02_A-K_A0003_20090608.doc

DOC document 559 KB Posted

Attached to
GPS Advanced Control Segment (OCX) Blocks 1 & 2 Federal contract opportunity
Solicitation number
FA8807-09-R-0003
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

A-K in MS Word

View the file

Other files for this federal contract opportunity

Other files attached to GPS Advanced Control Segment (OCX) Blocks 1 & 2, newest first.
File Type Posted
09 Atch 02_Compliance_Reference Document_A0003_20090607.doc DOC document
01_A-K_A0003_20090608.pdf PDF
03 Section L_A0003_20090607.doc DOC document
00_OCX RFP A0003_20090608.pdf PDF
07 Exhibit A CDRL List_A0002_20090529.doc DOC document
A0002_20090602.pdf PDF
09 Atch 02_Compliance_Reference Document_A0002_20090528.doc DOC document
06 Exhibit A CDRL List_A0002_20090529.pdf PDF
08_Atch_01_GSOW_A0002_20090528.doc DOC document
15_Atch_07_GFP_A0002_20090528.doc DOC document
03 Section L_A0002_20090601.doc DOC document
A-K Conformed_A0001_20090519.doc DOC document
OCX RFP A0001 —
21_Atch_13_System_Modifications_(29_Apr_09).doc DOC document
03_Section_L_A0001_20090519.doc DOC document
08_Atch_01_GSOW_A0001_20090519.doc DOC document
A-K_A0001_20090519.pdf PDF
21_Atch_13_System_Modifications_(29_Apr_09).doc DOC document
16_Atch_08_Data_Rights_A0001_20090519.doc DOC document
16_Atch_08_Data_Rights_A0001_20090519.doc DOC document
01 Section A-K —
17_Atch_09_Small_Business_(29_Apr_09).doc DOC document
10_Atch_03_CWBS_Dictionary_(29_Apr_09).docx DOCX document
06 Exhibit A CDRL List —
14_Atch_06_DD254_(29_Apr_09).doc DOC document
22_Atch_14_Capability_Insertion_Program_(29_Apr_09).doc DOC document
13 Atch 06_DD 254 —
08_Atch_01_GSOW_(29_Apr_09).docx DOCX document
12_Atch_05_Award_Fee_Plan_(29_Apr_09).doc DOC document
18_Atch_10_OCI_(29_Apr_09).doc DOC document
15_Atch_07_GFP_(29_Apr_09).doc DOC document
03_Section_L_(29_Apr_09).doc DOC document
04_Section_L_Annex_(29_Apr_09).doc DOC document
16_Atch_08_Data_Rights_(29_Apr_09).docx DOCX document
09_Atch_02_Compliance_Reference_Document_(29_Apr_09).doc DOC document
07_Exhibit_A_CDRL_List_(29_Apr_09).docx DOCX document
05_Section_M_(29_Apr_09).doc DOC document
23_Atch_15_Performance_Incentive_Plan_(29_Apr_09).doc DOC document
19_Atch_11_Special_Studies_(29_Apr_09).doc DOC document
11_Atch_04_IMP_(29_Apr_09).doc DOC document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)

RATING

DO-A2

PAGE OF PAGES

1 83

2. CONTRACT NO.
3. SOLICITATION NO.
4. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

FORMCHECKBOX

NEGOTIATED (RFP)

5. DATE ISSUED

29 APR 2009

6. REQUISITION/PURCHASE NO.

FA8807-09-R-0003

7. ISSUED BY GPSW/PK
CODE
FA8807
8. ADDRESS OFFER TO (If other than Item 7)

SPACE & MISSILE SYSTEMS CENTER

483 N. AVIATION BLVD

EL SEGUNDO, CA 90245-2808

SARA E. LAWLYES 310-653-3451

SARA.LAWLYES@LOSANGELES.AF.MIL

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

SOLICITATION

9. See attached Section L for proposal instructions.

10. FOR

INFORMATION

CALL:

A. NAME

SARA E. LAWLYES

B. TELEPHONE (Include area code)

(NO COLLECT CALLS)

(310) 653-3451

C. E-MAIL ADDRESS

Sara.Lawlyes@losangeles.af.mil

11. TABLE OF CONTENTS

(()
SEC.
DESCRIPTION
PAGE(S)
(()
SEC
DESCRIPTION
PAGE(S)
PART I - THE SCHEDULE
PART II - CONTRACT CLAUSES
(
A
SOLICITATION/CONTRACT FORM
1
(
I
CONTRACT CLAUSES
62
(
B
SUPPLIES OR SERVICES AND PRICES/COSTS
2
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACH.
(
C
DESCRIPTION/SPECS./WORK STATEMENT
25
(
J
LIST OF ATTACHMENTS
82
(
D
PACKAGING AND MARKING
26
PART IV - REPRESENTATIONS AND INSTRUCTIONS
(
E
INSPECTION AND ACCEPTANCE
27
(
K
REPRESENTATIONS, CERTIFICATIONS,
K - 1
(
F
DELIVERIES OR PERFORMANCE
30

