About this file

This document outlines a federal contract opportunity for a storage aid system and mobility processing system. The solicitation seeks proposals for the design, fabrication, installation, and testing of a storage aid system at Building 262 at Pease Air National Guard Base in New Hampshire as well as a storage and mobility processing system at Building 70 at the Vermont Air National Guard Base in Vermont. Proposals are due by July 28, 2020 and the contract is required to be completed within 238 days of award. The evaluation will be based on lowest price technically acceptable. The opportunity is set aside for small businesses with less than 500 employees and is subject to limitations on subcontracting. Interested offerors must register in SAM and submit proposals through DoD Safe by contacting the points of contact listed in the solicitation no later than five business days before the closing date.

View the file

Other files for this federal contract opportunity

Other files attached to FA8604-20-R-8108 Storage Aid System New Hampshire & Mobility Processing System Vermont, newest first.
File Type Posted
Question and Answer Set 8 and 9.pdf PDF
Question and Answer Set 6 Answered.pdf PDF
Question and Answer Set 7.pdf PDF
Question Set 4 Answered.pdf PDF
Question Set 5 Answered.pdf PDF
FA860420R8108 0001.pdf PDF
Proposal Checklist 8108.pdf PDF
RFP FA860420R8108.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pease / Burlington -Question Set #1, 2 & 3

I have the following questions for Vermont

Cover Pd 3.2.11– Are plastic embossed data plates an acceptable alternative to metal?

YES COVER PD HAS BEEN REVISED.

For the section labeled “cold storage” on the drawing is it refrigerated, or just not heated?

NOT HEATED

Does the mezzanine (not labeled cold storage) have a pallet gate for us to unload the pallet rack on top?

YES

Drawing details for all rack show a width of 27’. Assuming this is supposed to be 108” as the appendix calls out and 27’ is a typo.

CORRECT…DETAIL WAS SCALED BY FACTOR OF THREE; DIMENSION SCALED THREE

TIMES AND IS IN ERROR. AF DRAWING NBR901 IS REVISED TO REFLECT 108”

DIMENSION.

For Pease ANGB

Cover PD 3.3.7 Are plastic embossed data plats an acceptable alternative to metal? Cover PD revised.

App B – 3.2.13 The paragraph states “three existing carousels are labeled B&C”. Is this supposed to say the 3 new VCs will be labeled A & B & C? App B revised.

Question 2

Is there a loading dock (for both locations) and if so, where is it located on the drawing?

Vermont: Yes. The doors that are located on “North” wall of building.

New Hampshire, No, The ground is level with the inside and outside of the building

Question 3

For the modular cabinets in the COVER PD, it does not list how may drawers, or the size of the drawers required, or if the drawers require partitions and dividers. The drawing is eligible at the point you have to zoom in to see the drawers. We need more information to obtain a quote.

Cover PD revised.