Amendment_0004.pdf

PDF 2 MB Posted

Attached to
MMHS Storage Aid System at Kirtland AFB, New Mexico
Solicitation number
FA8604-19-R-8105
Issued by

About this file

FA8604-19-R-8105-0004 with attachments

View the file

Other files

File Type Posted
Question_set_5_for_Kirtland.docx DOCX document
AKR707-01_(REV2).dwg DWG drawing
Question_set_4_for_Kirtland.docx DOCX document
Kirtland_Electric_Photos.pdf PDF
AKR707-03_(REV3).dwg DWG drawing
FA8604-19-R-8105-0003.pdf PDF
Question_set_3_for_Kirtland.docx DOCX document
AKR707-02_(REV2).dwg DWG drawing
AKR707-02_(REV1).dwg DWG drawing
FA8604-19-R-8105-0002.pdf PDF
AKR707-03_(REV2).dwg DWG drawing
Question_set_2_for_Kirtland.docx DOCX document
AKR707-01_(REV1).dwg DWG drawing
Question_set_1_for_Kirtland.docx DOCX document
AKR707-03_(REV1).dwg DWG drawing
Kirtland_Amendment_0001-REV1.pdf PDF
AKR707-03.dwg DWG drawing
Summary_Pricing_Sheet.docx DOCX document
AKR707-01.dwg DWG drawing
AKR707-02.dwg DWG drawing
FInal_RFP.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY AFLCMC/PZIEB CODE FA8604 7. ADMINISTERED BY (If other than Item 6) CODE

USAF/AFMC/AFLCMC

AF LIFE CYCLE MANAGEMENT CENTER

2275 D STREET, BLDG 16, RM 128

WRIGHT-PATTERSON AFB OH 45433-7228

BRENDA M. HICKS 937-656-7389

brenda.hicks@us.af.mil

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

FA860419R8105000

X

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X )

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM

10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor X is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Non ACAT Storage Aid System Kirtland Air Force Base.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 7.1.3.5 FAR (48 CFR) 53.243 Created 15 May 2019 3:55 PM

CONTRACT DOCUMENTS, EXHIBITS AND ATTACHMENTS

FA860419R81050004 PAGE 2 OF 3

1. This amendment hereby incorporates Section J, Cover Purchase Description, Rev 2, dated 15 May 2019, Appendix E, Rev 1, dated 15 May 2019, and Drawings AKR07-01, Rev 2, dated 15 May 2019 as a result of questions received on this requirement.

2. All other terms and conditions remain the same.

SCHEDULE

FA860419R81050004

DOCUMENT PGS DATE TITLE

ATTACHMENT 1 32 15 MAY 2019 COVER PURCHASE DESCRIPTION FOR

STORAGE AID SYSTEM, REV 2

ATTACHMENT 6 13 15 MAY 2019 APPENDIX E, MODULAR CABINETS, REV 1

ATTACHMENT 7 1 15 MAY 2019 DRAWING AKR707-01, REV 2

COVER PURCHASE DESCRIPTION

FOR

STORAGE AID SYSTEM

AT

KIRTLAND AIR FORCE BASE, NEW MEXICO

BUILDING 979, HANGARS 1000 and 1002

CSN: AKR707

DATE: 10 January 2019 REVISION 1: 10 April 2019 REVISION 2: 15 May 2019

PREPARED BY:

