FA8903-16-R-0034_Exhibit_A_(ao_12_DEC_2016).pdf

PDF 527 KB Posted

Attached to
772 ESS/PK Contract Close-Out, Office Operations and Administrative Support Services Federal contract opportunity
Solicitation number
FA8903-16-R-0034
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to 772 ESS/PK Contract Close-Out, Office Operations and Administrative Support Services, newest first.
File Type Posted
Questions_and_Answers_Round_1.xlsx XLSX spreadsheet
Questions_and_Answers_Round_3.docx DOCX document
Questions_and_Answers_Round_2.xlsx XLSX spreadsheet
ConWrite__08_-_22_DEC_2016.pdf PDF
Att_03r_WAGE_DETERMINATIONS_Edited__FINAL.pdf PDF
Att_04_Government_Pricing_Spreadsheet_(ao_22_December_2016).xlsx XLSX spreadsheet
Att_02_RFP_(ao_22_December_2016)_FINAL.docx DOCX document
772_ESS_PWS_Close_Operations_Admin_(ao_22DEC2016)_(012).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(COMPUTER GENERATED)

CONTRACT DATA REQUIREMENTS LIST

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate forInformation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item) Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT 10. FREQUENCY

11. AS OF DATE

12.DATE OF FIRST SUBMISSION

13.DATE OF SUBSEQUENT

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages USAPPC V3.00

REQUIRED

SUBMISSION

000X A MGMT

ADMINISTRATIVE/CONTRACT SUPPORT FA8903-16-R-0034 TBD

A001 STATUS REPORT PROJECT STATUS REPORT

DI-MGMT-80368A PWS PARA - 2.2.1, 2.2.2, 2.2.3, 5.0 772 ESS/PKS

LT

A B

MTHLY

NATALIE NEEB, 772 ESS/PKS12/12/2016DAVID HOLGUIN

N/A

12/12/2016

772 ESS/PKS 0 0 1

DCMAO 0 0 1

SEE BLOCK 16

NSP

BLOCK 16

BLOCK 16BLOCK 16

0 0 2

Block 4: DID Tailoring: Contractor compliance is mandatory for Data Item Description, DI-MGMT-80368A.

Paragraph 3.2.3 Does not apply.

Paragraph 3.2.4, Contract Deliveries Status. Deliverables shall be identified by contract number, task order number, CDRL data item number, title of data item, status (draft or final), and delivery date.

Block 11: The last business day of each month.

Blocks 12 & 13: Not later than 5 business days after the end of each month.

Block 14: Deliverables shall be submitted by e-mail. The Government uses Microsoft Office Products and pdf format. Quantities of required copies and additional addressees, if required, will be specified in each Task Order.

1 1

FOR OFFICIAL USE ONLY

FA8903-16-R-0034

Exhibit: A

DATA ITEM DESCRIPTION

Title: Status Report

Number: DI-MGMT-80368A Approval Date: 30 OCT 2006 AMSC Number: 7619 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship:

The Status Report documents the status of contractor effort towards achieving contract objectives. It identifies accomplishments to date and difficulties encountered, and compare the status achieved to planned goals and the resources expended. It is used by the Government to monitor and evaluate contractor performance.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

It is not intended that all requirements herein should be applied to every program.

Portions of the DID are subject to tailoring by deletion depending on the specific status reporting requirements of the project.

This DID is related to DI-FNCL-80331, Funds and Man-Hour Expenditure Report which can be used in conjunction with this report if paragraph 3.2.3 below is deleted.

This DID supersede DI-MGMT-80368.

Requirements:

1. Reference documents. None.

2. Format. The Status Report shall be in contractor format.

2.1 Identification. The data indicated below shall be contained on a title page or on the first page of the report.

a. Title/identification of the system/component/program/project.

Source: https://assist.dla.mil -- Downloaded: 2015-08-12T16:52Z Check the source to verify that this is the current version before use.

FA8903-16-R-0034

DI-MGMT-80368A

b. Type of report (e.g., monthly, interim, final).

c. Period covered by the report.

d. Contract number.

e. Preparing activity or contractor’s title.

f. Security classification, when required.

g. Distribution Statement.

2.2 Page size. The report shall be on 8 ½ by 11 inch (metric A4) paper.

3. Content. The report shall contain the following:

3.1 Summary. The summary shall include a brief statement of the overall project status , covering the accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact, and recommended solutions.

3.2 Body of report. The Status Report shall contain the following items, where applicable:

3.2.1 Milestone/task status. The status of each milestone/task as defined by the statement of work or contract, as applicable:

a. A statement as to whether or not the program/project/task is on schedule; if not, the effort planned to meet the schedule shall be indicated. Include an overall status of each milestone, task, or unit of work. Include update schedule sheets, milestone charts, or task synopsis sheets identifying phase of task and percentage of completion of each task, technical instruction, or order.

b. A comparison of achieved end-product performance capabilities projected against contract baseline values, requirements, or allocations.

c. Effort expended on each task to date, and a brief description of technical developments and accomplishments.

d. Key dates in any testing program and description of tests performed and significant test results. If applicable, a description of the amount and type of down time on the equipment or system under test.

e. A list of all designs completed and a brief description of each item. For designs in process, provide estimated dates for design and drawing completion.

f. A narrative of outstanding problems existing as of the previous status report, and their resolution status. 2

Source: https://assist.dla.mil -- Downloaded: 2015-08-12T16:52Z Check the source to verify that this is the current version before use.

FA8903-16-R-0034

DI-MGMT-80368A

g. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.

h. Significant results of conferences, trips, or directives for the Contracting officer’s representatives.

i. Any other information which may cause significant changes in the program schedule.

3.2.2 Future plans. Summary of future plans, recommendations and proposals both for the next reporting period and for any long term plans.

3.2.3 Itemized man-hours and costs. Itemized man-hour and cost expenditure incurred for the reporting period by category and task, total contractual expenditures, and funds remaining as of the reporting date.

3.2.4 Contract deliveries status. The status of each deliverable end item, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, security classification, and schedule due date information.

3.2.5 Report preparer. Name of person(s) preparing report and telephone number(s).

3.3 Appendices. Appendices where applicable, for tables, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.

4. END OF DI-MGMT-80368A

Source: https://assist.dla.mil -- Downloaded: 2015-08-12T16:52Z Check the source to verify that this is the current version before use.

FA8903-16-R-0034

DI-MGMT-80368A.pdf
DATA ITEM DESCRIPTION
Requirements:

File details come from the government source that posted it. Updated .