Site Visit Q&A/Notes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 17b10_additional_info_2.docx | DOCX document | |
| 17b10_additional_info_1.docx | DOCX document | |
| FA875117B0010.pdf | ||
| 17b10_a15_Attach_1_specification_manual.pdf | ||
| 17b10_a15_Attach_3_wage_determination.pdf | ||
| 17b10_a15_Attach_2_drawings.pdf | ||
| RRS_Form_31,_Request_for_Visit_Authorization_to_RRS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA875117B0010
SITE VIST NOTES
The following are notes from the September 13, 2017 site visit:
Q: Are gas/diesel lifts allowed?
A: Yes, when accessing heights above 45’. Less than 45’ propane or other power source other than gas/diesel must be used.
Q: What advance notice of phase transition is required and can the Contractor submit own phasing plan for approval?
A: One week advance notice is required before moving from one work area phase to the next, and yes the Contractor can submit its own plan for consideration.
Q: What insulation and other materials must be replaced?
A: In addition to those areas marked on the drawings, any insulation removed intentionally or by accident and not marked on drawings must be replaced.
Q: To what extent should lead paint be removed?
A: Scrape flakes and areas that show peeling. No grinding is necessary.
Q: Will staging areas be offered?
A: Coordination will strive to provide the most efficient staging area for the project.
Q: Will another site visit be scheduled?
A: Yes. A second site visit is scheduled for Friday, 22 SEP 2017, 10AM EST.
Reminders:
- After lead paint is scraped, contractor shall follow by using the same cleaning procedure specified for all other areas (hepa vac, wet wipe, etc)
- Protected access walkway must be a minimum of 6 feet wide
- This effort is a total small business set-aside
- The Davis-Bacon Act applies
- Limitations on subcontracting applies
- Follow instructions in the solicitation for submitting reservations for the site visit