FA8903-18-R-0037_Landfills_LTM_PWS_(rev_4)_051618.docx
DOCX document 80 KB Posted
- Attached to
- LTM & Well installation at Maxwell afb
- Solicitation number
- FA8903-18-R-0037
About this file
Revised PWS dated 16 May 2018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8903-18-R-0037_Landfills_LTM_PWS_(rev_5)_060418.docx | DOCX document | |
| Additional_Questions-Response_060518_(final).docx | DOCX document | |
| FINAL_Q&A_RESPONSES.docx | DOCX document | |
| CDRL_B.pdf | ||
| Attach_1_-_18-R-0037_Landfills_LTM_PWS_(rev_2)_031318.docx | DOCX document | |
| Attach_8--18-R-0037-_Schedule_B.XLSX | XLSX spreadsheet | |
| Attach_2-_BSL.pdf | ||
| Attach_7_-_Clause_52_212-5_and_Additional_Clauses.docx | DOCX document | |
| Attach_5--52-203-18__19_Internal_Confidentiality_Agreements.docx | DOCX document | |
| CDRL_B.pdf | ||
| CDRL_A.pdf | ||
| Attach_6_-_Clause_52_212-3_Offeror_Reps_and_Certs.docx | DOCX document | |
| Attach_3_-_SCA.pdf | ||
| RFP_18R0037_MAXWELL_LTM.doc | DOC document | |
| Attach_4--52-209-11_Tax_Liability.docx | DOCX document | |
| Attach_9_-Questions_Template_18-R-0037.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
FA8903-18-R-0037
PERFORMANCE WORK STATEMENT
LONG-TERM MANAGEMENTMONITORING, WELL INSTALLATION, PROPOSED PLAN, AND RECORD OF DECISION AT MAXWELL AFB, ALABAMA
Project Number: PNQS20187801 Solicitation Number: FA8903-18-R-0037
13 March 201816 May 2018
Performance Work Statement Long Term Monitoring (LTM), Well Installation, Proposed Plan, and Record of Decision (PP/ROD) at Maxwell AFB, AL
PART A - GENERAL REQUIREMENTS
In carrying out work assignment(s) issued under this contract, the Contractor shall furnish the personnel, services, equipment, tools, materials, vehicles, facilities supervision and other requirements necessary for, or incidental to, the performance of work set forth herein; assure any and all program and/or project related costing information (regardless of its stage in development) is secured, as directed by the Contracting Officer (CO); and be responsible for safeguarding proprietary, and other sensitive information. The Contractor shall be immediately capable of addressing and interpreting all aspects of environmental law and regulation.
Scope Introduction This PWS encompasses the full range of methods, technologies, and supporting activities necessary to conduct environmental restoration/remediation efforts in order to support Long Term Management Monitoring (LTM) and well installation at Maxwell AFB, AL. This project includes the installation of nine new wells and the sampling, analysis, and reporting associated with LTM requirements for four (4) landfills at Maxwell AFB. This contract also includes preparation of a Proposed Plan/Record of Decision PP/ROD for the four (4) landfills.
Support shall be conducted in accordance with all technical and regulatory requirements and a limited range of construction and ancillary services as required in support of those and other efforts as addressed herein. Requirements under this contract will primarily support environmental restoration/remediation, operations and services efforts; but requirements may also include traditional minor construction, demolition, and repair. Stand-alone design and conceptual work plan/implementation work plan (CWP/IWP) are NOT included in the scope of this contract.
Site Descriptions and Histories:
A brief site description and history are provided for each of the four (4) sites below. The included site descriptions do not represent all available information. Additional information is available in site-specific documents on the Air Force Administrative Record at http://afcec.publicadmin-record.us.af.mil/Search.aspx.
LF003 – Landfill 3 (Co-Located with FT002): LF003 was used from 1951 to 1956 for the disposal of Maxwell AFB-generated household garbage, paper, wood, scrap metal, and non-liquid industrial wastes (e.g., waste paints, paint cans, and empty pesticide cans). The landfill is thought to have been a trench, burn, and backfill operation. Waste oils, fuels, and solvents were burned during the fire training exercises; these ignitables were often drummed and stored at the site. Extinguishing agents used included protein foam, aqueous film forming foam (AFFF), and halon. In 1978, the pit was concrete-lined and a drainage system was installed. The sump, oil/water separator, and evaporation pond were also installed south/southwest of the burn pit to collect and treat pit-generated wastes. In 1990, Maxwell AFB discontinued using FT002 for fire training exercises. Investigations at LF003 were conducted simultaneously with those at FT002. Contaminants found at both locations were similar.
