Cannon question set 1 (FA860423RB006) (003).docx

DOCX document 16 KB Posted

Attached to
MMHS Storage Aid System Cannon AFB Federal contract opportunity
Solicitation number
FA860423RB006
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This document contains a synopsis and solicitation for a Storage Aid System at Cannon Air Force Base in New Mexico. The solicitation seeks proposals for the design, fabrication, installation, and testing of a Storage Aid System in Building 160, to be completed within 270 days of award. The system must incorporate material handling equipment including a ground-level racking system, vertical reciprocating conveyor, and mezzanine. Proposals are due by March 27, 2023 and will be evaluated using the Lowest Price Technically Acceptable source selection method. The contract is set aside for small businesses with less than 500 employees and is subject to limitations on subcontracting more than 50% of the amount paid by the government to non-similarly situated entities. The solicitation and specifications can be found on SAM.gov under solicitation number FA8604-23-R-B006. The Department of the Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to MMHS Storage Aid System Cannon AFB, newest first.
File Type Posted
Cannon question set 4 (FA860423RB006) (002).docx DOCX document
ACKNOWLEDGEMENT OF COMPLIANCE.pdf PDF
Solicitation Amendment FA860423RB0060001 SF 30 amend 1.pdf PDF
Solicitation Amendment FA860423RB0060002 SF 30 Amd 2.pdf PDF
Solicitation Amendment (1) FA860423RB0060002 SF 30.pdf PDF
Cannon question set 3 (FA860423RB006).docx DOCX document
Solicitation Amendment FA860423RB0060002 SF 30.pdf PDF
ZCN102-App A - Mezzanine (REV2).pdf PDF
Cannon question set 2 (FA860423RB006) 2 new questions (002).docx DOCX document
ZCN102-App C- VRC (REV1).pdf PDF
ZCN102-01 (REV 1).pdf PDF
ZCN102-App B - 463L Gravity Roller Conveyor (REV1).pdf PDF
ZCN102-App A - Mezzanine (REV1).pdf PDF
Solicitation - FA860423RB006.pdf PDF
Notification of Compliance with Contract Insurance Requirements .pdf PDF
Drawings .pdf PDF
Appendix D Incline-Decline Conveyor .pdf PDF
Cannon Contractor Information .pdf PDF
Cover PD for Cannon .pdf PDF
Appendix A Mezzanine .pdf PDF
Appendix B 463l Gravity Roller Conveyor.pdf PDF
Checklist Summary Pricing Sheet.pdf PDF
Addendums.pdf PDF
Appendix C Vertical Reciprocating Conveyor (VRC) .pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8604‐23‐R‐B006

Cannon AFB, NM Questions/Answers Set 1 2 March 2023 Questions/Responses:

1. Cover PD

3.2.2.1 States the contractor must run power from the power source to the equipment no more than 200 feet but it does not state where these panels are to be located. This mezzanine appears to be in the middle of a hanger, are the panels to be on the adjacent wall closest to outside or to be on the mezzanine?

-Drawing ZCN102 has been updated to reflect the location of the existing power source.

2. Appendix A – Mezzanine There are safety harness tie offs on the drawing, but no specs listed in the appendix? Are these required, and if so, are harnesses also required?

For the sprinklers, how far away is the tie in point?

-Harnesses are not required to be provided, just tie off points for them to be connected to. Appendix A has been updated to provide specifications for the tie off points. Existing sprinklers are located on the ceiling of the hanger above the proposed location of the mezzanine.

3. Appendix B – 463L GRC Fixed stops are mentioned twice, but no removable stops are not listed in the specs, they are noted on the drawing though but only for the upper level? Are these required, and if so how many, and what dimensions/specifications are required?

- Section 3.2.8 has been updated to provide specifications for removable pallet stops as they will be required. Drawing ZCN102 has been updated to reflect locations of removable pallet stops on lower level.

Tine deflectors are not mentioned in the specs by name, is para 3.2.11 for frame protectors the normal tine deflectors asked for with this GRC? Can you please supply a spec to follow if required?

- Section 3.2.11 which provided these requirements has been reworded to eliminate any confusion.

Normally the specs call for hardwood or steel to be in the GRC frame to protect it from fork tine damage, is it no longer required?

- Section 3.2.11 which provided these requirements has been reworded to eliminate any confusion.

The drawing shows flared guiderail at the beginning and end of the GRC, but the specs do not mention it. Normally only the front needs to be flared as you won’t be able to access the conveyor with a forklift from the back. Is this required?

-Flared sections of guiderail are only required on the forklift interface sides. Drawing ZCN102 has been updated to address this.

4. Appendix C – VRC There is no disconnect mentioned, but they are normally required?

- Appendix C has been updated with requirements for a quick disconnect for the VRC.

5. “Section 3.1.1.3 of Appendix C requests handrails and kickplates on the lift platform. We would not provide anything including handrails. It automatically purposes the equipment for personnel. Can the spec be updated to remove the handrail and kickplate to comply with the standards for non-personnel equipment?”

-While the VRC is only designed for equipment use, personnel will access the platform while loading/unloading the system and thus the handrails and kickplates shall be required.