Proposed Scaffolding X 3 01 10 00 para 1.6B Existing Conditions Report Which could be
Construed as Damage Resulting from Work X
4 01 10 00 para 1.7.A Asbestos Locations X 5 01 10 00 para 1.8.A Forms GC-565 and GC-1337 X 6 01 10 00 para 1.9.A Disallowed Products Locations X 7 01 10 00 para 1.11.A Safety and Health Plan X 8 01 10 00 para 1.12.A.1.a Hazardous Material Info X 9 02 08 00 para 1.3A Employee Certification X
10 02 08 00 para 1.3B Training and Medical Certifications X 11 02 08 00 para 1.3C Training and Hazard Communications
Certification X
12 02 08 00 para 1.3D Product List X 13 02 08 00 para 1.3E Equipment List X 14 02 08 00 para 1.3F Notice of Violation X 15 02 08 00 para 1.3G Environmental, Health, and Safety Plan X 16 02 08 00 para 1.3H Asbestos Removal Plan X 17 02 08 00 para 1.3I Air Sampling Reports X 18 02 08 00 para 1.3J Testing Certifications X
Table I. Required submittal list - Continued
ANZY080082 01 33 00-4
No. Section Reference Submittal Description App Info 19 02 08 00 para 1.3K CPR Certification X 20 02 08 00 para 1.3L Insurance Coverage Certification X 21 02 08 00 para 1.3M Sampling List X 22 02 08 00 para 1.3N Operator’s Log and Shipper’s Log X 23 02 08 00 para 1.3O Daily Logs: Sign-In and Field Notes X 24 02 08 50 para 1.4A Employee Certification X 25 02 08 50 para 1.4B Training and Medical Certification X 26 02 08 50 para 1.4C Notice of Violation X 27 02 08 50 para 1.4D Environmental, Health, and Safety Plan X 28 02 08 50 para 1.4E Training and Hazard Communications
Certification X
29 02 08 50 para 1.4F Product List X 30 02 08 50 para 1.4G Lead Abatement Plan X 31 02 08 50 para 1.4H Air Sampling Reports X 32 02 08 50 para 1.4I Testing Certifications X 33 02 08 50 para 1.4J Air Monitoring Results X 34 02 08 50 para 1.4K Equipment List X 35 02 08 50 para 1.4L Rental Equipment List X 36 02 08 50 para 1.4M Shower Water Test Results X 37 08 63 05 para 1.5A Shop Drawings X 38 08 63 05 para 1.5B Product Data X 39 08 63 05 para 1.5C Samples X 40 08 63 05 para 1.5D Design Data X 41 08 63 05 para 1.5E Manufacturer’s Certificate X 42 08 63 05 para 1.5F Warranty X
Table I. Required submittal list - Completed.
ANZY080082 01 45 00-1
SECTION 01 45 00
REGULATORY REQUIREMENTS
PART 1 - GENERAL
1.1 This section lists regulations, codes, and standards which specify procedural and administrative requirements imposed upon the work.
1.2 The contractor shall comply with provisions of the following documents to the extent referenced herein.
A. Government documents:
1. AEDC Safety Standards*:
a. A6 with Supplement User and Subcontractor Safety (Mandatory Documents/Submittals), 2007.
b. A9 Hazard Communication, 2006.
c. B1 Master Work Permit, 2007.
d. B2 Logout Tagout (LOTO), 2007.
e. B5 Confined Spaces, 2007.
f. D1 Powered Industrial Trucks, 2008.
g. D8 Portable Power Tools, 2007.
h. D9 Fixed and Portable Ladders, 2008.
i. D10 Scaffolds, 2007.
j. E7 Asbestos, 2007.
k. E17 Oil and Hazardous Substances Spill
Response, 2007.
l. E18 Managing Wastes Containing Chemical or
Petroleum Products, 2007.
m. E19 Lead and Heavy Metals, 2006.
n. F2 Personal Protection Equipment (PPE), 2007.
o. F5 Annex A Hazardous Noise and Hearing
Conservation, 2007.
p. F6 Fall Protection, 2008.
* The Government representative will furnish a copy of these Safety Standards to the contractor upon request.