LF004 – Landfill 4: Investigation activities at the site, including soil and groundwater sampling, indicated subsurface soil contamination of the pesticide dieldrin, and metals (including arsenic, iron, and manganese) by direct analysis over the allowed ADEM’s MCLs/CALs. Also, it is reasonably assumed that subsurface soils within the landfill boundaries have been impacted by contaminants due to contact with landfilled materials. Additionally, contaminants may exist within the landfill boundaries in media other than soil (i.e. liquid waste, sludge, slurries, etc.). All groundwater COCs (VOCs, SVOCs, metals, and pesticide) within the boundaries of the landfill will be considered as subsurface soil COCs (groundwater contaminant sources). Surface soil is not considered to be contaminated as the landfills were covered with clean fill material from off-site. It should be noted that arsenic, iron, and manganese in the soils and groundwater at and around Maxwell AFB can be associated with alluvial deposits in many parts of central Alabama. Groundwater sampling indicated that shallow groundwater contamination at the site was over the allowed ADEM’s MCLs/CALs. Contaminants over the ADEM’s MCLs in groundwater by direct analysis at this site appear to be the VOCs (including benzene and TCE), SVOCs, natural occurring metals, and the pesticides (including Aldrin, dieldrin, and lindane). Intermediate groundwater north and down-gradient of LF004 had hexachlorobutadiene just above the MCLs/CAL in MMW-489. Based on carbon tetrachloride and PCE exceedances in groundwater compliance wells protective of surface water, consuming fish from the West End Ditch adjacent to the site may be unsafe during extended periods of “no flow” conditions. Surface water, West End Ditch, is used as a conduit for storm water runoff from a large portion of commercial and industrial businesses on the west side of the City of Montgomery, and is a known non-point source of periodic contamination. The most recent work at landfill LF004 and an overview of all of the landfills is available on the Air Force Administrative Record (AR#1129 Maxwell Data Gap Sampling and AR#895 Final ARBCA Evaluation of the Landfills 4, 5, and 6).
LF005 – Landfill 5: Investigation activities at the site, including soil and groundwater sampling, indicated subsurface soil contamination (including iron, lead, and manganese by direct analysis) over the allowed ADEM’s MCLs/CALs. Also, it is reasonably assumed that subsurface soils within the landfill boundaries have been impacted by contaminants due to contact with landfilled materials. Additionally, contaminants may exist within the landfill boundaries in media other than soil (i.e. liquid waste, sludge, slurries, etc.). In the best case, the data would be misleading. All groundwater COCs (VOCs, SVOCs, metals, and pesticide) within the boundaries of the landfill should also be considered as subsurface soil COCs (groundwater contaminant sources). Surface soil is not considered to be contaminated as the landfills were covered with clean fill material from off-site. It should be noted that iron, lead, and manganese in the soils and groundwater at and around Maxwell AFB can be associated with alluvial deposits in many parts of central Alabama. Delineation and association of the abovementioned contaminants to any particular site may be incorrect and misleading. Groundwater sampling indicated that shallow groundwater contamination at the site was over the allowed ADEM’s MCLs/CALs. Contaminants over the ADEM’s MCLs in groundwater by direct analysis at this site appear to be VOCs (including benzene, MTBE, and TCE), SVOCs, the metals (including lead), and pesticides. Based on the nature of landfilling and the materials within, this direct chemical analytical data by no means represents a complete assessment of the groundwater at the site and may only represent scattered or isolated pockets of groundwater contamination. Consuming fish from the West End Ditch adjacent to the site may be unsafe during extended periods of “no flow” conditions, based on carbon tetrachloride and PCE exceedances in groundwater compliance wells protective of surface water. Surface water, West End Ditch, is used as a conduit for storm water runoff from a large portion of commercial and industrial businesses on the west side of the City of Montgomery, and is a known non-point source of periodic contamination. There may also be additional risks, from contaminants that may exist within the landfill boundaries in media other that soil and groundwater solution (i.e. liquid waste, sludge, slurries, etc.). Work at landfill LF005 and an overview of all of the landfills is available on the Air Force Administrative Record (AR#1129 Maxwell Data Gap Sampling and AR#895 Final ARBCA Evaluation of the Landfills 4, 5, and 6).
LF006 –Landfill 6: Investigation activities at the site, including soil and groundwater sampling, indicated subsurface soil contamination (including arsenic, manganese, and iron by direct analysis) over the allowed ADEM’s MCLs/CALs. Also, it is reasonably assumed that subsurface soils within the landfill boundaries have been impacted by contaminants due to contact with landfilled materials. Additionally, contaminants may exist within the landfill boundaries in media other than soil (i.e. liquid waste, sludge, slurries, etc.). All groundwater COCs (VOCs, SVOCs, metals, and pesticide) within the boundaries of the landfill will also be considered as subsurface soil COCs (groundwater contaminant sources). Surface soil is not considered to be contaminated as the landfills were covered with clean fill material from off-site. It should be noted that arsenic, manganese, and iron in the soils and groundwater at and around Maxwell AFB can be associated with alluvial deposits in many parts of central Alabama. Groundwater sampling indicated that shallow groundwater contamination at the site was over the allowed ADEM’s MCLs/CALs. Contaminants over the ADEM’s MCLs in groundwater by direct analysis at this site appear to be the VOC vinyl chloride, SVOCs, the metals arsenic, iron, lead, and manganese, and pesticides. Based on the nature of landfilling and the materials within, this direct chemical analytical data by no means represents a complete assessment of the groundwater at the site and may only represent scattered or isolated pockets of groundwater contamination. Based on carbon tetrachloride and PCE exceedances in groundwater compliance wells protective of surface water, consuming fish from the West End Ditch adjacent to the site may be unsafe during extended periods of “no flow” conditions. Surface water, West End Ditch, is used as a conduit for storm water runoff from a large portion of commercial and industrial businesses on the west side of the City of Montgomery, and is a known non-point source of periodic contamination. There may also be additional risks, from contaminants that may exist within the landfill boundaries in media other that soil and groundwater solution (i.e. liquid waste, sludge, slurries, etc.). Work at landfill LF006 and an overview of all of the landfills is available on the Air Force Administrative Record (AR#1129 Maxwell Data Gap Sampling and AR#895 Final ARBCA Evaluation of the Landfills 4, 5, and 6).
