FA8751-18-R-0002

Questions & Answers

05 December 2017 Question (Revised): What is the ceiling height of Building #101? Is a lift required?

Answer: The height to the devices will be approximately 40 feet to the devices throughout Building 101. The Government will not provide the lift.

07 December 2017 Question: The drawings include every building except Building #1480 but it does include a Building 1600 and 1605 which don't seem to be listed anywhere. Is there any information on 1480?

Answer: The drawing for Building # 1480 was inadvertently left out of the solicitation package. The solicitation has been amended to include the drawing. Buildings 1600 and 1605 are scheduled for demolition and will not have proposed systems installed. This decision was made following inception of this requirements document and the drawings were inadvertently included instead of the drawing for 1480.

Question: What is the ceiling height of Building #1? Is a lift required?

Answer: The maximum height of the area in the Colosseum (Building 1) is 30 feet. Fire Alarm and Control conduit is not placed any higher than 20 feet. The majority of devices are wall mounted at approximately 8 feet with a few as high as 15 feet. The Government will not provide a lift.