2. Air Force Federal Acquisition Regulations (AFFARS):
a. 5352.223-9000 Elimination of Use of Class I Ozone
Depleting Substances (ODS), April 2003.
3. Code of Federal Regulations (CFR):
a. 29 CFR 1910.134 Respiratory Protection, 2007.
b. 29 CFR 1910.1200 Hazard Communication, 2007.
c. 29 CFR 1926.1101 Asbestos, 2007.
d. 29 CFR 1926.55 Gases, Vapors, Fumes, Ducts, and Mists, 2007.
e. 29 CFR 1926.57 Ventilation, 2007.
ANZY080082 01 45 00-2
f. 29 CFR 1926.59 Hazard Communications, 2007.
g. 29 CFR 1926.62 Lead Standard, 2007.
h. 40 CFR 61 National Emission Standards for Hazardous
Air Pollutants (NESHAP), 2007.
i. 40 CFR 260 Hazardous Waste Management Systems:
General, 2007.
j. 40 CFR 261 Identification and Listing of Hazardous
Wastes, 2007.
k. 40 CFR 262 Generators of Hazardous Waste, 2007.
l. 40 CFR 370 EPA Hazardous Chemical Reporting and
Community Right to Know Requirement, 2007.
m. 49 CFR 172 Department of Transportation (DOT) Regulations for Use of Hazardous Materials Tables and for Communication, 2007.
n. 49 CFR 178 DOT Specifications for Packaging, 2007.
4. Environmental Protection Agency Document:
a. EPA SW-846 Test Methods for Evaluating Solid Waste, Physical/Chemical Methods, 2004.
5. Public Law:
a. PL 101-637 The Asbestos School Hazard Abatement
Reauthorization Act (ASHARA), 1990.
6. Tennessee Department of Environment and Conservation:
a. Chapter 1200-3-11-02 Hazardous Air Contaminants, Asbestos, 2006.
7. U. S. Army Corp of Engineers:
a. CoE EM 385-1-1 Safety and Health Requirements Manual, 2003.
B. Non-Government documents:
1. American Architectural Manufacturers Association:
a. AAMA 611-98 Anodized Architectural Aluminum.
2. American Industrial Hygiene Association:
a. AIHA Z9.2-06 Fundamentals Governing the Design and Operation of Local Exhaust Systems.
3. American Society of Mechanical Engineers:
a. ASME A13.1-07 Scheme for the Identification of Piping
Systems.
4. ASTM International:
a. ASTM A123-02 Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products.
b. ASTM E283-04 Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen.
c. ASTM E330-02 Structural Performance of Exterior Windows, Doors, Skylights, and Curtain
ANZY080082 01 45 00-3
Walls, by Uniform Static Air Pressure Difference.
d. ASTM E1105-00 Field Determination of Water Penetration of Installed Exterior Windows, Skylights, Doors, and Curtain Walls, by Uniform or Cyclic Static Air Pressure Difference.
e. ASTM E1300-07 Determining Load Resistance of Glass in Buildings.
f. ASTM F2248-03 Standard Practice for Specifying an Equivalent 3-Second Duration Design Loading for Blast Resistant Glazing Fabricated with Laminated Glass.
5. Steel Structures Painting Council:
a. SSPC Guide 7-04 Guide for the Disposal of Lead-
Contaminated Surface Preparation Debris.
b. SSPC Paint 20-02 Zinc-Rich Coatings Type I Inorganic and
Type II Organic.
c. SSPC Paint 25-97 Zinc Oxide, Alkyd, Linseed Oil Primer for
Use Over Head Cleaned Steel Type I and Type II.
6. Underwriters Laboratories, Inc.:
a. UL 586-04 High-Efficiency, Particulate, Air Filter Units.
7. Unified Facilities Criteria:
a. UFC 4-010-01-03 DoD Minimum Antiterrorism Standards for
Including Change 1, Buildings.
22 January 20007
C. Attachments:
1. A and B - Window Sketches.
2. C - Photographs.
ANZY080082 02 08 00-1
SECTION 02 08 00
ASBESTOS REMOVAL
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Removal and disposal of asbestos materials.