AND OTHER STATEMENTS OF OFFERORS

(
G
CONTRACT ADMINISTRATION DATA
32
(
L
INSTRS, CONDS, AND NOTICES TO OFFERORS
L - 1
(
H
SPECIAL CONTRACT REQUIREMENTS
34
(
M
EVALUATION FACTORS FOR AWARD
M - 1

OFFER (Must be fully completed by offeror)

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ____270____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date of receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

10 CALENDAR DAYS

20 CALENDAR DAYS

30 CALENDAR DAYS

CALENDAR DAYS

14. ACKNOWLEDGEMENTS OF AMENDMENTS

(The offeror acknowledges receipt of amend-

AMENDMENT NO.
DATE
AMENDMENT NO.
DATE

ments to the SOLICITATION for offerors and related documents numbered and dated:

15A. NAME

AND

CODE

FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

ADDRESS

OF

OFFEROR

15B. TELEPHONE NO. (Include area code)

15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE
18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED
20. AMOUNT
21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETI-

TION:

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

FORMCHECKBOX

10 U.S.C. 2304(c) ( ) FORMCHECKBOX 41 U.S.C. 253(c) ( )

24. ADMINISTERED BY (If other than Item 7) CODE

25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print)
27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION
STANDARD FORM 33 (REV. 9-97)
PREVIOUS EDITION IS UNUSABLE
Prescribed by GSA

ConWrite Version 6.10.8 FAR (48 CFR) 53.21(c)

Created 08 Jun 2009 5:49 PM

Qty Unit Price

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

OCX BLOCK 1.0 DEVELOPMENT

Lot

Noun:

NSN:

N - Not Applicable

Contract type:

V - COST PLUS INCENTIVE FEE

Inspection:

DESTINATION

Acceptance:

FOB:

Descriptive Data:

The Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1 'Statement of Work', dated *, paragraphs 3.1 (except 3.1.1.i), 3.2, 3.4, 3.9.1, 3.11-3.17, 3.18.2-3.18.6, and 4.1-4.10; and Attachment 4 'Integrated Master Plan', dated *, paragraphs * attached hereto and made a part hereof. Incentive fee shall be in accordance with FAR 52.216-10 'Incentive Fee'.

(CPIF/AF Completion)(3600 Funds)

Target Cost:

Target Fee:

Base Fee:

* To be inserted by the Offeror

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

OCX BLOCK 2.0 DEVELOPMENT

The Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h), 3.2, 3.4, 3.9.1, 3.11-3.17, 3.18.2-3.18.6, and 4.1-4.10; and Attachment 4, paragraphs *. Incentive fee shall be in accordance with FAR 52.216-10.

(CPIF/AF Completion)(3600 Funds)

Target Cost:

* To be inserted by the Offeror

SIMULATORS & TRAINERS

Unit

GPS SYSTEM SIMULATOR (GSYS)

The Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.6 and 3.18.1 and Attachment 4, paragraphs *. Incentive fee shall be in accordance with FAR 52.216-10.

(CPIF/AF Completion)(3600 Funds)

Target Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

Unit

CREW TRAINING SYSTEM (CTS)

The Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraph 3.5 and 3.18.7, and Attachment 4, paragraphs *. Incentive fee shall be in accordance with FAR 52.216-10.

CPIF/AF Completion)(3600 Funds)

Target Cost:

* To be inserted by the Offeror

CAPABILITY INSERTION PROGRAM

OPTION CLIN

CAPABILITY INSERTION PROGRAM (CIP)

R - COST PLUS AWARD FEE

The Contractor shall perform Capability Insertion Program tasks as directed by the Contracting Officer in accordance with H028, 'Option to Acquire Capability Insertion Program Tasks'; Attachment 1, paragraph 6 and Attachment 14, 'Capability Insertion Program', dated * attached hereto and made a part hereof.

(CPAF LOE)(3600 Funds)

Hours Authorized:

Estimated Cost:

* To be completed by the Offeror ** To be completed by the Government upon issuance of each task. A new CIP CLIN from the 0400 series will be established each year the CIP option is exercised. Separate CLINs may be established for individual tasks at the discretion of the Contracting Officer.

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

PECULIAR SUPPORT EQUIPMENT

PECULIAR SUPPORT EQUIPMENT (PSE)

The Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraph 3.7 and Attachment 4, paragraphs *. Incentive fee shall be in accordance with FAR 52.216-10.

(CPIF/AF Completion)(3600 Funds)

Target Cost:

Target Fee:

Base Fee: $*

DATA AND REPORTS

NSP

NSP

ACRN:

U

DD1423 is Exhibit:

A

The Contractor shall provide data and reports in accordance with Exhibit A, 'Contract Data Requirements List (CDRL)' dated *, attached hereto and made a part hereof. The cost of the data and reports is included in the costs of CLINs 0100, 0200, 0300, 0350, and 0600 CLINs (and Option CLINs 0400 (series), 1000 (series), 2000, 2100, 2200, 2300, 2400, 2501-05, 2601-05, 2701-05, 2801-05, 2901-05, 3000, if exercised), with the exception of CDRL A076 (costs for technical orders included in the costs of CLIN 0710).

Not Separately Priced (NSP).

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

TECHNICAL ORDERS FOR BLOCKS 1.0 & 2.0

DD1423 is Exhibit:

A

The Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.6-3.8; and Attachment 4, paragraphs *. Incentive fee shall be in accordance with FAR 52.216-10.