James F. Rowland James F. Rowland

PROJECT ENGINEER

AFLCMC/EZPAE

Brad Thompson Brad Thompson

REVIEWER

AFLCMC/EZPAE

FA8604-19-R-8105 Attachment 1, Rev 2 Page 1 of 32

THIS PAGE LEFT BLANK INTENTIONALLY

FA8604-19-R-8105 Attachment 1, Rev 2 Page 2 of 32

Table of Contents

1. SCOPE

1.1. GENERAL SCOPE

1.2. DEFINITIONS

2. APPLICABLE DOCUMENTS

2.1. GOVERNMENT DOCUMENTS

2.2. NON-GOVERNMENT DOCUMENTS

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

3.1.1. MEZZANINE

3.1.2. ROBO/AUTO CRIBS

3.1.3. WIDE-SPAN SHELVING

3.1.4. MOBILE AISLE

3.1.5. MODULAR CABINETS

3.1.6. WORKSTATIONS (REV1) (REV2)

3.1.7. HAZMAT CABINETS

3.1.8. CABINETS (REV1)

3.1.9. SECURITY FENCING

3.1.10. REMOVAL AND DISPOSAL OF EXISTING EQUIPMENT

3.2. CHARACTERISTICS

3.2.1. NOISE LEVELS

3.2.2. ELECTRICAL CHARACTERISTICS

3.2.2.1. POWER SOURCE

3.2.2.1.1. POWER DISTRIBUTION PANELS

3.2.2.2. INSTALLATION CODE

3.2.2.3. CONDUIT

3.2.2.4. GROUNDING

3.2.2.5. WIRING

3.2.2.6. OVERCURRENT PROTECTION

3.2.2.7. ENVIRONMENTAL PROTECTION

3.2.2.8. PROTECTION FROM MECHANICAL DAMAGE

3.3. DESIGN AND FABRICATION

3.3.1. DESIGN CRITERIA

3.3.1.1. RELIABILITY/AVAILABILITY

3.3.1.2. MAINTAINABILITY

3.3.1.3. ENVIRONMENTAL CONDITIONS

3.3.1.4. SITE ACCESS (REV1)

3.3.1.5. STANDARD, COMMERCIAL COMPONENTS

3.3.1.6. STANDARDIZATION

3.3.1.7. SPECIAL TOOLS

3.3.1.8. ACCESSIBILITY

3.3.1.9. STRUCTURAL REQUIREMENTS

3.3.1.10. VERIFICATION OF DIMENSIONS

3.3.1.11. OZONE DEPLETING SUBSTANCES (ODS)

3.3.1.12. SAFETY

FA8604-19-R-8105 Attachment 1, Rev 2 Page 3 of 32

3.3.1.12.1. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

3.3.1.12.2. PROTECTION AGAINST MOVING PARTS

3.3.1.12.3. PLACARDS

3.3.1.12.4. FAIL-SAFE CONTROLS

3.3.1.12.5. CLEAN-UP

3.3.1.12.6. RACK CAPACITY LEVELS

3.3.1.13. HUMAN ENGINEERING

3.3.2. MATERIALS

3.3.2.1. STEEL

3.3.2.2. MECHANICAL FASTENING DEVICES

3.3.2.3. ANCHORS

3.3.3. PROTECTIVE COATINGS

3.3.3.1. PAINTING

3.3.3.2. PLATING

3.3.3.3. GALVANIZING

3.3.3.4. DISSIMILAR METALS

3.3.4. WELDING

3.3.4.1. WELDING PROCEDURE QUALIFICATION

3.3.4.2. WELDER PERFORMANCE QUALIFICATION

3.3.4.3. FIRE PROTECTION

3.3.5. CUTTING

3.3.6. COORDINATION

3.3.7. NAMEPLATES

3.3.8. PRECEDENCE

3.4. DOCUMENTATION

3.4.1. MANAGEMENT REPORTS

3.4.2. SHOP DRAWINGS

3.4.3. EQUIPMENT MANUALS

3.4.4. CERTIFICATIONS

3.4.5. AS-BUILT DRAWINGS

3.5. ORIENTATION

3.5.1. SYSTEM OPERATOR ORIENTATION

3.5.1.1. SYSTEM OPERATOR CLASSROOM INSTRUCTIONS

3.5.1.2. SYSTEM OPERATOR HANDS-ON INSTRUCTIONS

3.5.2. MAINTENANCE ORIENTATION

3.5.2.1. MAINTENANCE CLASSROOM INSTRUCTION

3.5.2.2. MAINTENANCE HANDS-ON INSTRUCTION

4. QUALITY ASSURANCE PROVISIONS

4.1. GENERAL

4.2. ACCEPTANCE TESTS

4.2.1. SYSTEM CHECKOUT TEST

4.2.2. QUALITY CONFORMANCE TEST

4.2.3. RELIABILITY DEMONSTRATION TEST

4.3. INSPECTIONS, TESTS, AND CERTIFICATIONS

4.3.1. INSPECTIONS

4.3.2. TESTS

FA8604-19-R-8105 Attachment 1, Rev 2 Page 4 of 32

4.3.3. CERTIFICATIONS

FA8604-19-R-8105 Attachment 1, Rev 2 Page 5 of 32

Kirtland AFB, Cover PD - Page 1

1. SCOPE

1.1. GENERAL SCOPE

This purchase description (PD) establishes the minimum performance, design, fabrication, installation, orientation, and test requirements for a Storage Aid System for the 58th Special Operations Wing (SOW) in Buildings 979 and Hangar 1000 and 1002 at Kirtland Air Force Base, New Mexico. The work shall be completed in accordance with this PD and Air Force (AF) Drawings AKR707-01 through -03. This PD covers all equipment, materials, and labor necessary to complete installation of the system. It also includes performing tests and making adjustments to the system as well as providing classroom and on-the-job instructions to Government personnel.

1.2. DEFINITIONS

PD - Purchase Description AF - Air Force AFB - Air Force Base COTR - Contracting Officer's Technical Representative

2. APPLICABLE DOCUMENTS

The following documents form a part of this PD to the extent specified herein. The issue in effect on the date the solicitation is issued shall apply.

2.1. GOVERNMENT DOCUMENTS

AIR FORCE INSTRUCTION (AFI)

AFI 48-127

Occupational Noise and Hearing Conservation Program

F

Air Force Consolidated Occupational Safety Instruction.

FA8604-19-R-8105 Attachment 1, Rev 2 Page 6 of 32

Kirtland AFB, Cover PD - Page 2

AIR FORCE DRAWINGS

AKR707-01 Kirtland AFB, New Mexico

Building 979 Layout 21 March 2018

AKR707-02 Kirtland AFB, New Mexico Hangar 1000 Layout

AKR707-03 Kirtland AFB, New Mexico Hangar 1002 Layout

2.2. NON-GOVERNMENT DOCUMENTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 360-05 Manual of Steel Construction -

Allowable Stress Design, Ninth Edition

(Applications for copies shall be addressed to the American Institute of Steel Construction, Inc, 1 East Wacker Drive, Chicago IL 60601)

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI B15.1-00 Safety Standard for Mechanical Power

Transmission Apparatus

ANSI Z49.1-99 Safety in Welding and Cutting

National Standards Institute, 1430 Broadway, New York, NY 10018)

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

29 CFR 1910 Occupational Safety and Health

Standards, (General Industry)

29 CFR 1926 Safety and Health Regulations for Construction

US ARMY CORPS OF ENGINEERS INSTRUCTION

TI 809-04 Seismic Design for Buildings

FA8604-19-R-8105 Attachment 1, Rev 2 Page 7 of 32

Kirtland AFB, Cover PD - Page 3

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM A123/

A123M-02

Standard Specification for Zinc (Hot Dip Galvanized) Coatings on Iron and Steel Products

ASTM A153/

A153M-03

ASTM A307-03

Standard Specification for Zinc Coating(Hot-Dip) on Iron and Steel Hardware

Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

ASTM A325-04 Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength

ASTM B633-98 Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel

Society for Testing and Materials, 1916 Race Street, Philadelphia PA 19103)

AMERICAN WELDING SOCIETY (AWS)

AWS B2.1-00 Welding Procedure and Performance

Qualification

AWS D1.1-04 Structural Welding Code – Steel

AWS D14.1-97 Welding of Industrial and Mill Cranes and Other Material Handling Equipment, Spec for

Welding Society, Inc, 550 NW Lejeune Road, P.O.Box 35140, Miami

FL 33135)

NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA)