1.2 CODES AND STANDARDS
A. AEDC Safety Standards:
1. A9 Hazard Communications, 2006.
2. B5 Confined Spaces, 2007.
3. E7 Asbestos, 2007.
4. E18 Managing Waste Containing Chemical and
Petroleum Products, 2007.
B. American Industrial Hygiene Association:
1. AIHA Z9.2-06 Fundamentals Governing the Design and Operation of Local Exhaust Systems.
C. American Society of Mechanical Engineers:
1. ASME A13.1-07 Scheme for the Identification of Piping Systems.
D. Code of Federal Regulations:
1. 29 CFR 1910.134 Respiratory Protection, 2007.
2. 29 CFR 1910.1200 Hazard Communication, 2007.
3. 29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists, 2007.
4. 29 CFR 1926.59 Hazard Communication, 2007.
5. 29 CFR 1926.1101 Asbestos, 2007.
6. 40 CFR 61 National Emission Standards for Hazardous Air
Pollutants (NESHAP), 2007.
7. 40 CFR 260 Hazardous Waste Management Systems: General, 2007.
8. 40 CFR 261 Identification and Listing of Hazardous Wastes, 2007.
E. Public Law:
1. PL 101-637 The Asbestos School Hazard Abatement
Reauthorization Act (ASHARA), 1990.
F. Tennessee Department of Environment and Conservation:
1. Chapter 1200-3-11-02 Hazardous Air Contaminants, Asbestos, 2006.
1.3 SUBMITTALS
A. Evidence satisfactory to the Contracting Officer that the firm removing asbestos has at least one designated employee on site during all abatement
ANZY080082 02 08 00-2
activity who has received certification by completing an Asbestos Abatement Contractor Training Course approved or sponsored by the U. S Environmental Protection Agency (EPA) and who will be responsible for the work whenever any phase of the project is in progress. The course shall be a 5-day supervisory course. A 1-day supervisory refresher course also is acceptable if documents showing completion of the initial 5-day course are submitted and the refresher course or courses have been completed within the required time frame to maintain currency in EPA certifications. This training shall have been completed within 12 months prior to the bid opening date. Certification shall remain current throughout the course of the job and shall comply with 40 CFR 61 and PL 101-637.
B. Written certification that all employees involved in the asbestos removal have received training and medical examinations as required by 29 CFR
1926.1101 and 29 CFR 1910.134, respectively. Certification includes respirator fit test records and a copy of respirator operating procedures and program, as specified in 29 CFR 1910.134. Include with the certifications dates of the most recent training, medical examinations, and a physician's statement indicating that workers are physically able to perform asbestos work and use the required respiratory and general body protection. Provide this information for all personnel including management and any air monitoring personnel on the job site before their first entry onto the job site.
Keep information current during all phases of the job.
C. A copy of the hazard communications program and certification that all employees have been trained concerning the hazard communications standards and the written program in accordance with 29 CFR 1910.1200 and/or 29 CFR 1926.59.
D. A list of products to be used and a Material Safety Data Sheet (MSDS) for each. Products include, but are not limited to, aerosol sprays of any kind, wetting and cleaning agents, fuels, solvents, and paints. MSDS’s will be kept in a notebook and will be indexed for easy reference. This MSDS notebook shall remain available to all employees on the job site at all times.
E. A list of all equipment to be used and manufacturers’ literature showing that the equipment and materials meet all EPA, Occupational Safety and Health Administration (OSHA), and ANSI standards for use in asbestos abatement activities. Do not use materials that are or will create hazardous waste as described in 40 CFR 261.
F. Any citation or notice of violation from any Government agency issued as a result of work performed under this contract or any contract conducted in the last three years. If none have been received, submit a letter certifying that none have been received.
G. Environmental, health, and safety plan that addresses all environmental, health, and safety aspects of the job. Submit this plan within 30 calendar days
ANZY080082 02 08 00-3
after award of the contract and before any field work begins. Include methods to ensure safety including a lockout/tagout plan; job safety analysis; tool box safety meeting minutes; accident reports and investigations; lead-testing data/certification; fall protection systems; shop drawings; procedures for disposing of waste, scrap, and excess materials; and procedures for work involving transportation or disposal of hazardous waste. The plan shall address all other environmental, health, and safety concerns associated with the job, including a hazardous waste management plan in accordance with 40 CFR 260, a fire safety plan, and procedures for addressing other emergencies within the work area and in compliance with 29 CFR 1926.55.
