STATEMENT OF WORK FOR

SHIPPING AND STORAGE CONTAINER, MULTI-PURPOSE, CNU-757/E &

CNU-758/E

29 APRIL 2019

1. INTRODUCTION. The Air Force Packaging Technology and Engineering Facility

(AFPTEF) has engineering authority for reusable, long-term shipping and storage containers designed for various Project Cobra assets. The containers will provide physical and environmental protection during worldwide transportation and storage for the various assets.

2. SCOPE. The contractor will be required to:

2.1. Manufacture. The contractor is to manufacture the CNU-757/E and CNU-758/E shipping and storage containers in accordance with:

2.1.1. Prime Item Product Fabrication Specification. SP20171300 with all associated specifications, standards, and documents.

2.1.2. Drawing Package. DL20171330 for CNU-757/E and DL20171460 for CNU-758/E with all associated drawings, parts lists, and documents, respectively.

2.2. Interface. The contractor must provide a point of contact, name, telephone number, email address, and cell phone number if applicable, for interface with AFPTEF. The AFPTEF point of contact will be the program manager. This will insure coordination of actions and requirements shall be accomplished in a timely and productive manner.

3. TASKS.

3.1. General tasks. The contractor shall have in place a management system to provide supplies and services required to fabricate, evaluate, test, produce, and deliver containers in accordance with Prime Item Product Fabrication Specification SP20171300.

3.1.1. First article testing and inspection. The contractor shall prepare for and host the first article testing and inspection meeting. Three complete sets of piece parts and one complete container of each type shall be required for first article testing and inspection to validate the adequacy of the container manufacturing processes and procedures. The contractor shall have all parts laid out in an area of sufficient size to perform the required inspection and measurement. The contractor shall provide measuring instruments sufficient to verify drawing tolerance compliance. These instruments shall be calibrated for accuracy. The contractor shall provide their internal inspection records and material certifications for inspection and comparison of these documents with the items they describe. The contractor shall ensure quality assurance personnel are available during First Article testing and inspection meeting.

3.1.2. Request for Deviation/Waiver and Engineering Change Proposal. No design changes or modifications shall be made without prior approval from the AFPTEF program manager. Proposed changes which effect cost or schedule require formal approval by the government and shall be submitted through the contracting officer. The contractor's request shall state the nature and reasons for the change and the effect of the change on cost and delivery. Engineering change proposals, which have no effect on cost or schedule, may be approved by the AFPTEF program manager/project engineer, and routed through the contracting office.

3.1.3. First article acceptance and inspection. AFPTEF personnel will perform preliminary

(first article) inspection and acceptance of the pre-production units for conformance to the specification, drawings, and contractor inspection records. The contractor shall notify AFPTEF 15 days prior to the date they propose for the inspection, so schedule and travel arrangements may be made.

3.1.4. UN performance oriented packaging (POP) tests. The contractor shall supply a total of three CNU-758/E to AFPTEF for performance testing (one each in the Base Year, Option Year 2, and Option Year 4) IAW SP20171300. AFPTEF shall prepare a written report at the completion of testing. These containers will not be returned after testing but will count towards production totals.

3.1.5. Production unit acceptance and inspection. The contractor will be notified in writing by the Contracting Officer within 5 days after POP testing acceptance to start production of the containers. The Contracting Officer appointed official will perform final inspection and acceptance of production units at the contractor’s facility.

3.1.6. Rejection of containers. Containers failing to pass the acceptance tests, as outlined in the container fabrication specification (SP20171300), may be modified by the contractor and re-tested or another container may be fabricated.

3.1.7. Management and technical meetings. The government or the contractor may call a technical interchange meeting. The location of the meeting will be determined prior to the meeting date or may be accomplished remotely. The contractor shall notify the government 15 days prior to the date they propose for the meeting, so schedule and travel arrangements (if necessary) may be made.