NEMA ICS 6-01 Enclosures for Industrial Controls and

Systems

FA8604-19-R-8105 Attachment 1, Rev 2 Page 8 of 32

Kirtland AFB, Cover PD - Page 4

(Applications for copies shall be addressed to the National Electrical Manufacturers Association, 2101 L Street, NW, Washington DC 20037)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 51B-14 Standard for Fire Prevention During

Welding, Cutting and Other Hotwork

NFPA 70-14 National Electrical Code

NFPA 13-13 Installation of Sprinkler Systems

(Applications for copies shall be addressed to the National Fire Protection Association, One Batterymarch Park, P.O. Box 9101, Quincy MA 02269-9101)

SOCIETY OF AUTOMOTIVE ENGINEERS, INC (SAE)

SAE J429-99 Mechanical and Material Requirements for Externally Threaded Fasteners, Standard

(Applications for copies shall be addressed to the Society of Automotive Engineers, Inc, 400 Commonwealth Drive, Warrendale PA 15906)

INTERNATIONAL BUILDING CODE (IBC)

IBC 2012 International Building Code (IBC) developed by the International Code Council (ICC)

(Applications for copies can be obtained at http://www.iccsafe.org/Pages/default.aspx

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

The following major components shall be integrated to form the complete Materials Handling System:

FA8604-19-R-8105 Attachment 1, Rev 2 Page 9 of 32 http://www.iccsafe.org/Pages/default.aspx

Kirtland AFB, Cover PD - Page 5

3.1.1. MEZZANINE

The mezzanine shall be installed as specified in Appendix A and this Cover PD.

3.1.2. ROBO/AUTO CRIBS

The Robo/Auto Cribs shall be installed as specified in Appendix B and this Cover PD.

3.1.3. WIDE-SPAN SHELVING

The wide-span shelving shall be installed as specified in Appendix C and this Cover PD.

3.1.4. MOBILE AISLE

The mobile aisle shall be installed as specified in Appendix D and this Cover PD.

3.1.5. MODULAR CABINETS

The modular cabinets shall be installed as specified in Appendix E and this Cover PD.

3.1.6. WORKSTATIONS (REV1) (REV2)

The contractor shall provide a total of five work stations as shown on AF Drawings AKR707-01, -02, and -03; one in Building 979, one in Hangar 1000, and three in Hangar 1002. All workstations shall be a nominal 30-inches deep with a table top height of 41-inches. The workstation in Building 979 shall be 108” 96” wide and consist of one modular cabinet; the workstation in Hangar 1000 shall be 120” wide and consist of two modular cabinets; two of the workstations in Hangar 1002 shall be 120” wide and consist of two modular cabinets and one of the workstations in Hangar 1002 shall be 84” wide and consist of one modular cabinet. All workstation modular cabinets shall be a nominal 37”H x 30”W x 27-3/4”D with 5 drawers and shall have layout kits to provide a minimum of nine interior compartments.

There shall be (1) 2-1/4” usable height drawer, (1) 3-7/8” usable height drawer, (1) 5-3/8” usable height drawer, (1) 7” usable height drawer, and (1) 8-1/2” usable height drawer per cabinet. The modular cabinets, along with a foot rest shall complete the work stations. Each workstation assembly shall have a nominal 1-3/4” thick countertop and shall have hardwood countertops. The countertop in Building 979 shall also have a

FA8604-19-R-8105 Attachment 1, Rev 2 Page 10 of 32

Kirtland AFB, Cover PD - Page 6

36” wide hinged section cabable of being lifted and fastened to the adjoining modular cabinet as shown in AKR707-01. In lieu of a foot rest, the workstation in Building 979 shall consist of two sets of legs upon which the hinged countertop is mounted as shown in AF Drawing AKR707-01. The clasp/fastener shall be capable of preventing the countertop from being lowered while engaged.

3.1.7. HAZMAT CABINETS

The contractor shall provide a total of seven hazardous materials storage cabinets; three being located in Building 979 as shown on AKR707-01 and four in Hangar 1002 as shown in AKR707-03. Five cabinets shall be 70”H x 43”W x 34”D with two shelves, and two cabinets shall be 70”H x 36”W x 18”D with four shelves.

3.1.8. CABINETS (REV1)

The contractor shall provide a total of four cabinets in Hangar 1002 as shown on AKR707-03. Each cabinet shall be 72”H x 36”W x 18”D with 5 shelves, with each shelf capable of supporting 200 pounds. Closable/lockable doors shall be provided for each cabinet. Each cabinet shall have a built in cabinet lock or able to interface with a contractor provided padlock. A minimum of two keys shall be provided per lock.

3.1.9. SECURITY FENCING

The contractor shall provide security fencing under each mezzanine as shown on AF Drawings AKR707-02 and -03. Each fence shall be equipped in such a way as to form the various storage/working areas designated. Sliding and swinging gates shall be provided as shown to allow access to the fenced areas.

Each gate shall have a padlock lug to enable the gate to be locked. Two keys and a lock shall be provided for each gate.

The fencing shall be constructed of a maximum 2-inch x 2-inch x 10-gauge wire mesh and shall run from the ground to the bottom of each mezzanine to fully enclose each area, forming a secured area/cage.

3.1.10. REMOVAL AND DISPOSAL OF EXISTING EQUIPMENT

Existing equipment shall be removed from building 979 as detailed below. Hangars 1000 and 1002 shall have no existing equipment to remove. The Government will have each area empty of assets prior to removal. Anchor bolts from the existing

FA8604-19-R-8105 Attachment 1, Rev 2 Page 11 of 32

Kirtland AFB, Cover PD - Page 7 equipment shall be removed and ground to floor level. Grout shall be used to fill in old anchor bolt holes if necessary. The Contractor shall transport and dispose of all equipment and materials that are removed at an on base scrap/recycling facility, if available. If an on-base facility is not available, items shall be palletized and disposed of off-base by the Contractor.