Policy and Requirements Statements It is the policy of the Air Force to use innovative and sustainable approaches to environmental management and technology to accomplish its mission. Sustainable projects do not deplete resources, cause environmental degradation, or impact to human health and may reduce the burden of compliance for the Air Force. Mission requirements are met while also balancing cost and environmental responsibility. The Contractor shall incorporate pollution prevention and sustainability initiatives into all aspects of this contract.
The Contractor shall function as an integral team member in support of the Air Force Civil Engineer Center (AFCEC) mission and Maxwell AFB mission to include sharing of information with other AFCEC contractors, and cooperation with communities, regulators, and other government entities.
Requirements include efficient management of this contract including, but not limited to, the submission of accurate, on-time, quality contract deliverables and timely identification and solution of impediments to successful project execution. Technical requirements include, but are not limited to, early involvement in the process to allow for the development of the most cost-effective and technically sound approach or solution. The AFCEC will rely on the Contractor’s expertise in recognizing and addressing problematic issues and successful execution of this contract. The Contractor shall perform all work in accordance with federal, state, and local statutes and regulations. Remedies shall conform to environmental permits, decision document requirements, and other legal requirements.
APPLICABLE DOCUMENTS
The Contractor shall identify and comply with all applicable federal, state, and local statutes; Air Force/Military instructions, manuals, handbooks, regulations, guidance, and policy letters; and Executive Orders (EOs); including all changes and amendments in effect on the date of issuance of this contract The Contractor shall be responsible for identifying and complying with all applicable requirements as they pertain to the project requirements. Applicable documents include but may not be limited to:
· Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)
· Resource Conservation and Recovery Act (RCRA)
· Alabama Department of Environmental Management (ADEM) 335, Division 13
· Selected technical reports available on the Air Force Administrative Record
ADMINISTRATIVE AND MANAGERIAL REQUIREMENTS
The Contractor shall perform management and planning functions, as well as performance measurement and cost status reporting during the course of this effort.
Coordination with Other Government Offices The Contractor shall be responsible for day-to-day interface with other government work offices to include, but not limited to, civil engineering, transportation, communications, legal, operations, security forces, safety and public affairs. Topics for interface include, but are not limited to engineering design and construction, environmental compliance, environmental restoration, and fire systems maintenance.
Regulatory Interface The Contractor shall assist in the application of general and site-specific regulatory requirements that pertain to assigned AFCEC projects and maintain currency with changing DOD regulations and federal, state, and local statutes and regulations.
The Contractor is not an employee of the government and shall not represent the government in an official or unofficial capacity without the express prior written permission from the CO. In the event that any regulatory representative approaches the Contractor with a stated intent to inspect the activities of the Contractor without the previous direction of the CO, the Contractor shall respectfully decline the inspection until the CO is properly notified and a duly appointed Contracting Officer Representative (COR) is present or other direction is issued by the CO. If this is not possible, due to project constraints, the Contractor shall notify the CO, COR, and base point of contact (POC) at the earliest possible time following the inspection.
Coordination with Other Contractors The Contractor shall cooperate fully with other contractors and government employees. The Contractor shall not commit any act that will interfere with the performance of work by any other Contractor or government employee. The CO will resolve work schedule conflicts between this contract and other contracts. The CO will provide written direction to the Contractor to reschedule work when required.
Special Notification Health Risks The Contractor shall immediately report to the CO and the COR, verbal telephone or e-mail notification pursuant to the contract, any issues or incidents which may indicate potential imminent risk to contracted, federal, or local personnel, the public at large, or the environment. Following the verbal or e-mail notification, a written notice with supporting documentation, to include photographic documentation whenever appropriate, shall be prepared and delivered within three (3) working days to the CO. Upon request of the CO, or the COR, the Contractor shall provide pertinent raw laboratory data of the incident immediately (not to exceed two [2] weeks) via e-mail or tele-facsimile, and then provide final results and laboratory quality data of the incident via standard mail as soon as possible. (Contract Data Requirement List [CDRL] A002) Identification and Change of Critical Contractor Personnel The Contractor shall submit an organizational chart displaying key personnel involved in the effort and their respective labor categories. The Contractor shall immediately notify the CO and COR, in writing or email, of any changes in critical Contractor personnel. The Contractor shall obtain CO and COR approval of any proposed changes in project personnel along with the steps taken/proposed to ensure there are no impacts to the schedule or costs associated with individual tasks. The Contractor shall identify to the CO and COR all subcontractors to be used under this contract, issued pursuant to this PWS, prior to signing any subcontract or initiating any work. The Contractor shall provide subcontractor qualifications to the CO and COR prior to subcontractor utilization. (CDRL A003) Unexploded Ordnance - Not Applicable to this contract.
Laboratories The Contractor shall select a laboratory with analytical capabilities sufficient for the methods specified in the WP and adequate throughput capacity to handle the project’s analytical workload during all field activities. The Contractor shall ensure that the selected laboratory is accredited under the DoD Environmental Laboratory Accreditation Program (ELAP), and meets all state and federal requirements, including state certification where appropriate.