H. Asbestos removal plan including the precautions to be taken in this work. Do not proceed without the Contracting Officer’s written approval of the plan. The plan shall include location of control areas and change rooms; layout of change rooms; location of hot and cold running water shower facilities; types of air machines used; kinds of interface of trades involved in the construction;
schedule for sequencing of asbestos-related work; plan for asbestos disposal;
type, manufacturer, and name of wetting agent and asbestos sealer to be used; air monitoring; and a detailed description of the pollution control method to be used. The plan shall also state the method proposed to handle oversized asbestos material (too large for bagging). Include dates of proposed work commencement and completion (by phases, if more than one phase is required or proposed).
I. Air sampling reports are to include the results of daily area and personal air and excursion limit sampling along with negative pressure differential documentation.
J. Testing certifications.
1. Evidence that all air sampling is analyzed by a laboratory in full compliance with the OSHA Reference Method and which participates in an inter-laboratory quality assurance program or is accredited by the American Industrial Hygiene Association.
2. Evidence that all persons analyzing samples have successfully completed the required National Institute for Occupational Safety and Health (NIOSH) and EPA-approved courses and been certified proficient by successfully participating in a NIOSH Proficiency Analytical Testing (PAT) (air) or National Institute of Standards and Technology (NIST) program within the last year.
3. Should the contractor choose to collect and analyze bulk samples, submit evidence that the laboratory analyzing asbestos bulk samples is a NIST-accredited laboratory. (Bulk samples may be collected only with the permission of the Contracting Officer and shall be returned to AEDC for disposal.)
K. Certification that persons monitoring work in confined spaces have successfully completed a course in cardiopulmonary resuscitation (CPR) by the American Red Cross or the American Heart Association.
ANZY080082 02 08 00-4
L. Evidence that the firm removing asbestos has suitable insurance to cover any asbestos liabilities.
M. A list of the sampling numbers required by paragraph 3.1B.
N. AEDC asbestos landfill Operator's Log and Shipper’s Log (Form GC-1622).
This form will be provided by the Government representative.
O. Daily logs.
1. Sign-in logs will be submitted at least monthly and when the job is completed. Sign-in logs will include the following information for all persons entering the controlled area:
a. First and last name (must be legible).
b. Company and organization.
c. Social security number.
d. Date and time of arrival and departure.
e. Reason of visit.
2. Field notes will also be submitted at least monthly and when the job is completed.
1.4 QUALITY ASSURANCE
A. Demolish, remove, and dispose of asbestos materials as indicated on the drawings and specified herein. For the purposes of this specification, full-gross removal containment is required for any removal activity that takes two people over four hours to complete or that is required in 29 CFR 1926.1101.
During removal, workers shall not leave the enclosure except for life-threatening emergencies. This applies only to removal activity and not to enclosure construction or final area clean-up.
B. Use glove bag techniques as described in 29 CFR 1926.1101 and paragraph 3.7C, for small sections. If samples taken during initial glove bag work exceed
0.01 fiber per cubic centimeter (f/cc), stop the job and remove all remaining asbestos using full-gross removal containment. Gross removal methods utilizing full decontamination units as described in 29 CFR 1926.1101, Appendix F, shall be the method of removal.
C. On small sections of pipe, valves, or other small areas of abatement where the glove bag is not suitable and full-gross removal containment is not required, mini-enclosures as specified in 29 CFR 1926.1101 may be used.
Mini-enclosures shall be equipped with high-efficiency particulate air (HEPA) filtered exhaust ventilation.
D. Assume unidentified insulating material to be asbestos.
ANZY080082 02 08 00-5
PART 2 PRODUCTS
2.1 AIR RETURN FILTERS
A. 1-inch-thick disposable random fiber.
2.2 ENCAPSULANTS
A. Dryable to clear appearance and paintable with standard latex paints (American Coatings Corporation Cable Coating 22P Penetrating Sealant and Lock Down, or approved equal).