(CPIF/AF Completion)(3600 Funds)

Target Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

SPECIAL STUDIES

SPECIAL STUDIES

In the event that this option is exercised in accordance with H029, 'Option to Acquire Special Studies', the Contractor shall perform special studies as directed by the Contracting Officer in accordance Attachment 1, paragraph 5; and Attachment 11, 'Special Studies', dated * attached hereto and made a part hereof.

(CPAF LOE)(3600/3400/3080 Funds, depending on nature of study)

Hours Authorized:

Estimated Cost:

** To be completed by the Government upon issuance of each study. A new special studies CLIN from the 1000 series will be established each year the special studies option is exercised. Separate CLINs may be established for individual studies at the discretion of the Contracting Officer.

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

INTERIM CONTRACT SUPPORT (ICS)

ICS FOR BLOCK 1.0

In the event this option is exercised in accordance with H030, 'Options to Acquire Interim Contractor Support for Block 1.0', the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraph 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.9.2.1 (except 3.9.2.1.l-n), 3.9.2.2-3.9.2.6, 3.11, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3600 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

ICS FOR BLOCK 1.0 - 6 MONTH EXTENSION

In the event this option is exercised in accordance with H030, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraph 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.9.2.1 (except 3.9.2.1.l-n), 3.9.2.2-3.9.2.6, 3.11, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE )(3600 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

ICS FOR BLOCK 1.0 - ADDITIONAL 6 MONTH EXTENSION

In the event this option is exercised in accordance with H030, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraph 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.9.2.1 (except 3.9.2.1.l-n), 3.9.2.2-3.9.2.6, 3.11, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3600 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

TRANSITION SUPPORT

TRANSITION SUPPORT FROM OCS TO OCX BLOCK 1.0

In the event this option is exercised in accordance with H031, 'Option to Acquire Transition Support', the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.9.2.1.l-n, 3.11, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3600 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

TRANSITION SUPPORT FROM OCX BLOCK 1.0 to BLOCK 2.0

In the event this option is exercised in accordance with H031, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3600 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

SUSTAINMENT SUPPORT

SOFTWARE MAINTENANCE LEVEL I - YEAR 1

In the event this option is exercised in accordance with H032, 'Options to Acquire Software Maintenance', the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.1, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

SOFTWARE MAINTENANCE LEVEL I - YEAR 2

In the event this option is exercised in accordance with H032, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.1, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

SOFTWARE MAINTENANCE LEVEL I - YEAR 3

In the event this option is exercised in accordance with H032, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.1, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

SOFTWARE MAINTENANCE LEVEL I - YEAR 4

In the event this option is exercised in accordance with H032, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.1, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

SOFTWARE MAINTENANCE LEVEL I - YEAR 5

In the event this option is exercised in accordance with H032, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.1, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

SOFTWARE MAINTENANCE LEVEL II - YEAR 1

In the event this option is exercised in accordance with H032, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.2, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

SOFTWARE MAINTENANCE LEVEL II - YEAR 2

In the event this option is exercised in accordance with H032, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.2, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15..

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

SOFTWARE MAINTENANCE LEVEL II - YEAR 3

In the event this option is exercised in accordance with H032, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.2, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

SOFTWARE MAINTENANCE LEVEL II - YEAR 4

In the event this option is exercised in accordance with H032, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.2, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

SOFTWARE MAINTENANCE LEVEL II - YEAR 5

In the event this option is exercised in accordance with H032, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.2, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

HARDWARE MAINTENANCE LEVEL I - YEAR 1

In the event this option is exercised in accordance with H033, 'Options to Acquire Hardware Maintenance', the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.3, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

HARDWARE MAINTENANCE LEVEL I - YEAR 2

In the event this option is exercised in accordance with H033, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.3, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

HARDWARE MAINTENANCE LEVEL I - YEAR 3

In the event this option is exercised in accordance with H033, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.3, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

HARDWARE MAINTENANCE LEVEL I - YEAR 4

In the event this option is exercised in accordance with H033, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.3, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

HARDWARE MAINTENANCE LEVEL I - YEAR 5

In the event this option is exercised in accordance with H033, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.3, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

HARDWARE MAINTENANCE LEVEL II - YEAR 1

In the event this option is exercised in accordance with H033, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.4, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

HARDWARE MAINTENANCE LEVEL II - YEAR 2

In the event this option is exercised in accordance with H033, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.4, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

HARDWARE MAINTENANCE LEVEL II - YEAR 3

In the event this option is exercised in accordance with H033, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.4, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

HARDWARE MAINTENANCE LEVEL II - YEAR 4

In the event this option is exercised in accordance with H033, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.4, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

HARDWARE MAINTENANCE LEVEL II - YEAR 5

In the event this option is exercised in accordance with H033, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraphs 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.4, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

TECH ORDER SUPPORT - YEAR 1

In the event this option is exercised in accordance with H034, 'Options to Acquire Technical Order Support', the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraph 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.5, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

TECH ORDER SUPPORT - YEAR 2

In the event this option is exercised in accordance with H034, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraph 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.5, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

TECH ORDER SUPPORT - YEAR 3

In the event this option is exercised in accordance with H034, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraph 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.5, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

TECH ORDER SUPPORT - YEAR 4

In the event this option is exercised in accordance with H034, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraph 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.5, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise

TECH ORDER SUPPORT - YEAR 5

In the event this option is exercised in accordance with H034, the Contractor shall furnish all supplies and services necessary to accomplish the work set forth in Attachment 1, paragraph 3.1 (except 3.1.1.h and 3.1.1.i), 3.4-3.8, 3.11, 3.24.5, 4.1, 4.3-4.5, 4.7-4.9, 4.10.1-4.10.4, 4.10.6, and 4.10.8-4.10.15.

