17b10_additional_info_2.docx
DOCX document 14 KB Posted
- Attached to
- Clean Steel Frame and Related Surfaces, Bulding 101 Federal contract opportunity
- Solicitation number
- FA8751-17-B-0010
About this file
Final Q&A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 17b10_additional_info_1.docx | DOCX document | |
| 17b10_site_visit_notes.docx | DOCX document | |
| FA875117B0010.pdf | ||
| 17b10_a15_Attach_1_specification_manual.pdf | ||
| 17b10_a15_Attach_3_wage_determination.pdf | ||
| 17b10_a15_Attach_2_drawings.pdf | ||
| RRS_Form_31,_Request_for_Visit_Authorization_to_RRS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA875117B0010
ADDITIONAL INFORMATION #2
The following represents additional information as of 27 SEP 2017:
Q: Are scrubbers necessary on lift exhausts?
A: Contrary to the answer provided in “Additional Information #1”, scrubbers ARE necessary on lift exhausts.
Q: Is cleaning inside paint booths in scope?
A: No, but cleaning above the booths is required.
Q: Cleaning with distilled water is mentioned in the specs. Is this necessary, or can potable/municipal water be used?
A: Distilled water only.
Q: Insulation batts/blankets are falling away from the underside of the arched roof in the high bay? Must these be replaced? What should be done about these?
A: Contractor shall remove and dispose of any insulation that has fallen and prevents or impedes work on this requirement.
Q: Specifications delineate government/contractor clean-up responsibility at 8 feet. Does this line hold true at mezzanine floors, too, or is the 8 feet calculated from earth/ground floor level?
A: The line is 8 feet above earth/finished first floor level.
Q: Some pipes identified as requiring insulation abatement appear to be dead, no longer in use. Specifications require re-insulation after abatement. Would it be possible to omit, waive, or delete re-insulation of dead pipes?
A: Contractor shall re-insulate all pipes that are abated, regardless if they are in service or not.
Q: Since the project is going to be during the peak of our heating season, can steam heat be turned off to abate and reinsulate.
A: B101 steam can be isolated as required. Also, certain sections of the steam system can be isolated depending on the existing valving arrangement.