PART 3 EXECUTION
3.1 CONTROL OF WORK: Control work locations where the generation of asbestos dust could expose persons not properly protected.
A. Use safety ropes and barricades and post with 20-inch by 14-inch signs bearing the following warning:
B. Record all sampling numbers identified on asbestos material to be removed.
C. Ensure isolation of the work area or construction of the enclosure complies with 29 CFR 1926.1101. In addition, a continuous layer of true 6-mil polyethylene or other impermeable material shall first be applied to the floor and extend 12 inches up the wall. Use a layer of true 4-mil polyethylene for the first wall and ceiling and extend 12 inches onto the floor. Place the second layer of true 6-mil polyethylene on the floor and extend 18 inches up the wall and follow by the second layer of true 4-mil polyethylene on the walls and ceiling and extend 18 inches onto the floor. Polyethylene used for floors and walls shall be installed in such a manner to prevent ballooning of the polyethylene from the walls or floors. Drop and splatter sheets shall also be used in all containments in addition to the use of the two layers of polyethylene on the walls and the three layers on the floors of the containment. In special situations, such as enclosures constructed outside, you may elect to construct the entire containment out of true 6-mil polyethylene or other impermeable material also supported by plywood or other rigid material.. Coordinate such construction with the Government
DANGER
ASBESTOS
CANCER AND LUNG DISEASE HAZARD
AUTHORIZED PERSONNEL ONLY
RESPIRATORS AND PROTECTIVE CLOTHING
ARE REQUIRED IN THIS AREA
ANZY080082 02 08 00-6
representative. Enclosures constructed to contain asbestos work such as around equipment, utility systems, windows, doors, or other industrial systems shall be constructed of lumber (such as two by fours) or other rigid material supported on centers no greater than 48 inches apart and in a manner that shall maintain the integrity of the containment and prevent containment failure and release of asbestos fibers outside the work area. The use of wire, cable and other non-rigid systems shall not be used as containment framework or to otherwise hold polyethylene unless also supported by lumber or other rigid material on no greater than 48-inch centers. Support of polyethylene by wire, cable or other non-rigid materials by themselves shall not be allowed. Polyethylene sheeting shall be attached to the lumber or other rigid material and held in place through the use of spray glue, wooden screen molding nailed or screwed in place, duct tape and/or other mechanical methods.
D. Construct hygiene facilities for decontamination of workers and equipment in the same way except use true 6-mil polyethylene for walls, ceiling, and floor.
Hygiene facilities for decontamination of workers and equipment must be contiguous with the work area in all instances. Construct doors so that flaps completely isolate the rooms in the event of air exhaust ventilation failure and allow easy access for personnel and equipment. The clean room shall be large enough to accommodate at least three workers. Prevent direct viewing into the shower, clean room, or dirty room by other personnel by constructing the walls and ceilings of these areas of black polyethylene.
E. All negative pressure enclosures shall be smoke tested after initial setup and at the beginning of each work shift.
F. Ensure that the enclosure walls, floor, and ceiling do not billow or pull out more than 6 inches from the walls or floors to allow for effective cleaning and easy movement of personnel and equipment while inside.
G. Repair damaged barriers and correct defects as soon as they are discovered.
Visually inspect containment barriers at the beginning of each work period.
The Government representative may use smoke tube methods to test barrier effectiveness.
H. Do not commence work until signs are posted, required isolation barriers are erected, and the Contracting Officer or the Government representative has authorized the work to begin. In addition, all equipment such as ladders, scaffolds, HEPA vacuums, air machines, trucks, and other tools and equipment are subject to visual inspection and bulk sampling to ensure that no asbestos debris or contamination is brought onto AEDC from the contractor's previous jobs. Wrap in two layers of true 6-mil polyethylene sheeting or properly bag any items that have visible debris, label ASBESTOS, and remove from AEDC. Encapsulation of items is not sufficient justification to use contaminated equipment. Items that do not pass visual inspection shall not be cleaned at AEDC.
ANZY080082 02 08 00-7
I. Turn off all building ventilation air systems during preparation and until the area has passed final visual inspection and final air sampling by the Government representative. Remove all heating, ventilation, and air conditioning system filters before commencing asbestos removal and treat them as asbestos contaminated. Seal all air supply and return openings with true 6-mil polyethylene. Replace filters with new ones following the approved inspection.