(CPAF LOE)(3400 Funds)

Hours Authorized:

Estimated Cost:

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

SYSTEM MODIFICATIONS

SYSTEM MODIFICATIONS

In the event this options is exercised in accordance with H035, 'Options to Acquire System Modifications', the Contractor shall perform system modifications as directed by the Contracting Officer in accordance with Attachment 1, paragraph 7.

(CPAF LOE)(3080 and 3400 Funds)

Hours Authorized:

Estimated Cost:

** To be inserted by the Government upon option exercise. A System Modifications CLIN from the 3000 series will be established each year the option is exercised. Separate CLINs may be established for individual tasks at the discretion of the Contracting Officer.

AWARD FEE AND PERFORMANCE & SCHEDULE INCENTIVE

PERIOD 1

The Contractor may earn fee in the performance of this contract in accordance with Attachment 5 'Award Fee Plan' and Attachment 15 'Performance and Schedule Incentive'. The Contracting Officer will add fee CLIN(s) from the 5000 series as necessary to obligate funds for fee earned.

(3600/3080/3400 Funds, depending on the Fee Period)

Award Fee earned:

Performance and Schedule Incentive earned:

* To be inserted by the Government, as necessary.

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

B001. PRICES/COSTS (FEB 2009)

(a) The totals for Cost Plus Incentive Fee/Award Fee CLINs 0100, 0200, 0300, 0350, 0600 and 0710 are identified below. The target fee set forth below may be increased or decreased only by negotiation and modification of the contract for added or deleted work. Incentive fee shall be paid as it accrues in regular installments based upon the percentage of completion of work.

(1) Total Target Cost:

(2) Total Target Fee:

(3) Min Fee:

(4) Max Fee:

(5) Base Fee:

(b) The total estimated cost for Cost Plus Award Fee CLINs ** is:

(c) The total Award Fee earned to date is:

(d) The Provisional Award Fee paid to date is:

(e) The Performance Incentive paid to date is:

(f) The total amount of this contract is [(a)(1) + (a)(2) + (a)(5) + (b) + (c) + (d) + (e)]:

** To be inserted by the Government

B002. IMPLEMENTATION OF LIMITATION OF FUNDS (FEB 2009)

a) Pursuant to FAR 52.232-22, 'Limitation of Funds', the total amounts available for payment of costs and incentive fee (as applicable) and allotted to this contract is sufficient to cover performance as follows:

CLIN
Amount Allotted for Cost
Amount Allotted for Fee
Funds Coverage

Date

0100
**
**
**
0200
**
**
**
0300
**
**
**
0350
**
**
**
0600
**
**
**
0710
**
**
**

** To be inserted by the Government

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

C001. INCORPORATION OF STATEMENT OF WORK AND COMPLIANCE AND REFERENCE DOCUMENTS LIST AND TAILORING (FEB 2009)

Attachment 1, Statement of Work and Attachment 2, Compliance and Reference Documents List and Tailoring are hereby incoporated by reference into Section C.

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

D001. CONTRACTOR COMMERCIAL PACKAGING (FEB 2009)

(a) All items shall be packaged in accordance with the Contractor's commercial best practice to ensure undamaged arrival at destination. Individual shipments exceeding 150 pounds, 108 inches in length, or 130 inches in girth plus length shall be packaged on skidded crates or palletized to allow handling by forklift.

(b) The exterior container shall be marked (readable from 24 inches): "NOT FOR OUTSIDE STORAGE."

D002. PACKAGING AND MARKING OF HAZARDOUS MATERIAL (FEB 2009)

Hazardous materials shall be prepared for shipment in accordance with the following applicable regulations for the individual shipment hazard, ultimate destination, and mode of transportation:

(a) Code of Federal Regulations (CFR) Title 29, Part 1910.1200;

(b) Code of Federal Regulations (CFR) Title 49;

(c) Air Force Joint Manual (AFJAM) 24-204, Preparing Hazardous Materials for Military Air Shipment;

(d) International Civil Aviation Organization (ICAO) Technical Instructions for the Safe Transport of Dangerous Goods by Air; and

(e) International Maritime Dangerous Goods (IMDG) Code.

