17b10_site_visit_notes.docx

DOCX document 13 KB Posted

Attached to
Clean Steel Frame and Related Surfaces, Bulding 101 Federal contract opportunity
Solicitation number
FA8751-17-B-0010
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Site Visit Q&A/Notes

View the file

Other files for this federal contract opportunity

Other files attached to Clean Steel Frame and Related Surfaces, Bulding 101, newest first.
File Type Posted
17b10_additional_info_2.docx DOCX document
17b10_additional_info_1.docx DOCX document
FA875117B0010.pdf PDF
17b10_a15_Attach_1_specification_manual.pdf PDF
17b10_a15_Attach_3_wage_determination.pdf PDF
17b10_a15_Attach_2_drawings.pdf PDF
RRS_Form_31,_Request_for_Visit_Authorization_to_RRS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA875117B0010

SITE VIST NOTES

The following are notes from the September 13, 2017 site visit:

Q: Are gas/diesel lifts allowed?

A: Yes, when accessing heights above 45’. Less than 45’ propane or other power source other than gas/diesel must be used.

Q: What advance notice of phase transition is required and can the Contractor submit own phasing plan for approval?

A: One week advance notice is required before moving from one work area phase to the next, and yes the Contractor can submit its own plan for consideration.

Q: What insulation and other materials must be replaced?

A: In addition to those areas marked on the drawings, any insulation removed intentionally or by accident and not marked on drawings must be replaced.

Q: To what extent should lead paint be removed?

A: Scrape flakes and areas that show peeling. No grinding is necessary.

Q: Will staging areas be offered?

A: Coordination will strive to provide the most efficient staging area for the project.

Q: Will another site visit be scheduled?

A: Yes. A second site visit is scheduled for Friday, 22 SEP 2017, 10AM EST.

Reminders:

- After lead paint is scraped, contractor shall follow by using the same cleaning procedure specified for all other areas (hepa vac, wet wipe, etc)

- Protected access walkway must be a minimum of 6 feet wide

- This effort is a total small business set-aside

- The Davis-Bacon Act applies

- Limitations on subcontracting applies

- Follow instructions in the solicitation for submitting reservations for the site visit