3.2. Detailed Tasks. The contractor shall comply with the following:

3.2.1. Quality assurance. The contractor shall have a quality control plan/system (e.g. IAW

SAE-AS9100 or ISO 9001) in place for ensuring that the containers meet all specifications and drawing requirements. The contractor's quality assurance program shall be approved by the government quality assurance representative.

3.2.2. Minutes. AFPTEF shall provide minutes of all meetings, formal reviews, and inspections held with the contractor.

3.2.3. Program status reporting. If the contractor experiences any issue that will result in a quality of product and/or a delivery schedule slippage, the contractor shall provide the

AFPTEF program manager with a report detailing the problem, cause, and recovery actions.

3.3. Government Furnished Property (GFP).

3.3.1. Acceptance of GFP. Generic asset representative items will be sent to the contractors’ facility for a FA fit check. The contractor is responsible for ensuring the items are not lost or damaged during this time frame.

3.3.2. Disposition of GFP. The contractor will ship the asset representative items to the specified address (see section 4.4) after acceptance of FA units. All items (22 total) can ship in (1) 20” x 20” x 20” box and have a gross weight of 166 lbs.

4. DELIVERY.

4.1. Container First Article/Production Delivery schedule after contract award.

4.1.1. First Article Test and Inspection (Pre-production): Shall be accomplished no later than

12 weeks after contract award.

4.1.2. Production. After written authorization to begin production, final delivery shall meet the delivery schedule below.

BY: Delivery (Weeks after contract award) 23 27 31 35 39 43 47 Total

CNU-757/E 10 20 23 25 25 25 25 153

Delivery

Location

East 0 2 0 0 8 25 25 60

West 10 18 23 25 17 0 0 93

CNU-758/E 6 12 18 18 18 18 18 108

Delivery

Location

East 0 0 0 0 6 11 14 31

West 6 12 18 18 12 7 4 77

OY1: Delivery (Weeks

13 26 39 52 Total

CNU-757/E 36 30 22 18 106

Delivery

Location

East 18 15 11 12 56

West 18 15 11 6 50

CNU-758/E 18 18 18 16 70

Delivery

Location

East 6 6 6 0 18

West 12 12 12 16 52

OY2: Delivery (Weeks

13 26 39 52 Total

CNU-757/E 24 24 22 21 91

Delivery

Location

East 12 12 9 21 54

West 12 12 13 0 37

CNU-758/E 18 17 13 10 58

Delivery

Location

East 4 4 4 3 15

West 14 13 9 7 43

OY3: Delivery (Weeks

13 26 39 52 Total

CNU-757/E 12 9 9 9 39

Delivery

Location

East 10 9 9 9 37

West 2 0 0 0 2

CNU-758/E 11 9 9 9 38

Delivery

Location

East 9 9 9 9 36

West 2 0 0 0 2

OY4: Delivery (Weeks

13 26 39 52 Total

CNU-758/E 18 18 17 14 67

Delivery

Location

East 14 18 17 14 63

West 4 0 0 0 4

Accelerated deliveries are possible with the approval of the AFPTEF program manager and shall be routed through the contracting officer.

4.2. Preservation and packing. Containers must be stored in an indoor area prior to delivery.

Containers shall be palletized and shrink wrapped for delivery. All conveyances shall be loaded, blocked and braced to ensure containers are protected during typical handling and transport procedures. It is recommended that the humidity indicator litmus paper (if contract or purchase order specifies replacement of drum plugs with humidity indicators) not be placed in the container until ready for delivery.

4.3. Shipping Address. All containers shall be shipped to the following East or West address as stipulated:

WEST ADDRESS:

7538 5TH STREET

BLDG. 850 BAY E

HILL AFB UT 84056-5706

ATTN: SUSAN BLAMEY (801) 775-4049

EAST ADDRESS:

95 CANAL ST.

NASHUA, NH 03064

ATTN: BILL ROBINSON (603) 885-5505