I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

A. FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.246-03

INSPECTION OF SUPPLIES -- COST-REIMBURSEMENT (MAY 2001)

52.246-05

INSPECTION OF SERVICES -- COST-REIMBURSEMENT (APR 1984)

52.246-08

INSPECTION OF RESEARCH AND DEVELOPMENT -- COST-REIMBURSEMENT (MAY 2001)

52.246-11

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (FEB 1999)

Title, number (if any), date, and tailoring (if any) of the higher-level quality standards: 'SAE AS9100B'

52.246-15

CERTIFICATE OF CONFORMANCE (APR 1984)

52.246-16

RESPONSIBILITY FOR SUPPLIES (APR 1984)

B. DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT CONTRACT CLAUSES

252.246-7000

MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

E001. PAYMENT REQUEST AND RECEIVING REPORT SUBMISSION INSTRUCTIONS (FEB 2009)

(a) Pursuant to DFARS 252.232-7003, Electronic Submission of Payment Requests, use of the Wide Area Work Flow - Receipt and Acceptance (WAWF-RA) system for electronic submission of payment requests and receipt/acceptance documents is mandatory for this award. In accordance with DFARS 252.246-7000, Material Inspection and Receiving Report, use of WAWF-RA fulfills the requirements for submission of DD Form 250s.

(b) Technical reports are not to be submitted as attachments in WAWF-RA. See Exhibit A for delivery instructions and addresses for these reports.

(c) A copy of the receiving report printed from WAWF-RA shall accompany each shipment which requires a DD Form 250/receiving report.

(d) PROCESSING STATUS. Any inquiry as to the processing status of a payment request or receiving report should be made to the following office:

*ACO name

*Address

*Telephone number

*E-mail address

(e) In addition, a copy of the DD Form 250 shall accompany each shipment for all deliverable items. Shipment addresses are specified in Section F of the schedule.

* To be completed by the Offeror.

E002. INSPECTION AND ACCEPTANCE OF CLINS (FEB 2009)

(a) INSPECTION OF CLINs 0100, 0200, 0300, 0350, 0600, and 3000 series:

The Defense Contract Management Agency (DCMA) Quality Assurance Representative (QAR) will complete a receiving inspection report documenting initial inspection after successful Functional Configuration Audit/ Physical Configuration Audit (FCA/PCA) in accordance with the Government-approved Systems Engineering Management Plan (SEMP) (CDRL item A037).

(b) ACCEPTANCE OF BLOCKS 1.0 AND 2.0 (CLINs 0100 and 0200):

Acceptance shall be made via DD250 by the appropriate Government personnel after:

(1) Applicable SS-CS-800 requirements verified in accordance with the approved verification method in DOORS and the applicable Government-approved Test Plan (CDRL item A067);

(2) Successful FCA/PCA in accordance with the Government-approved SEMP;

(3) OCX is installed, tested, and applicable SS-CS-800 requirements verified at the MCS, AMCS, and TSF;

(4) Connectivity to all AF ground antennas, AF monitor stations, AFSCN, NGA monitor stations, and between MCS and AMCS is functioning and meets SS-CS-800 requirements;

(5) Sustainment Configuration Management processes in place in accordance with MIL-STD-973 and GPSW 01 63- 1101;

(6) Transition Problem Report (PR) process in place in accordance with AF T.O. 00-35D-54;

(7) Security Accreditation is achieved for all elements of OCX applicable to the block delivery;

(8) Cadre (Type 1) Training complete in accordance with Attachment 1, Statement of Work paragraph 3.5(h);

(9) Tech Orders are Certified and Verified in accordance with AF-TM-86-01K.1;

(10) Training systems are installed and certified in accordance with Space Training Contract

Requirements; and

(11) 100% of the Critical Spares are in place.

(c) ACCEPTANCE OF CLINs 0300, 0600, and 3000 series:

Acceptance shall be made via DD250 by the appropriate Government personnel after successful FCA/PCA in accordance with the Government-approved SEMP.

(d) ACCEPTANCE OF CTS (CLIN 0350):

Acceptance shall be made via DD250 by the appropriate Government personnel after:

(1) Successful FCA/PCA in accordance with with the contractor's approved CDRL item

A037, SEMP;

(2) Government acceptance of training materials in CDRL A060; and

(3) Space Training Contract Requirements for SIMCERT are met.

E003. IMPLEMENTATION OF FAR 52.246-3, 'INSPECTION OF SUPPLIES - COST-REIMBURSEMENT' (APPLICABLE TO CLINS 0100 AND 0200 ONLY) (FEB 2009)

(a) Paragraph (f) of FAR 52.246-3, 'Inspection of Supplies - Cost Reimbursement' as it applies to CLINs 0100 and 0200 is deleted and replaced as follows:

At any time during contract performance, but no later than the dates indicated below, the

Government may require the Contractor to replace or correct any supplies that are nonconforming at the time of delivery. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. Except as otherwise provided in paragraph (h) below, the cost of replacement or correction shall be included in allowable cost, determined as provided in the

Allowable Cost and Payment clause, but no additional fee shall be paid. The Contractor shall not tender for acceptance supplies required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken.

(1) CLIN 0100: Air Force Space Command operationally accepts Block 1.0 in accordance with AFSPCI 10-601.

(2) CLIN 0200: Air Force Space Command operationally accepts Block 2.0 in accordance with AFSPCI 10-601.

(b) All other terms and conditions of FAR 52.246-3 remain unchanged and in full force and effect.