J. Clean the work areas of all visible asbestos debris prior to placing polyethylene sheets or beginning asbestos containment work. Establish critical barriers before beginning clean-up work.
K. Completely decontaminate all ladders, vacuum cleaners, air machines, and other equipment used during abatement activities prior to removal from the abatement area. Cover all such equipment with true 4-mil polyethylene sheeting and duct tape prior to abatement activity. Seal all openings to air machines with true 6-mil polyethylene prior to their removal from an abatement area and any time they are not in operation. Wrap vacuum cleaner hoses with polyethylene. Seal all open ends of vacuum hoses or intake openings of vacuums with duct tape when not in operation to contain the asbestos. Seal ladder rungs, steps, and sides in polyethylene before use in an abatement area to ensure their complete decontamination following abatement. Clean and completely decontaminate all pump-up sprayers, tools, and equipment following abatement. If they cannot be decontaminated, dispose of them as asbestos material in the AEDC asbestos landfill, which is located approximately 2 miles west of the North Hap Arnold Drive and Sixth Street intersection.
3.2 RESPIRATORY PROTECTION REQUIREMENTS
A. Establish a respiratory protection program as required by 29 CFR 1910.134 and 29 CFR 1926.1101. The Government will strictly enforce the OSHA "no facial hair/respiratory policy" for all personnel who wear respirators at any time during the job.
B. Ensure workers are clean shaven daily immediately preceding their work shift and before wearing respiratory protection.
C. Provide spectacle inserts to personnel wearing full-face respirators who normally wear spectacles, otherwise they will not be allowed in the containment area. Do not allow contact lenses to be worn in asbestos areas.
3.3 PROTECTIVE EQUIPMENT
A. Use protective equipment that meets all Government standards for use in asbestos abatement. Use coveralls having headcovers and booties attached.
ANZY080082 02 08 00-8
3.4 LOCAL EXHAUST SYSTEM
A. Provide a local exhaust system in the asbestos control area in accordance with ANSI Z9.2. Equip exhaust with absolute HEPA filters. When possible, HEPA-filtered air shall be exhausted to the outside of buildings. Local exhaust equipment shall be sufficient to maintain a minimum pressure differential of minus 0.02 inches of water column relative to adjacent unsealed areas and provide a minimum of four complete air changes per hour. Provide continuous 24-hour-per-day monitoring of the pressure differential with an automatic recording instrument. In no case shall the building exhaust system be used as the local exhaust system for the asbestos control area. Filters on vacuums and exhaust equipment shall conform to ANSI Z9.2. Change HEPA filters at least every 700 hours for 12-inch HEPA filters or more often as required to ensure proper filtration of air. Change pre-filters as soon as visible accumulations occur on the filters, and change intermediate filters at least once per shift. If filter loading occurs (i.e., visible accumulations on prefilter), change more often. Conduct air monitoring during asbestos removal to ensure filter integrity and asbestos levels outside the enclosure remain at or below 0.01 f/cc. Provide and install a back-up HEPA air exhaust ventilation system to be used in the event of primary system failure. Do not use a system with a remote filter housing inside gross removal areas.
3.5 COMMUNICATION DEVICES
A. Do not use any two-way communication devices unless pre-approved by the AEDC Security Forces.
3.6 CONFINED SPACES
A. Ensure entry into confined spaces is consistent with AEDC Safety Standard B5. Before entering a confined space, make oxygen and Lower Explosive Limit (LEL) measurements using a NIOSH-approved O2/LEL metering device.
While persons are working in a confined space, designate a stand-by person to remain outside who has been trained within the last 12 months in cardiopulmonary resuscitation (CPR) by the American Red Cross or American Heart Association.
3.7 ASBESTOS REMOVAL
A. General: Comply with the rules of Tennessee Department of Environment and Conservation, Chapter 1200-3-11-.02, and 40 CFR 61. The Government will notify the Tennessee Air Pollution Control Board (ref 1200-3-11-.02 [2][d]1[ii] and 2). The removal of asbestos insulation from existing piping or other surfaces shall be subject, but not limited, to the following:
1. Require personnel who work with asbestos to use disposable coveralls;
disposable head, neck, and shoe coverings; non-porous gloves; eye goggles; and a NIOSH-approved respirator.
ANZY080082 02 08 00-9
2. Saturate all asbestos materials with wetting agent and ensure the material stays damp during removal. Do not allow asbestos insulation to drop to the floor or ground. Place asbestos in a proper container and lower to the floor or ground as appropriate.
3. Protect all existing machinery, equipment, floors, and walls from contamination by asbestos waste.
4. Control the dispersal of asbestos particles through methods such as isolation and wetting of material before removal. Keep a HEPA-filter vacuum on the job site at all times for use in clean-up of asbestos debris and during glove bag removal.
5. Do not wear protective clothing off the job site or take home for laundering. Provide a decontamination locker room and a clean locker room for personnel required to wear whole-body special clothing. Keep street clothes in the clean locker. While still wearing respirators in the decontamination room, vacuum and remove asbestos-contaminated disposable protective clothing and seal in impermeable bags or containers for disposal. Locate a shower between the decontamination and clean locker rooms and require all employees to shower before changing into street clothes. Filter shower water to 1 micron prior to disposal in a sanitary sewer.
6. Do not smoke, eat, drink, chew tobacco or gum, or apply cosmetics at the job site. Ensure that workers are fully decontaminated prior to conducting any of these activities.
B. Small section removal: Use glove bags to remove asbestos material in small sections with two-person teams specifically trained in glove bag procedures.
The Government will enforce strict observance of the glove bag techniques described in 29 CFR 1926.1101 and as specified herein.
1. 1. Place polyethylene under the work area.
2. Wear full body protection (e.g., coveralls, booties, headcovers, and gloves) in addition to respiratory protection.
3. Turn off ventilation systems located in the area during asbestos removal.
4. Clean up and seal ventilation openings in the area.
5. Establish critical barriers by sealing doors and windows or wall penetrations as necessary.
6. Do not allow asbestos insulation to drop to the floor or ground.
C. Glove bag requirements: In areas where insulation has caused contamination under the pipe line, pre-clean the work area of all contamination before applying polyethylene worksheet or conducting any repair or glove bag activity.
1. Use true 6-mil-thick transparent polyethylene glove bags.
2. Ensure that the diameter of the pipe insulation does not exceed one-third of the bag’s working length.
3. Secure the glove bag with an air-tight seal of duct tape. Place duct tape around the pipe insulation first to form a smooth seal.
4. Ensure the glove bag is sealed by conducting a smoke test. A smoke test is conducted by inserting a smoke tube used in ventilation system
ANZY080082 02 08 00-10
analysis through the bag. If smoke leaves the bag, the seal is inadequate;
and work will be discontinued until an adequate seal is achieved. Retest the glove bag after each failure.
5. Wrap any damaged pipe insulation, adjacent to the work area or capable of creating asbestos fallout as a result of glove bagging, in at least true 6-mil-thick plastic sheeting and seal tight with duct tape, or seal and repair with insulation mastic. In areas where insulation to be removed has deteriorated and the temporary repair may create a potential fiber release, use HEPA local exhaust ventilation during repair or removal.
6. Saturate all asbestos-containing materials within the glove bag with amended water prior to stripping. When using pump-up sprayers for wetting agents and encapsulants, place the spray wand through the side of the bag and seal holes prior to the start of asbestos removal.
7. Saturate the pipe with amended water after the insulation has been stripped and scrub with a brush to remove all visible asbestos material.
8. Seal any piping insulation ends created by the repair with an EPA-approved encapsulant and an insulation mastic.
9. Use a HEPA vacuum to collapse the glove bag. Seal the vacuum in the glove bag prior to asbestos removal and run continuously during shifting of glove bag.
10. Use negative pressure enclosure with HEPA local exhaust ventilation in areas where removal of badly deteriorated insulation is to occur, regardless of the amount of asbestos to be removed.
11. Double-bag the glove bag and all other asbestos-containing waste for disposal.
D. Ventilation ductwork removal requirements: Remove ventilation ductwork, which is insulated with a non-asbestos material held in place by asbestos-containing glue or mastic, by doing the…