BUILDING 979:

5 Modular Cabinets and 1 Workstation

8 Bays Pallet Rack

3.2. CHARACTERISTICS

FA8604-19-R-8105 Attachment 1, Rev 2 Page 12 of 32

Kirtland AFB, Cover PD - Page 8

3.2.1. NOISE LEVELS

The Contractor shall consider noise levels in the design of the equipment. Hazardous noise shall not exceed 85 decibels A-weighted sound pressure level (dB(A)) for 8 hours in any 24-hour period or equivalent in accordance with AFI 48-127. Noise level measurements will be taken at a three-foot distance from the equipment producing the noise and at a level of five feet above the ground/floor in all locations in which personnel may be present during normal operations. If noise levels of installed equipment exceed this requirement, then noise shall be reduced through engineering controls; i.e., insulation, dampening, and isolation.

3.2.2. ELECTRICAL CHARACTERISTICS

3.2.2.1. POWER SOURCE

The Contractor shall run electrical power from the electrical supplies located on AF Drawings AKR707-01 through -03. The Contractor shall furnish and install all necessary wiring and equipment for power distribution to the system and for control of the system.

3.2.2.1.1. POWER DISTRIBUTION PANELS

Power distribution panels (panelboards) with circuit breakers shall be furnished and installed by the Contractor. Panelboards shall not exceed 78 inches in height and shall be mounted so that the height of the top operating handle shall not exceed 60 inches from the floor. Each panelboard door shall be provided with a lock and keyed alike. The Contractor shall supply two keys per lock set. Directories shall be typed to indicate load served by each circuit and shall be mounted in a holder behind a translucent protective covering on the inside of the panel door.

The function of the panel shall be clearly labeled on the outside of the panel. All panelboards shall be in compliance with Article 384, NFPA 70.

3.2.2.2. INSTALLATION CODE

The installation shall, at a minimum, conform to applicable rules of NFPA 70 (National Electrical Code).

3.2.2.3. CONDUIT

All wiring shall be encased in rigid metal conduit conforming to Article 346 of NFPA 70; electrical metallic tubing conforming to

FA8604-19-R-8105 Attachment 1, Rev 2 Page 13 of 32

Kirtland AFB, Cover PD - Page 9

Article 348 of NFPA 70; or flexible metallic tubing conforming to Article 349 of NFPA 70. If conduit/cables are dropped from overhead, they shall be enclosed in a power pole. No conduit/cable shall run on top of the floor/ground. Exposed conduit shall be installed parallel or perpendicular to walls, structural members, or intersections of vertical planes and ceilings. Exposed conduit and fasteners shall match the color of the walls and/or existing conduit color. Changes in direction of conduit shall be made with symmetrical bends or cast metal fittings. Field made bends shall be made with the proper hickey or conduit-bending machine. Crushed or deformed conduit shall not be accepted. Conduit shall be rigidly fastened in place at intervals of not more than 10 feet.

3.2.2.4. GROUNDING

Each component of the system shall be properly grounded to ensure safe working conditions. This shall include adequate ground against static charges that may be generated. Grounding shall conform to Article 250 of NFPA 70.

3.2.2.5. WIRING

Conductors shall be copper. Wire connectors of insulating material or solderless pressure connectors properly taped shall be utilized for all splices where possible. Soldered mechanical joints shall not be accepted. All wiring shall be color-coded, uniquely tagged, or uniquely numbered for identification.

Marking shall be applied in such a manner so as to facilitate tracing of wires (circuits) during repairs and/or maintenance.

Wiring and wiring installation shall conform to Article 300 of

NFPA 70.

3.2.2.6. OVERCURRENT PROTECTION

The power distribution panel shall be equipped with circuit breakers and fuses in compliance with Article 240 of NFPA 70.

Motors shall be equipped with disconnect switches and thermal overload devices.

3.2.2.7. ENVIRONMENTAL PROTECTION

All indoor enclosures and controls shall be in accordance with NEMA ICS 6, Type 12. All outdoor enclosures and controls shall be in accordance with NEMA ICS 6, Type 3S.

3.2.2.8. PROTECTION FROM MECHANICAL DAMAGE

FA8604-19-R-8105 Attachment 1, Rev 2 Page 14 of 32

Kirtland AFB, Cover PD - Page 10

No pushbuttons, control panel, conduit, shielded cable, wire, or electrical device shall be installed so as to expose it to mechanical damage during normal use. If an electrical device, which includes photoeyes, is exposed to damage by material or personnel, then it shall be guarded.

3.3. DESIGN AND FABRICATION

3.3.1. DESIGN CRITERIA

3.3.1.1. RELIABILITY/AVAILABILITY

Each component of the system shall demonstrate a mean time between failure (MTBF) and availability greater than or equal to that listed in the following table. A failure is defined as any interruption that causes corrective maintenance to be made to the system. The operating time will be based on the hours listed on the following table or the actual hours read from the hour meter. The following formulas will be used to calculate MTBF and availability.

MTBF =

Operating Time Total Failures

Mean Time to Repair (MTTR) = Total Repair Time Total Failures

Availability =

MTBF

(MTBF + MTTR)

Reliability/Availability Table

Equipment Operating Time (Hours)

MTBF

(Hours)

Availability

Conveyors 720 360 99

3.3.1.2. MAINTAINABILITY

The system shall be designed, fabricated, and installed to facilitate maintainability and ensure a minimum service life of 15 years. The design shall provide for modular assembly of components and subassemblies where feasible to permit repair or replacement of parts in a minimum of time. This shall include plug-in electrical connections for major electrical subassemblies.

FA8604-19-R-8105 Attachment 1, Rev 2 Page 15 of 32

Kirtland AFB, Cover PD - Page 11

3.3.1.3. ENVIRONMENTAL CONDITIONS

The system shall operate in a temperature range of 5 to 110 degrees Fahrenheit with up to 95 percent relative humidity. The system shall be constructed to operate in an open warehouse environment.

3.3.1.4. SITE ACCESS (REV1)

All three buildings as part of this contract are located on an active flight line and shall require special access for deliveries and work personnel. Delivery drivers could expect delays of up to two hours when being escorted into these areas.