General Laboratory Requirements The Contractor shall develop project specific Data Quality Objectives (DQOs) consistent with the project’s Remedial Action Objectives (RA-Os) and designed to ensure data of adequate quality are collected to support project decisions. DQOs shall be developed in consensus with the restoration project team and in accordance with the Uniform Federal Policy for Quality Assurance Project Plans (UFP-QAPP) and USEPA QA/G-4, Guidance on Systematic Planning Using the Data Quality Objectives Process (most recent version), and documented in the project SAP. Minimum Quality Assurance and Quality Control (QA/QC) requirements identified by the current version of the DoD Quality Systems Manual (QSM) shall be incorporated in the UFP-QAPP.
· The UFP-QAPP is a set of consensus documents prepared by the Intergovernmental Data Quality Task Force (IDQTF) to provide instructions for preparing Quality Assurance Project Plans for any environmental data collection operation. The UFP-QAPP, QSM, and associated worksheets can be located at: http://www.denix.osd.mil/.
· The Guidance on Systematic Planning Using the Data Quality Objectives Process, EPA QA/G-4, provides a standard working tool for project managers and planners to develop DQOs for determining the type, quantity, and quality of data needed to reach defensible decisions or make credible estimates. This document can be located at: https://www.epa.gov/quality/guidance-systematic-planning-using-data-quality-objectives-process-epa-qag-4.
The Contractor Quality Assurance (QA) POC shall review all DQOs and work with the field team and the laboratory to ensure that the DQOs are met. Analytical problems that the laboratory and the Contractor QA POC cannot resolve shall be brought to the attention of the Contractor’s project manager, the AFCEC COR, and the restoration team as needed for resolution. Laboratories may be subject to on-site AFCEC audits of their Quality Assurance/Quality Control (QA/QC) protocols and procedures. All laboratories shall meet DQOs specified in project site-specific SAP(s). The laboratories shall perform QA/QC requirements, as specified in the project/site specific SAP. The analytical capabilities of the laboratory shall be sufficient for the methods specified in the SAP, and the laboratory shall have sufficient through-put capacity to handle the necessary analytical work-load during all field activities.
On-Site Laboratory Requirements - Not Applicable to this contract.
Work Site Requirements Safety Requirements The Contractor shall be responsible for protecting the lives and health of employees and other persons on the work site; preventing damage to property, materials, supplies, and equipment; avoiding work interruptions; and complying with Occupational Safety and Health Administration (OSHA) regulations and installation safety office requirements. The Contractor shall perform all operations in a prudent, conscientious, safe and professional manner and conform to the safety requirements contained in the contract. The Contractor shall maintain training records on site and have written Health and Safety Plans (HSPs) on site and available for workers and/or regulatory review. The Contractor shall provide the CO and COR copies of any OSHA Report(s) regarding a project site, submitted during the duration of this contract. (CDRL A004) The Contractor shall record and report promptly (within one [1] hour) by telephone or other direct means to the CO or COR, the installation POC, and to the military installation’s Safety Office all available facts relating to each instance of damage to Government property or injury to a person. In the event of an accident/mishap, the Contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, preserve evidence until released by the accident/mishap investigative authority through the CO, and immediately report the incident CO. If the government elects to conduct an investigation of the accident/mishap, the Contractor shall cooperate fully and assist government personnel in the conduct of an investigation until said investigation is completed. The Contractor agrees that his personnel and equipment are subject to safety inspections by government personnel while on federal property.
Fire Prevention and Protection The Contractor and his employees shall comply with the military installation’s regulations, and Air Force Occupational and Environmental Safety, Fire Prevention and Health (AFOSH) Program, as applicable. A copy of these regulations will be made available by the installation POC at the post award conference. The Contractor shall coordinate with the base fire department for hot permits (for welding or open flame operations), as required.
Work-Site Maintenance The Contractor shall maintain the work site to prevent the spread of contamination, provide for the integrity of the samples obtained, provide for the safety of all individuals in the vicinity of the work site areas, and prevent the release of any contamination to the environment. The work site shall be well marked to prevent inadvertent entry into all work areas. Access to work areas shall be monitored and thoroughly controlled. Standard work zones and access points for controlled operations shall be established and maintained as the site conditions warrant. The Contractor shall ensure compliance with any federal, state, and local regulations and QA/QC protocols and procedures for decontaminating tools, equipment, or other materials, as required. The Contractor shall keep the work area free from accumulation of waste and non-essential hazardous materials. The Contractor shall remove non-essential equipment from the work site when not in use. The work site shall be maintained to present an orderly appearance and to maximize work efficiency. Before completing the work at each work location, the Contractor shall remove from the work premises any rubbish, tools, equipment, and materials that are not the property of the government. The Contractor shall properly dispose of all construction debris, investigation derived waste, and other waste(s). Upon completing the work, the Contractor shall leave the area clean, neat, orderly, and return the work site(s) to the original condition.
