REQUEST FOR INFORMATION III
Solicitation FA8604-10-R-7938 McGuire Air Cargo Handling System Upgrade McGuire AFB, NJ
Question We cannot find in our records from the original Air Freight Terminal of requiring a Pinelands Permit for that project. It was either not in the Pinelands or we received a waiver from the Air Base. Please confirm as to whether or not the location of this project is in the NJ Pinelands and if so is it eligible for a waiver considering we are not disturbing any of the existing storm drainage, near any wetlands or expanding on impervious surfaces.
Response If the disturbed area of the project is under an acre of area, 43560 square feet, then a soil erosion control permit is not required. If a soil erosion control permit is not required, then a Pinelands permit or a Pinelands Waiver will not be required. The surface is already impervious, so the Pinelands Stormwater rules do not apply.