SHIP

MARK

TRANS

ITEM

SUPPLIES SCHEDULE DATA

QTY

TO

FOR

PRI

DATE

FA8807

31 Oct 2013

30 Nov 2014

FB2500

FY2511

GPS SYSTEM SIMULATOR (GSYS)

FB2500

31 Jul 2013

FY2511

31 Jul 2013

CREW TRAINING SYSTEM (CTS)

30 Nov 2014

PECULIAR SUPPORT EQUIPMENT (PSE)

ASREQ

U

Delivery dates are provided in each DD Form 1423 in Exhibit A, 'Contract Data Requirements List'.

ASREQ

TECHNICAL ORDERS FOR BLOCKS 1.0 & 2.0

Delivery dates are provided in DD Form 1423 for A076 Exhibit A.

I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.242-15

STOP-WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984)

52.247-34

F.O.B. DESTINATION (NOV 1991)

II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

F001. PERIOD OF PERFORMANCE (FEB 2009)

The period of performance under this contract shall be from the date of contract award through 30 Nov 2014.

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

G001. PAYMENT INSTRUCTIONS FOR MULTIPLE ACCOUNTING CLASSIFICATION CITATIONS (FEB 2009)

(a) All invoices/vouchers received at the Defense Finance and Accounting Service (DFAS) for disbursement shall be submitted electronically in accordance with FAR 52.232-33, 'Payment by Electronic Funds Transfer - Central Contract Registration'. Payments will be made via Electronic Data Interchange (EDI) through the Wide Area Work Flow (WAWF) System (reference DFARS 252.232-7003, 'Electronic Submission of Payment Requests and Receiving Reports').

(b) INVOICE INSTRUCTIONS TO CONTRACTOR: Each invoice, at a minimum, shall identify the contract number, CLIN(s), InfoSubCLIN(s), and ACRN(s) against which funds are being billed and shall comply with the requirements of FAR 52.216-7, 'Allowable Cost and Payment'; 52.232-20, 'Limitations of Cost'; 52.232-22, 'Limitation of Funds'; 52.232-25, 'Prompt Payment', as well as other regulatory and legal requirements. The Contractor shall submit the first and last invoices to:

*ACO name

*Address

*Phone number

*E-mail address All subsequent invoices shall be submitted directly to DFAS under direct billing authority, provided that the contract maintains approval for direct billing.

(c) DFAS PAYMENT INSTRUCTIONS: Payment shall be made from ACRN(s) in alphabetical order (AA, AB, etc.). This is known as First-In, First Out (FIFO). Do not use a prorated method to pay or disburse and liquidate funds nor liquidate any funds from an ACRN unless the preceding ACRN(s) have been fully liquidated or unless otherwise directed by an addendum to the voucher, as described in paragraph (d).

(d) The Contractor may provide an addendum, approved by the PCO or ACO, to the voucher to allow the contract to bill in a manner other than FIFO. For example, the Contractor may bill a percentage of the current year funding concurrently with a percentage of previous year funding.

(e) The instructions in paragraphs (b) and (c) shall be inserted on each voucher submitted by the contract.

* To be inserted by the Offeror.

G002. IMPLEMENTATION OF PATENT RIGHTS CLAUSE (FEB 2009)

(a) All documents and information required by the patent rights and/or patent reporting clauses set forth in Section I of this contract shall be submitted to the Administrative Contracting Officer and to:

SMC/JAQ

483 N. Aviation Blvd

El Segundo, CA 90245-2808

Attn: Patent Attorney

Subject: OCX Contract

(b) The SMC/JA patent administrator can be reached at (310) 653-3084.

(c) This notice also constitutes a request (see DFARS 252.227-7039(c), as applicable) for submission of a copy of the patent application, when filed, along with the patent application serial number, filing date, subsequent U.S. patent number and issue date, as received.

G003. GOVERNMENT POINTS OF CONTACT (FEB 2009)

(a) Contracting Officer:

Terry Schooley

GPSW/PK

483 N. Aviation Blvd.

El Segundo, CA 90245-2808

(310) 653-3174

Terry.Schooley@us.af.mil

(b) Contract Specialists:

Sara Lawlyes

(310) 653-3451

Sara.Lawlyes@us.af.mil

Rachel Cavanna

(310) 653-3882

Rachel.Cavanna@us.af.mil

(c) Program Manager:

Lt Col Janet Grondin

GPAS/CC

(310) 653-3265

Janet.Grondin@losangeles.af.mil

G004. REMITTANCE ADDRESS (FEB 2009)

The remittance address is different from the mailing address in Block 7 of the SF26. The correct remittance address is:

* To be inserted by the Offeror if remittance address in Block 8 of SF33 is different from the Offeror's mailing address.

G005. SEGREGATION OF COSTS (FEB 2009)

The Contractor shall segregate all costs associated with each CLIN identified in Section B from the costs associated with the other CLINs of this contract.

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

A. DEFENSE FAR SUPP CONTRACT CLAUSES IN FULL TEXT

252.234-7002 EARNED VALUE MANAGEMENT SYSTEM (APR 2008)

(a) In the performance of this contract, the Contractor shall use—

(1) An Earned Value Management System (EVMS) that complies with the EVMS guidelines in the American National Standards Institute/Electronic Industries Alliance Standard 748, Earned Value Management Systems (ANSI/EIA-748); and

(2) Management procedures that provide for generation of timely, reliable, and verifiable information for the Contract Performance Report (CPR) and the Integrated Master Schedule (IMS) required by the CPR and IMS data items of this contract.