Geographical Information System The Contractor shall use Global Positioning System (GPS) at all field locations to mark all points of the field investigation. GPS data will be recorded in a format compatible with the installation’s Geographical Information System (GIS). The installation POC and the COR shall be consulted to properly position sampling locations (wells, borings, soil gas probes, etc.) with respect to site locations, to minimize the disruption of installation activities, to minimize disruption of natural and cultural resources, and to avoid penetrating underground utilities. The Contractor shall coordinate all field survey operations with installation personnel to attain these objectives. The Contractor shall provide for the detection of underground utilities utilizing geophysical or other techniques. All necessary permits and coordination shall be completed prior to commencement of individual sampling operations. Frequent communication and coordination with installation personnel shall be necessary to accomplish these goals. (CDRL A005, B001) Storage The Contractor shall be responsible for security and weatherproofing of stored material and equipment. Equipment or materials used in the work, requiring storage on the installation, shall be placed at site(s) designated by the installation POC. At the completion of the work, the Contractor shall remove all temporary fences and structures (used to protect materials and equipment) from the installation unless otherwise directed by the CO. The Contractor shall clean the storage area of all debris and material and perform repairs as required to return the site to its pre-project condition. The Contractor shall be responsible for safeguarding all government property provided for Contractor use. The Contractor shall maintain an inventory of government property, a copy of government property control procedures at the site, and dispose of government property as directed by the COR. All hazardous materials shall be handled, stored, labeled, and transferred in accordance with Resource Conservation and Recovery Act (RCRA) and OSHA regulations.
Site Access Badges The Contractor shall verify that identification credentials presented by all Contractor and subcontractor employees to obtain security badges, passes, cards, or decals used during the duration of this contract are current and correct. As a minimum, verification should be conducted with the Social Security Administration (http://www.ssa.gov/employer/ssnv.htm), the FBI Criminal Justice Information Services, Identification & Investigative Services Section (304-625-5590) and the Form I-9 Employment Eligibility Verification (http://www.uscis.gov/portal/site/uscis). The Contractor shall monitor its employees to ensure all information remains current and to ensure all security badges or passes are returned to the base POC upon expiration of the badge, upon completion of the project, or when possession of the badge is no longer authorized (e.g., upon removal of contracted personnel from specific projects).
Key Control The Contractor shall establish and implement methods of ensuring that all keys issued to the Contractor by the government are not lost or misplaced and are not used by unauthorized persons. Keys issued shall not be duplicated. The Contractor shall limit access to locked areas to Contractor’s employees only.
The Contractor shall report the occurrences of a lost key to the CO or COR and installation POC as soon as known. The Contractor shall be required, upon direction of the CO, to re-key or replace the affected lock(s). However, the government, at its option, may replace the affected lock(s) or perform the re-keying itself.
Permits The Contractor shall be responsible for coordinating and obtaining the required permits to implement a site-specific project as needed. The Contractor shall coordinate with the Base POC prior to the submission of all permit requests. (CDRL A005)
MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS
The Contractor shall plan project activities including the development, implementation, and maintenance of project schedules, events, status of resources, report(s) on the activities and progress toward accomplishing project objectives, and document for Government review and approval the results of the project efforts for this contract.
Meetings Post-Award Teleconference After the issuance of this contract, the Contractors shall attend a kickoff meeting via teleconference. The purpose of the post-award meeting shall be to become familiar with the work requirements, information, and/or site-specific data addressed under this contract. The contractor shall prepare and submit an agenda, meeting minutes, and applicable presentation materials in support of the post-award meeting. (CDRLs B002, B003, B004) Progress Meetings The Contractor shall attend quarterly meetings via teleconference with the installation and/or AFCEC representative(s). The Contractor shall prepare and submit an agenda, meeting minutes, and applicable presentation materials for all meetings attended. (CDRLs B002, B003, B004) Presentation Materials The Contractor shall prepare and present briefing packages at meetings coordinated by the government. As part of the presentation materials, the Contractor shall prepare paper copies of all slides and overheads. (CDRL B004) Training The Contractor is responsible for the proper and timely training of Contractor personnel to perform their jobs in accordance with all applicable legal, regulatory, and compliance requirements.
Work Breakdown Structure The Contractor shall prepare a contract Work Breakdown Structure (WBS). The WBS shall be used to prepare proposals, project schedules, and financial report(s) and to support invoicing. (CDRL B005) Project Planning Chart The Contractor shall prepare and submit a Project Planning Chart (PPC) for approval. The PPC shall detail the project schedule and status through the use of Gantt charts, which shall depict percent complete for each task. (CDRL B006) Integrated Master Schedule - Not Applicable to this contract.
Contractor’s Progress, Status, and Management Report The Contractor shall prepare and submit a monthly Contractor’s Progress, Status, and Management Report (CPSMR). The CPSMR shall be used to review and evaluate the overall progress of the project, along with any existing or potential problem areas. The CPSMR shall include a summary of the events that occurred during the reporting period, discussion of performance, identification of problems, proposed solutions, corrective actions taken, and outstanding issues. The CPSMR shall also include project schedule status and cost information. (CDRL B007) Performance and Cost Report: Not Applicable to this contract.
Funds and Man-Hour Expenditure Report: Not Applicable to this contract.
Quality Program Plan The Quality Program Plan (QPP) shall include the Work Plan (WP), site-specific Health and Safety Plan (HSP) (as required by 29 Code of Federal Regulations (CFR) 1910.120), and Sampling and Analysis Plan (SAP). The HSP and SAP shall be provided as appendices to the WP. The Draft Final version of the WP with appendices shall be provided to the regulator(s) for review and comment.
Work Plan The Contractor shall update the existing WP to comply with DoD, Air Force, United States Environmental Protection Agency (USEPA) (epa.gov/quality), state, and local regulations regarding the proposed work effort. The AFCEC Technical Services Quality Assurance Program shall be used as guidance for all phases of work specified in this contract. (CDRL A006) Health and Safety Plan The Contractor shall prepare a HSP or update the existing HSP to comply with Air Force, OSHA, USEPA, state, and local health and safety regulations regarding the proposed work effort. The Contractor shall use USEPA guidelines for designating the appropriate levels of protection needed at the study site(s) as applicable. The Contractor shall maintain written certification that the approved HSP has been reviewed with all personnel that work at the project site prior to their mobilization. (CDRL A007) Sampling and Analysis Plan The Contractor shall update the existing SAP generated as a Quality Assurance Project Plan (QAPP). The SAP shall be generated using AFCEC Restoration Quality Assurance Examples and Guidance, and project Data Quality Objectives (DQOs), as specified by the Air Force Environmental Restoration team.
As part of the SAP, The Contractor shall update/develop project-specific DQOs consistent with the project’s remedial action objectives and designed to ensure data of adequate quality are collected to support project decisions. DQOs shall be updated/developed in consensus with the restoration project team and in accordance with the UFP-QAPP and USEPA QA/G-4, Guidance on Systematic Planning Using the Data Quality Objectives Process (most recent version), and documented in the project SAP. Minimum Quality Assurance and Quality Control (QA/QC) requirements identified by the current version of the DoD Quality Systems Manual (QSM) shall be incorporated in the UFP-QAPP. (CDRL A008) Quality Control Program As part of the SAP, The Contractor shall develop project-specific DQOs consistent with the project’s remedial action objectives and designed to ensure data of adequate quality are collected to support project decisions. DQOs shall be developed in consensus with the restoration project team and in accordance with the UFP-QAPP and USEPA QA/G-4, Guidance on Systematic Planning Using the Data Quality Objectives Process (most recent version), and documented in the project SAP. Minimum Quality Assurance and Quality Control (QA/QC) requirements identified by the current version of the DoD Quality Systems Manual (QSM) shall be incorporated in the UFP-QAPP.
All laboratory services shall be conducted in accordance with the approved project WP and UFP-QAPP. Samples shall not be submitted for analysis until the WP and UFP-QAPP are approved by AFCEC.
The Contractor shall ensure that all requirements specified in the project WP and UFP-QAPP are met. If not met, the Contractor may be required to re-accomplish sampling at the Contractor’s expense. The Contractor shall conduct audits, administer an AFCEC-approved performance evaluation sample program, verify and validate data, and perform corrective actions in accordance with the project WP and UFP-QAPP.
The Contractor shall ensure that all hard copy and electronic data deliverables supplied by the laboratory are complete and adequate to support the quality and usability of the data. Raw data packages shall be submitted to AFCEC upon request. Data packages shall meet federal and state standards and include all information required to re-create the analysis, including correspondence with the laboratory regarding QA/QC exceedances and documentation of corrective actions.
ERPIMS Data Management The Contractor shall submit an Environmental Resources Program Information Management System (ERPIMS) Data Submission Schedule which will be used to establish the framework for ERPIMS data submissions. The Contractor shall record and enter field and laboratory data and submit this data, as specified in the latest ERPIMS Data Loading Handbook (DLH) using the latest version of the ERPIMS software utility (ERPTools). The AFCEC ERPIMS Webpage located at http://www.afcec.af.mil/What-We-Do/Environment/Restoration/ERPIMS/Search/ offers the latest DLH, ERPTools client software, ERPIMS policy, Help Desk contact info, data submission requirements, ERPTools training schedules, and more.
The Contractor shall be responsible for the accuracy and completeness of all data submitted. Field activity for projects with groundwater sampling normally includes recording and reporting field parameters and groundwater levels applicable to the sampling event. Chemistry data should include the appropriate Laboratory Quality Control (LABQC) data to include sufficient lab blanks and blank spikes per analytical batch (see QAPP). All data submitted by the Contractor shall correspond exactly with the data recorded in the original laboratory reports and other documents associated with sampling and laboratory tasks. The Recordkeeping section of the QAPP requires that laboratories shall maintain electronic and hardcopy records sufficient to recreate each analytical event conducted pursuant to the PWS. (CDRL B008) Hazardous Materials In the event the Contractor purchases a product that meets the tracking requirements of the Emergency Planning and Community Right-to-Know Act (EPCRA), or its state or local equivalent, or any hazardous material, the Contractor shall provide the appropriate installation office and the COR with any details required by them to accomplish tracking as soon as the acquired products are brought onto a government installation.
Pollution Prevention The Contractor shall conduct all operations and activities with the intent of reducing the amount of energy used and pollution generated. Specific areas to be focused on are generation of solid waste, use of hazardous materials, use of ozone depleting chemicals, generation of hazardous waste, and use of energy and water.
Site Survey: Not Applicable to this contract.
PART B - CONSTRUCTION AND ENVIRONMENTAL CONSTRUCTION
CONSTRUCTION AND ENVIRONMENTAL CONSTRUCTION - Not Applicable to this contract.
PART C - PERFORMANCE WORK STATEMENT FOR OPERATIONS & SERVICES
INTRODUCTION
The Contractor shall provide all labor, materials, and services necessary to deliver, for government review and approval, those studies and services that support environmental programs and projects in support of AFCEC and Maxwell AFB mission requirements. These include RAOs and associated reporting requirements. Specific compliance efforts may include tasks such as environmental monitoring, sampling, and analysis. General areas include studies; services; investigations; evaluations. The efforts include other related services for the continuation of an existing environmental program. Contractor personnel shall possess appropriate certifications and training to accomplish activities specified in this contract. These services are identified in paragraph 6.10.1.
Continuation of Essential DoD Contractor Services During Crisis The performance of these services is not expected to be mission essential during time of crisis. Should a crisis be declared, the CO or his/her representative will verbally advise the Contractor of the revised requirements, followed by written directions.
Environmental, Safety, and Occupational Health Compliance Assessment & Management Program (ESOHCAMP) - Not Applicable to this contract.
Air Quality - Not Applicable to this contract.
Cultural Resources - Not Applicable to this contract.
Hazardous Material The Contractor shall comply with all DoD Hazardous Materials programs including, but not limited to, hazardous materials and hazardous waste reduction programs. The Contractor shall operate, maintain or perform specified functions as listed above in support of hazardous material management programs.
Hazardous Waste Management The Contractor shall operate, maintain, and perform services in support of hazardous waste operations. The Contractor shall comply with all regulations governing the control of hazardous waste from its origin to ultimate treatment, storage, or disposal, such as RCRA; Hazardous and Solid Waste Act (HSWA); Air Force Instruction (AFI) 32-7042; and Solid and Hazardous Waste Management. The Contractor shall be responsible to ascertain and maintain documentation that all workers have been properly trained, including refresher courses as required.
Natural Resources - Not Applicable to this contract.
Pollution Prevention - Not Applicable to this contract.
Sustainable Development and Operations Support- Not Applicable to this contract.
Sampling, Testing, Analysis, and Monitoring The Contractor shall measure, sample, analyze, test and monitor media. This includes, but is not limited to, continuous and/or discrete measuring, sampling and analysis of groundwater, surface water, drinking water, influent, effluent, process streams, leak detection systems, air emissions, soils and any other environmental or process media. The Contractor shall sample, analyze, and test environmental media and monitor meteorological and process conditions in accordance with an established planning document such as a SAP or UFP-QAPP. The Contractor shall collect and process the analytical and test data in order to support the safe conduct of compliance or remediation projects, obtain information necessary for compliance or remediation system parameters to monitor the progress of environmental compliance, monitor remediation and system performance, demonstrate regulatory compliance, and establish that compliance and remediation goals have been achieved. The Contractor shall create and maintain written and electronic records. (CDRL A001a) Sampling The Contractor shall take representative samples of environmental media, including soil, sediment, ground water, surface water, drinking water, wastewater, waste materials, leachate, soil gas, ambient air and leak detection systems. To demonstrate air quality compliance Contractor shall sample effluents from equipment such as, but not limited to, incinerator stacks and soil vapor extraction discharge. The Contractor shall sample influent, effluent and process streams to demonstrate compliance with clean water act requirements pertaining to sanitary waste, industrial waste and/or storm water runoff. SAPs shall be prepared using the project Data Quality Objectives (DQOs) and additional guidance documents such as the Model Field Sampling Plan (FSP) and the appropriate quality assurance plan (e.g., UFP-QAPP). (CDRL A001a) Testing and Analysis The Contractor shall analyze and test environmental samples using standardized methods as prescribed in the "Test Methods for Evaluating Solid Wastes, Physical/Chemical Methods", current edition. Quantitative and qualitative analysis for selected analytes and physical properties shall be conducted. The Contractor shall ensure the defensibility of test and analytical results through execution of scientifically sound activities as outlined in the appropriate portion of the approved SAP or WP. (CDRL A001b) Evaluation of Environmental Monitoring and Testing Equipment: - Not Applicable to this contract.
Precision Leak Testing: - Not Applicable to this contract.
Long Term Monitoring and Long Term Operations and Maintenance This contract provides for the installation of nine new groundwater monitoring wells; puts in place the proper sampling frequency and analytes for LTM. The following lists all tasks, activities, reporting requirements, and deliverables associated with the LTM activities under this contract:
A. Well Installation:
The Contractor shall drill and install a total of nine (9) Type II groundwater monitoring wells (GWM) at locations determined in a preliminary site survey as described below.
· Two (2) of the GWM wells shall be constructed to a depth of 70 feet (ft) below ground surface (bgs) based on depth to groundwater of 60 feet bgs.
· Seven (7) of the GWM wells shall be constructed to a depth of 30 feet (ft) bgs based on a depth to groundwater of 20 feet bgs.
· All wells shall be Type II GWM wells with ten (10) feet of #10 slotted screen.
· Wells shall be constructed using 2-inch diameter Schedule 40 PVC.
· Wells shall be completed at the surface with a stick-up well casing, a maximum of four protective bollards shall be installed around the well, and a brass tag shall be installed that identifies the well’s identification.