3.3.1.5. STANDARD, COMMERCIAL COMPONENTS

Standard, commercial components which have been for sale and available for purchase to the general public or government agencies for at least one year shall be used to the maximum extent possible. If requested by the COTR (Contracting Officer's Technical Representative), the Contractor shall furnish evidence that equipment of approximately the same design as that proposed to be installed has been tested and successfully operated. Where two or more units of the same type of equipment are required, these units shall be products of the same manufacturer. All equipment and materials shall be new.

3.3.1.6. STANDARDIZATION

Mechanical and electrical interchangeability shall exist between like assemblies, subassemblies, and replaceable parts regardless of the manufacturer's supplier. Interchangeability does not necessarily mean complete identity, but requires that a substitution of such like-assemblies and replacement parts be easily effected without physical or electrical modifications, including cabling, wiring, and mounting.

3.3.1.7. SPECIAL TOOLS

Use of special tools shall be minimized and, where required for operational adjustments, shall be securely mounted within the equipment in a readily accessible location. Standard tools, fittings, lubricants, and fluids shall be used to the maximum practicable extent.

3.3.1.8. ACCESSIBILITY

FA8604-19-R-8105 Attachment 1, Rev 2 Page 16 of 32

Kirtland AFB, Cover PD - Page 12

Structural members shall not prevent access to or removal of components for repair or replacement. Equipment shall be designed for rapid and easy removal as well as replacement or repair of malfunctioning units, by one individual where feasible. Mechanical components shall be designed to permit lubrication of components without disassembly.

3.3.1.9. STRUCTURAL REQUIREMENTS

The system shall be designed and constructed in accordance with design codes at Kirtland AFB, NM. The system shall also be designed to withstand seismic forces as specified in TI 809-04.

3.3.1.10. VERIFICATION OF DIMENSIONS

The contractor shall become familiar with all details of the work, verify all dimensions in the field, and shall advise the Contracting Officer of any discrepancy before performing the work.

3.3.1.11. OZONE DEPLETING SUBSTANCES (ODS)

The Contractor shall not use or prescribe to the greatest extent possible any ODS in the installation and maintenance of the system. ODS includes, but is not limited to aerosol cans, certain cleaning solvents, and certain lubricants. If there is a question pertaining to the applicability of a substance, submit the name of the substance to the Contracting Officer for verification.

3.3.1.12. SAFETY

The Contractor shall consider the safety of personnel and equipment when designing and installing the system. Safety provisions shall be incorporated to the maximum extent possible.

When possible, hazards shall be eliminated through design. When this is not possible, safety devices such as guards, interlocks, and barriers shall be installed. If this does not eliminate the hazard, warning devices such as warning signs, indicator lights, and audio devices shall be installed. Safety requirements shall include, but are not limited to, the following.

3.3.1.12.1. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

The system installation practices and completed system shall meet all applicable requirements of OSHA 29 CFR 1910 and OSHA 29

CFR 1926.

FA8604-19-R-8105 Attachment 1, Rev 2 Page 17 of 32

Kirtland AFB, Cover PD - Page 13

3.3.1.12.2. PROTECTION AGAINST MOVING PARTS

Moving parts shall be provided with guards to protect personnel from possible injury. Guards shall be in accordance with ANSI B15.1.

3.3.1.12.3. PLACARDS

Conspicuous placards shall be mounted adjacent to areas where hazards may exist (i.e., high voltage, pinch points, and tripping hazards). Placards shall also be used to identify operating limits (i.e., capacity, speed, and incline) in a conspicuous location for operators' use.

3.3.1.12.4. FAIL-SAFE CONTROLS

No controls shall cause false operation or endanger personnel if a part should fail. No damage or destruction of any component shall result from reduced voltage or complete loss of power.

3.3.1.12.5. CLEAN-UP

The Contractor shall, at all times, keep the work area, including storage areas, free from the accumulation of waste materials and dust which would cause a hazard or nuisance to others. The approved methods of stabilization for dust control are sprinkling, chemical treatment (non-ODS) or a similar method approved by the COTR. If there is a cutting process, the solution shall be vacuumed up during the process to prevent dust pollution and water damage. Before leaving the site, the Contractor shall remove all rubbish, tools, equipment, and materials that are not the property of the Government. At the completion of the installation/test, the Contractor shall leave the site in a clean, neat and orderly condition satisfactory to the COTR. Waste will be removed daily from the site and shall not be allowed to accumulate to the extent that it becomes a safety or fire hazard. It shall be the Contractor's responsibility to dispose of waste in accordance with all applicable Federal, State, County and Municipal codes.

3.3.1.12.6. RACK CAPACITY LEVELS

All racking (including wide-span etc.) shall have labels applied to all shelves/arms detailing their weight capacities. The labels shall be approximately 2" x 4". Inscribed metal plates or paper stickers containing this information shall be acceptable.

FA8604-19-R-8105 Attachment 1, Rev 2 Page 18 of 32

Kirtland AFB, Cover PD - Page 14

3.3.1.13. HUMAN ENGINEERING

The system design and layout shall incorporate ergonomic design criteria so the optimal interface between operator and equipment is attained.

3.3.2. MATERIALS

3.3.2.1. STEEL

The structural steel components shall meet all design property requirements of AISC 360-05.

3.3.2.2. MECHANICAL FASTENING DEVICES

Unless otherwise specified, all threaded connectors of diameter greater than 7/16 inch shall be either A325 bolts conforming to ASTM A325 or SAE Grade 5 bolts conforming to SAE J429. All structural joints shall be in accordance with AISC 360-05. Bolt hole diameters shall not exceed nominal bolt diameters by more than 1/16 inch. All bolt holes shall be free of burrs, pins, or slivers. Bolts shall extend a minimum of two threads beyond the nuts. All nuts, bolts, and other threaded fasteners shall be plated or galvanized to prevent corrosion. All threaded fasteners shall utilize plated flat and lock washers as required.

3.3.2.3. ANCHORS

Anchors shall, at a minimum, meet the requirements of ASTM A307.

Anchors shall be either the drop-in expansion type or wedge type. All anchors shall be sufficient in size to withstand the calculated pullout and shear forces experienced by the equipment. Minimum anchor sizes shall be 3/8 inch in diameter or, if applicable, as specified in the appendices. Anchor lengths shall be long enough to assure that the manufacturer's minimum embedment in concrete is maintained and shall be installed properly to maintain the required minimum concrete embedment. Anchors shall be spaced so that the manufacturer's recommended minimum allowable spacing between anchors is maintained and the recommended minimum allowable edge distance is maintained. All anchors shall be torqued to the manufacturer's recommended installation torque. When required, adhesive anchors may be used; subject to approval by the COTR.

3.3.3. PROTECTIVE COATINGS

FA8604-19-R-8105 Attachment 1, Rev 2 Page 19 of 32

Kirtland AFB, Cover PD - Page 15

All system component surfaces shall be protected from corrosion by painting, plating, or galvanizing.

3.3.3.1. PAINTING

Metal surfaces, which are not galvanized or plated, shall be cleaned, treated, and painted to protect against rust, corrosion, and deterioration. The first coat of paint or primer shall be applied to a dry clean surface as soon as practicable after cleaning and treating the metal. The primer shall not interfere with the application and adhesion of subsequent coats.

Paint shall last the service life of the equipment. Paint shall be lead and chromate free and meet air pollution requirements for solvent emissions. When several standard colors are available, a color selection chart shall be submitted to the COTR with the shop drawings for selection. The finish coat shall be a smooth, even surface, free from runs, sags, and defects when dry. Welded surfaces shall be cleaned and painted after the welding process is complete. Prepainted accessories, as well as surfaces not requiring paint, shall be protected from overspray.

3.3.3.2. PLATING

All surfaces to be plated shall be thoroughly cleaned to provide a surface free of mill scale, oil, grease, dirt, rust, and any other foreign material prior to being plated. Plating at a minimum shall comply with ASTM B633, Service Condition 1, Type I unless otherwise specified.

3.3.3.3. GALVANIZING

All metal surfaces to be galvanized shall be thoroughly cleaned to provide smooth surfaces and shall comply with ASTM A153 and

ASTM A123.

3.3.3.4. DISSIMILAR METALS

Materials used and their locations shall not promote galvanic corrosion. No combination of materials shall be used that form an electrolytic couple of such nature that corrosion is accelerated.

3.3.4. WELDING

Dimensional tolerances for welded construction, details of welds, and quality of welds shall be in accordance with the applicable requirements of AWS B2.1, AWS D1.1, and AWS D14.1.

FA8604-19-R-8105 Attachment 1, Rev 2 Page 20 of 32

Kirtland AFB, Cover PD - Page 16

The Government reserves the right to perform supplemental nondestructive and destructive tests to determine compliance.

Safety precautions during welding shall conform to ANSI Z49.1.

3.3.4.1. WELDING PROCEDURE QUALIFICATION

Qualification of welding procedures shall conform to the applicable requirements of AWS B2.1, AWS D1.1, and AWS D14.1.

The Government reserves the right to request copies of Welding Procedure Specifications for any welding procedure followed in the fabrication of this system.

3.3.4.2. WELDER PERFORMANCE QUALIFICATION

Each welder, welding operator, and tack welder assigned to work on this system shall be qualified in accordance with the applicable requirements of AWS B2.1, AWS D1.1, and AWS D14.1.

The Government reserves the right to request certification (Performance Qualification Test Record) that each welder, welding operator, or tack welder is qualified as specified.

3.3.4.3. FIRE PROTECTION

All welding, cutting, brazing, and burning operations shall be accomplished in strict compliance with the requirements outlined in AFI 91-203 and NFPA Standard 51B. Prior to starting any welding, cutting, brazing, or burning operations, the Contractor shall obtain a permit (USAF Welding, Cutting, and Brazing AF Form 592). This permit can be obtained by contacting the Kirtland Fire Department at least 24 hours in advance. A copy of each permit will be retained at the work site until the work has been completed. Operations that produce flying, dropping slag, metal or embers shall have sufficient non-combustible materials and fire blankets on site to protect against fire damage or personal injury. In addition, the contractor shall provide a minimum of 2 portable fire extinguishers at the work site until the work has been completed. Extinguishers shall meet a rating of 4A-40BC and the requirements outlined in AFOSH 91-501, Chapter 6. At the close of their operation, the contractor shall make a thorough inspection of each building in which he/she has performed work. This inspection shall ensure that all necessary safeguards relative to potential fire hazards are in effect and operational. The contractor shall familiarize themselves and their personnel on the location of all telephones needed for fire reporting. The contractor shall maintain good housekeeping practices to reduce the risk of fire, damage, and/or personal injury. All scrap materials, rubbish, and refuse shall be removed daily from in and around the building

FA8604-19-R-8105 Attachment 1, Rev 2 Page 21 of 32

Kirtland AFB, Cover PD - Page 17 and shall not be permitted to be strewn on adjacent property.

Flammable and combustible materials used inside the building shall be kept to a minimum and removed from the building during unused periods. Storage of flammable/combustible materials shall not be permitted inside the building.

3.3.5. CUTTING

All edges produced by oxygen-flame cutting or any cutting operation shall be finished by grinding (or other method approved by the COTR) to a surface finish equivalent to that of adjacent surfaces. Sharp edges shall not be acceptable.

3.3.6. COORDINATION

The Contractor shall obtain approval from the local base civil engineering, fire, safety, and bioenvironmental offices before making any modifications to the existing structure to accommodate the new system. The modifications shall match existing work and shall be of comparable quality. The COTR shall also approve all modifications before they are made.

3.3.7. NAMEPLATES

The Contractor shall provide and install one corrosion resistant metal nameplate for each component. A nameplate for each row of shelving/rack shall be provided such that if one row is dismantled, the nameplates will exist elsewhere. For conveyors, a nameplate shall be provided for each kind of conveyor in the system (i.e. takeaway, gravity, curves, incline/decline, etc).

Nameplates shall be located in a visible and safe location.

Nameplates shall last the life of the equipment and shall be capable of withstanding local environmental conditions.

Nameplates shall be stamped, engraved, or etched in a print type not less than 1/8-inch tall. No nameplate or product marking shall be installed until all touch-up painting has been completed. The nameplate or product marking shall clearly display the following headings and corresponding information.

Type of equipment Name of manufacturer Model Number Contract Number Serial Number Capacity Weight Manufacture Date, Month/Year "Property of US Government"

FA8604-19-R-8105 Attachment 1, Rev 2 Page 22 of 32

Kirtland AFB, Cover PD - Page 18

The following information shall be listed on the nameplate for each vehicle/truck:

Type of equipment Name of manufacturer Model Number Contract Number Serial Number Capacity - pounds at 24 inch load centers Service Weight - pounds (with battery) Weight of Battery - pounds Manufacture Date, Month/Year "Property of US Government"

3.3.8. PRECEDENCE

Where local codes and standards conflict with the contents of this PD, the more stringent requirement shall prevail.

3.4. DOCUMENTATION

The Contractor shall provide documentation (data) as described below and in accordance with Table 1 below. Where possible, the Contractor shall print on recycled paper. Also, the Contractor shall not require the use of any Class I ozone depleting substance in any submittal.

3.4.1. MANAGEMENT REPORTS

The Contractor shall provide a monthly status report complete with schedule. The report shall be either Microsoft word document or a PDF file. The monthly status report shall be submitted in accordance with Table 1. Contractor format is acceptable as long as it provides the following information as a minimum;

A) A front cover sheet which includes the title of report, the contractor’s name and address, the base name, the contract number, and the date.

B) A schedule showing progress against schedule to date of report submission and future schedule to contract completion. Schedule as a minimum shall provide the following milestones; submission of data items, if applicable the post award conference, fabrication, shipping, installation, and testing.

C) The body of the report shall provide a summary of the progress to date. It shall identify any problem areas, any changes in schedule or contract equipment, any

FA8604-19-R-8105 Attachment 1, Rev 2 Page 23 of 32

Kirtland AFB, Cover PD - Page 19 engineering change proposals, all significant trips, emails, or telephone calls affecting the performance or scope of the contract.

3.4.2. SHOP DRAWINGS

The Contractor shall provide shop drawings, which includes as a minimum; all drawings and instructions required for installation of the system. The shop drawing package shall be submitted in as required by Table 1.

3.4.3. EQUIPMENT MANUALS

Operation and maintenance manuals and illustrated parts breakdowns shall be required for every system component with moving parts, electrical/electronic parts and especially components requiring maintenance. Manuals shall incorporate maintenance, testing, inspection, and operator qualification requirements of AFOSH 127-46. Warranties shall be included in the manuals or provided as a separate data item. Manuals shall be submitted in accordance with Table 1.

3.4.4. CERTIFICATIONS

After installation of all equipment the contractor shall certify the system meets or exceeds the requirements listed in sections

4.3.3 of this Cover Purchase Description and all appendices. A general statement that the delivered system meets or exceeds all system requirements is not acceptable i.e. the contractor shall certify each requirement one-by-one. With these certifications the contractor shall also certify the tests in paragraph 4.3.2 of this Cover Purchase Description and of all appendices have been performed and the system is ready for Government inspection.

3.4.5. AS-BUILT DRAWINGS

The Contractor shall provide as-built drawings of all drawing submitted as part of the shop drawing package. As-built drawings shall be submitted in accordance with Table 1.

Table 1 – Data Requirements

SUBMITTAL DUE DATE DISTRIBUTION LIST

FA8604-19-R-8105 Attachment 1, Rev 2 Page 24 of 32

Kirtland AFB, Cover PD - Page 20

James Rowland james.rowland .5@us.af.mil

Buyer identified at time of award

Michael Fowler

Management Reports (3.4.1)

1st business day of each month starting after the month the contract is awarded email with attachment of report email with attachment of report email with attachment of report

Shop Drawings (3.4.2)

Due date is same as

CLIN 0001

Email with attachment of drawings (AutoCAD and PDF) (and one set of hard copies (D Size))

Email with attachment of drawings

(PDF)

Email with attachment of drawings (AutoCAD and PDF) and one set of hard copies (D size)

Manuals (3.4.3)

With delivery of equipment

Email with attachment of manuals (PDF)

Email indicating delivery of manuals completed

Email with attachment of manuals (PDF) and 2 sets of hard copies

Certifications (3.4.4)

Within 2 business days of system installatio n completion

Email with attachment of certification s (Word Document or

PDF)

Email with attachment of certificat ions (Word Document or PDF)

Email with attachment of certificatio ns (Word Document or

PDF)

As-built Drawings (3.4.5)

30 days after Government acceptance of system

Email with attachment of drawings (AutoCAD and PDF) (and one set of hard copies (D Size))

Email with attachment of drawings

(PDF)

Email with attachment of drawings (AutoCAD and PDF) and one set of hard copies (D size)

3.5. ORIENTATION

The Contractor shall provide technical services and materials to orient Government personnel. Fully qualified Contractor personnel who are knowledgeable of the system shall accomplish

FA8604-19-R-8105 Attachment 1, Rev 2 Page 25 of 32 mailto:.5@us.af.mil

Kirtland AFB, Cover PD - Page 21 all orientation. Courses shall be combined in accordance with the Contractor's standard commercial training courses, where applicable, provided all aspects of training are included.

Orientation shall be provided at Kirtland AFB. The Contractor shall provide each attendee with a certificate indicating successful completion of the orientation. All orientation shall be completed prior to the start of the quality conformance test.

3.5.1. SYSTEM OPERATOR ORIENTATION

This orientation shall provide instructions in the overall operational functions that are performed by the system operators. Instructions shall include the operation of all the system components. Upon completion of this course, the operators shall be able to operate all components of the system.

Operators shall be able to perform these functions using only the reference manuals provided with the system relative to operations. An estimated 6 students with possibly no experience will attend.

3.5.1.1. SYSTEM OPERATOR CLASSROOM INSTRUCTIONS

The classroom phase shall include instructions in the operational requirements of the installed system. Classroom instructions shall include a briefing and orientation on the use of the operation manuals supplied by the Contractor.

3.5.1.2. SYSTEM OPERATOR HANDS-ON INSTRUCTIONS

The hands on phase shall include actual operation of the system under the supervision and instruction of the Contractor. Hands-on instruction shall be a minimum of 1 hours.

3.5.2. MAINTENANCE ORIENTATION

This orientation shall provide instructions in corrective and preventive maintenance of the system delivered. Instruction shall include installation and adjustment of all system components. Upon completion of this orientation, students shall be able to install, adjust, and maintain equipment stated using only the maintenance reference manual delivered. An estimated 6 students with possibly no experience will attend.

3.5.2.1. MAINTENANCE CLASSROOM INSTRUCTION

The classroom phase shall include instruction in the maintenance requirements of the installed system. Classroom instruction shall include a briefing and orientation on the use of the

FA8604-19-R-8105 Attachment 1, Rev 2 Page 26 of 32

Kirtland AFB, Cover PD - Page 22 maintenance manuals supplied by the Contractor. Classroom instruction shall be a minimum of 1 hours.

3.5.2.2. MAINTENANCE HANDS-ON INSTRUCTION

The hands-on phase shall include actual field instruction in the maintenance requirements of the installed system. Hands-on instructions shall be a minimum of 1 hours.

4. QUALITY ASSURANCE PROVISIONS

4.1. GENERAL

The COTR shall monitor the installation of the system. The system delivery dates shall not be extended because of work stoppages caused by unacceptable practices and/or test failures.

For all inspections and tests, the Contractor shall provide all test apparatus (i.e., tape measures, levels, calipers, micrometers, stop watches). All test apparatus will be returned to Contractor upon completion of all tests. The Government will provide all test loads.The Contractor shall be responsible for loading and unloading all test loads and performing all inspections and tests. The Contractor shall provide a knowledgeable and authoritative representative on site during the entire acceptance tests.

4.2. ACCEPTANCE TESTS

Three tests must be successfully completed prior to the Government accepting the system. These tests are the system checkout test, the quality conformance test, and the reliability demonstration test.

4.2.1. SYSTEM CHECKOUT TEST

Upon completion of installation, the Contractor using loads of the type specified herein and in the appendices shall check out the system. The Contractor shall inspect the system to assure that the system meets all the requirements of 4.3.1. The Contractor shall also test the system in accordance with the test defined in 4.3.2. All inspections and tests shall be repeated until all modifications and/or adjustments are complete and the system passes all inspections and tests. The Contractor shall submit to the Contracting Officer written certification that the system has passed the requirements of this paragraph.

The COTR will schedule the quality conformance test to start within 10 days following the receipt of the written certification from the Contractor.

FA8604-19-R-8105 Attachment 1, Rev 2 Page 27 of 32

Kirtland AFB, Cover PD - Page 23

4.2.2. QUALITY CONFORMANCE TEST

As part of the quality conformance test, the Contractor shall provide written certification that the requirements listed in

4.3.3. have been met. This certification is required on or before the start of the quality conformance test. The Contractor, in the presence of the COTR, shall inspect the system to confirm that the system meets all the requirements of

4.3.1. The Contractor, in the presence of the COTR, shall also test the system in accordance with the test defined in 4.3.2.

Upon successful completion of all tests and inspections and the receipt of all certifications, the reliability demonstration shall start.

4.2.3. RELIABILITY DEMONSTRATION TEST

After successful completion of the quality conformance test, each component of the system shall demonstrate a reliability and availability greater than that listed in the reliability/availability table in 3.3.1.1. In addition, all static components shall demonstrate compliance with the requirements of the purchase description (PD). The test period shall be the 30 calendar days immediately following the successful completion of the quality conformance test. If the system does not demonstrate the required reliability and availability or compliance with the PD, the test will be restarted from the beginning after the Contractor has taken corrective action. The Contractor shall be allowed to restart the reliability demonstration test a maximum of 2 times. If the system fails to pass the reliability demonstration within 3 attempts, then the system shall be rejected.

4.3. INSPECTIONS, TESTS, AND CERTIFICATIONS

This section defines all inspections and tests that must be completed as part of the system checkout test and repeated at the quality conformance test. This section also includes a list of all certifications that must be received from the Contractor on or before the start of the quality conformance test. The Contractor may add to this list, or question any requirement, by sending a letter to the Contracting Officer prior to the acceptance tests. The COTR will classify all deficiencies encountered into one of the defect classification listed below.

Any critical or major defect found shall be cause for rejection of the system. Any combination of two or more minor defects

FA8604-19-R-8105 Attachment 1, Rev 2 Page 28 of 32

Kirtland AFB, Cover PD - Page 24 shall leave the rejection of the system at the discretion of the

COTR.

Critical Defect - A defect that judgment and experience indicate is likely to result in hazardous or unsafe conditions for individuals using, maintaining, working near, or depending upon the equipment.

Major Defect - A defect other than critical that is likely to result in failure, or reduce materially the system for its intended purpose.

Minor Defect - A defect that is not likely to reduce materially the usability of the system for its intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the system.

4.3.1. INSPECTIONS

The system shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of the cover purchase description (and associate appendices, if applicable). These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.

4.3.2. TESTS

The tests in associated appendices shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.

4.3.3. CERTIFICATIONS

The Contractor shall provide certification that the following requirements (and the certification requirements of associated appendices) have been met in accordance with the Contract Data Requirements List.

No. Paragraph Certifications

1. 3.2.2.2. The installation conforms to applicable rules of NFPA 70.

2. 3.3.1.2. The system was designed, fabricated, and installed to facilitate maintainability and ensure a minimum service life of 15 years.

FA8604-19-R-8105 Attachment 1, Rev 2 Page 29 of 32

Kirtland AFB, Cover PD -…