(b) If this contract has a value of $50,000,000 or more, the Contractor shall use an EVMS that has been determined by the Cognizant Federal Agency (CFA) to be in compliance with the EVMS guidelines as stated in paragraph (a)(1) of this clause. If, at the time of award, the Contractor’s EVMS has not been determined by the CFA to be in compliance with the EVMS guidelines as stated in paragraph (a)(1) of this clause, the Contractor shall apply its current system to the contract and shall take necessary actions to meet the milestones in the Contractor’s EVMS plan.

(c) If this contract has a value of less than $50,000,000, the Government will not make a formal determination that the Contractor’s EVMS complies with the EVMS guidelines in ANSI/EIA-748 with respect to the contract. The use of the Contractor’s EVMS for this contract does not imply a Government determination of the Contractor’s compliance with the EVMS guidelines in ANSI/EIA-748 for application to future contracts. The Government will allow the use of a Contractor’s EVMS that has been formally reviewed and determined by the CFA to be in compliance with the EVMS guidelines in ANSI/EIA-748.

(d) The Contractor shall submit notification of any proposed substantive changes to the EVMS procedures and the impact of those changes to the CFA. If this contract has a value of $50,000,000 or more, unless a waiver is granted by the CFA, any EVMS changes proposed by the Contractor require approval of the CFA prior to implementation. The CFA will advise the Contractor of the acceptability of such changes as soon as practicable (generally within 30 calendar days) after receipt of the Contractor’s notice of proposed changes. If the CFA waives the advance approval requirements, the Contractor shall disclose EVMS changes to the CFA at least 14 calendar days prior to the effective date of implementation.

(e) The Government will schedule integrated baseline reviews as early as practicable, and the review process will be conducted not later than 180 calendar days after (1) contract award, (2) the exercise of significant contract options, and (3) the incorporation of major modifications. During such reviews, the Government and the Contractor will jointly assess the Contractor’s baseline to be used for performance measurement to ensure complete coverage of the statement of work, logical scheduling of the work activities, adequate resourcing, and identification of inherent risks.

(f) The Contractor shall provide access to all pertinent records and data requested by the Contracting Officer or duly authorized representative as necessary to permit Government surveillance to ensure that the EVMS complies, and continues to comply, with the performance criteria referenced in paragraph (a) of this clause.

(g) When indicated by contract performance, the Contractor shall submit a request for approval to initiate an over-target baseline or over-target schedule to the Contracting Officer. The request shall include a top-level projection of cost and/or schedule growth, a determination of whether or not performance variances will be retained, and a schedule of implementation for the rebaselining. The Government will acknowledge receipt of the request in a timely manner (generally within 30 calendar days).

(h) The Contractor shall require its subcontractors to comply with EVMS requirements as follows:

(1) For subcontracts valued at $50,000,000 or more, the following subcontractors shall comply with the requirements of this clause: * To be completed by the Offeror

(2) For subcontracts valued at less than $50,000,000, the following subcontractors shall comply with the requirements of this clause, excluding the requirements of paragraph (b) of this clause: * To be completed by the Offeror

B. OTHER CONTRACT CLAUSES IN FULL TEXT

H001. TABLE OF CONTENTS FOR SECTION H (FEB 2009)

The following is a list of the Special Contract Requirements contained in this section:

Clause No.
Title
H001
Table of Contents for Section H
H002
Incorporation of Section K
H003
Incorporation of Subcontracting Plan
H004
Integration
H005
Enabling Clause
H006
Enabling Clause between Prime Contracts and Service Contracts
H007
Modeling and Simulation Tools
H008
Associate Contractor Agreements
H009
Key Personnel Retention
H010
Releasability Under the Freedom of Information Act
H011
Organizational Conflict of Interest
H012
Contractor Identification
H013
Implementation of Disclosure of Information
H014
Reserved
H015
Government Direction
H016
Advance Change Adjustment Agreement
H017
Product Substitution
H018
Contract Problem Identification Reports
H019
Submission of Requests for Equitable Adjustment and Claims
H020
Alternative Disputes Resolution
H021
Government Property
H022
Base Support
H023
Use of Hazardous Materials in the Performance of On-Base Contracts
H024
Accident Reporting and Investigation Involving Spacecraft, Ground Systems, and Mission Support Equipment
H025
Registration with U.S./Canada Joint Certification Program
H026
Export-Controlled Data Restrictions
H027
Definition of Labor Hour
H028
Option to Acquire Capability Insertion Program Tasks (Applicable to 0400 Series Option CLINs)
H029
Option to Acquire Special Studies (Applicable to 1000 Series Option CLINs)
H030
Options to Acquire Interim Contractor Support (ICS) for Block 1.0 (Applicable to Option CLINs 2000, 2100 & 2200)
H031
Options to Acquire Transition Support (Applicable to Option CLINs 2300 & 2400)
H032
Options to Acquire Software Maintenance (Applicable to Option CLINs 2501-2505 and 2601-2605)
H033
Options to Acquire Hardware Maintenance (Applicable to Option CLINs 2701-2705 and 2801-2805)
H034
Options to Acquire Technical Order Support (Applicable to Option CLINs 2901-2905)
H035
Option to Acquire System Modifications (Applicable to 3000 series Option CLINs)