· Each new well shall be developed using the surge and bail or surge and pump method. Field parameters (pH, dissolved oxygen, turbidity, oxygen reduction potential, temperature) shall be used to determine when each well has been properly developed, with the predominant criteria being turbidity.
· Survey the location and elevation (both ground elevation and top of casing elevation) for each newly installed groundwater monitoring well by a State-licensed Land Surveyor.
· Waste shall be containerized and temporarily stored at a location to be approved by the Base Point of Contact (POC). The Contractor shall characterize the waste based on representative samples for profiling. The Contractor shall coordinate off-site transport and disposal of waste. All profiles and manifests will be signed by the Air Force.
B. Semi-annual Groundwater Sampling Groundwater sampling shall be performed on a semi-annual basis semi-annually at Sites LF003, LF004, LF005, and LF006 at Maxwell AFB for a period of 24 months as described below:
· Sample fifteen (15) existing and nine (9) newly installed wells for a total of twenty (24) GWM wells using low flow purge/sample techniques.
· Sample seventeen (17) wells installed to an average depth of thirty (30) ft. bgs, with an average depth to groundwater of twenty (20) ft bgs.
· Sample seven (7) wells installed to an average depth of seventy (70) ft. bgs, with an average depth to groundwater of 60 ft.
· Groundwater samples shall be tested for the following:
· Volatile Organic Compounds (VOCs)
· Semi-volatile Organic Compounds (SVOCs)
· TPH (GRO, DRO, and ORO fractions)
· RCRA 13 metals (total and dissolved), and
· Pesticides (organophosphate and organochlorine types).
· Groundwater elevation and water quality parameters shall be collected (dissolved oxygen (DO), oxidation reduction potential (ORP), specific conductance, pH, turbidity, and temperature).
· Collect appropriate QA/QC groundwater samples, including duplicate samples, Matrix Spike/Matrix Spike Duplicate (MS/MSD) samples, trip blanks, and equipment decontamination blanks.
· Provide Stage 4 data reports from the laboratory. Perform a minimum Stage 2b validation of 100 percent of the data and document the data validation in a data usability report that shall be provided as an appendix to the Semi-annual Long Term Monitoring Reports.
· Data shall be submitted electronically (ERPIMS) within 90 calendar days following collection of the final sample.
· Purge water and decontamination water shall be containerized and temporarily stored at a location to be approved by the Base Point of Contact (POC). The Contractor shall characterize the waste based on representative samples for profiling. The Contractor shall coordinate off-site transport and disposal of waste. All profiles and manifests will be signed by the Air Force.
C. Semi-annual Long Term Management Monitoring Reports The Contractor shall complete a total of two (2)four (4) Semi-annual Long-Term Monitoring Reports for Sites LF003, LF004, LF005, and LF006. The first Semi-Annual Long-Term Monitoring Report shall also discuss and document including a discussion and document for the fieldwork activities related to the well installation of the nine (9) new Type II groundwater monitoring wellsand development.
The Contractor shall produce a single Semi-annual LTM report for all four (4) landfill sites combined (one report at the conclusion of each sampling event). All deliverables shall be submitted in hard copy and electronic (PDF) formats in accordance with the CDRLs: The Contractor shall prepare draft, draft final, and final reports. (CDRL A001c).
D. Proposed Plan and Record of Decision The Contractor shall prepare a single Proposed Plan (PP) and a single Record of Decision (ROD) for the four (4) landfills at Maxwell AFB. The PP and ROD shall be prepared utilizing a format approved by the COR.
The Contractor shall submit a copy of the final PP to the Montgomery Public Library, 245 High Street and to the on-line Air Force Administrative Record prior to initiating the 30-day public comment period. Up to two (2) Contractors shall attend one public meeting associated with the public comment period for the PP. To advertise the availability of the PP for public review and comment, one (1) advertisement shall be placed in a local newspaper selected or approved by the COR. The Contractor shall present technical information and provide logistical support (e.g., facilities, audiovisual, handouts, report(s), recordings, verbatim transcripts, translations, slides, and synopsis) for the public meeting support of the government’s position.
Following completion of the public comment period and public meeting, the Contractor shall prepare a responsiveness summary report documenting the public comments received and the resolution for each comment. The ROD shall contain the responsiveness summary report.
The Contractor shall provide a draft, draft final and final versions of all documents. The draft final versions of the PP and ROD shall be submitted for regulatory review. The Contractor shall assume 90 days will be required for Air Force concurrence of the PP/ROD. (CDRLs A001d)
Process Monitoring – Not applicable to this contract.
The Contractor shall monitor, adjust, and/or repair remedial equipment and monitoring equipment to ensure that performance measurements are consistent with optimal operational parameters, reliability goals are being met, the progress of remediation is consistent with system expectations, and compliance with applicable statutes and regulations is demonstrated.
Recordkeeping The Contractor shall create and maintain in one location written and electronic records sufficient to recreate each sampling, analytical, testing and monitoring event (i.e. ERPIMS Submittals). The Contractor shall make these records available to the government upon request.
The Contractor shall maintain records of, and derived from, all activities outlined in the appropriate portion of the SAP or QPP supporting the generation of these sampling and analysis records. The Contractor shall also retain written calculations using information obtained from sampling, analysis monitoring and testing activities, to include all raw data.