H002. INCORPORATION OF SECTION K (FEB 2009)

The provisions of Section K of Request for Proposal number FA8807-09-R-0003 as completed by the Contractor in its proposal are incorporated herein by reference

H003. INCORPORATION OF SUBCONTRACTING PLAN (FEB 2009)

In accordance with FAR 52.219-9, 'Small Business Subcontracting Plan', the Small Business Subcontracting Plan contained in Attachment 9 of this contract is incorporated herein by reference. The small business goal is *%. The small disadvantaged business goal is *%. The women-owned small business goal is *%.

*To be inserted by Offeror.

H004. INTEGRATION (APR 2009)

This contract constitutes the entire understanding between the parties and supercedes the terms and conditions of all other prior or contemporaneous oral or written agreements between the parties. Failure by either party to enforce any of the provisions of this contract shall not be construed as a waiver by such party of any such provisions, nor shall such failure affect the validity and enforceability of this contract in any way.

H005. ENABLING CLAUSE BETWEEN PRIME CONTRACTS AND SERVICE CONTRACTS (FEB 2009)

(a) The Air Force has entered into contracts with Tecolote, Mitre, SAIC (the GPSW SE&I Team), Quantech, and Software Engineering Institute for services to provide general systems engineering and integration (GSE&I), technical support, technical review, and acquisition management support.

(b) Service tasks involve the application of a broad range of education, skills, knowledge, and experience in many disciplines in support of weapon system acquisition tasks. Tasks may involve:

(1) GSE&I may include overall system definition; integration both within the system and with associated systems; analysis of system segment and subsystem design; analysis of design compromises and tradeoffs; definition of interfaces; review of hardware and software, including manufacturing and quality control; observation, review and evaluation of tests and test data; support of launch, flight test, and orbital operations; appraisal of the Contractors' technical performance through meetings with Contractors and subcontractors; exchange and analysis of information on progress and problems; review of plans for future work; developing solutions to problems; technical alternatives for reduced program risk; providing comments and recommendations in writing to the DoD System

Program Manager and/or Project Officer as an independent technical assessment for consideration for modifying the program or redirecting the Contractor's efforts; all to the extent necessary to assure timely and economical accomplishment of program objectives consistent with mission requirements.

(2) Technical Support (TS) may include broad areas of specialized needs of customers for planning, system architecting, research and development, horizontal engineering, or analytical activities. The categories of TS tasks are: Selected Research, Development, Test and Evaluation;

Plans and System Architecture; Mission Oriented Investigation and Experimentation;

Multi-Program Systems Enhancement; Engineering Methods; International Technology

Assessment; and Acquisition Support.

(3) Technical Review (TR) may include the process of appraising the technical performance of the Contractor through meetings, exchanging information on progress and problems, reviewing reports, evaluating presentations, reviewing hardware and software, witnessing and evaluating tests, analyzing plans for future work, evaluating efforts relative to technical objectives, and providing comments and recommendations in writing to the Air Force Program Manager as an independent technical assessment for consideration for modifying the program or redirecting the contracts' efforts to assure timely and economical accomplishment of program objectives.

(4) Acquisition management support may include review, development, report, and staffing of strategic plans, acquisition plans and strategies, source selection plans, Statements of Work, Statements of Objectives, Contract Data Requirements Lists, requirements and compliance documents, system/subsystem concepts, Requests for Proposal, industry notices, presentations to industry, test plans and procedures, and studies and analyses. Further, acquisition management support includes providing advices and assistance on Independent

Program Assessments, risk assessments, source selections, proposal evaluations, market research, recommendations for streamlining and improving acquisition processes, supporting management of the execution of acquisition programs, review and analysis of prime and subcontractor technical performance, cost and schedule data, analyses for compliance with policy, law, directives, regulations, requirements, standards, and executive orders, advice on space policy, collecting and developing acquisition lessons learned, and providing training and course materials for Government and Contractor personnel.

(c) In the performance of this contract, the Contractor agrees to cooperate with Tecolote, Mitre, SAIC (the GPSW SE&I Team), Quantech, and Software Engineering Institute, by: responding to invitations from authorized personnel to attend meetings; by providing access to technical information and research, development planning data such as, but not limited to, design and development analyses, test data and results, equipment and process specifications, test and test equipment specifications and procedures, parts and quality control procedures, records and data, manufacturing and assembly procedures, and cost, schedule and milestone data - all in their original form or reproduced form; by delivering data as specified in the Contract Data Requirements List; by discussing technical matters relating to this program; by providing access to Contractor facilities utilized in the performance of this contract; and by allowing observation of technical activities by appropriate technical personnel. The personnel engaged in general systems engineering and integration effort are authorized access to any technical information pertaining to this contract.

(d) The Contractor further agrees to include in each subcontract over $1 million or 10 percent of prime contract value, whichever is less, a clause requiring compliance by a subcontractor and succeeding levels of subcontractors with the response and access provisions of paragraph (c) above, subject to coordination with the Contractor.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .