About this file

summary of changes of specifications

View the file

Other files for this federal contract opportunity

Other files attached to BASEWIDE ROOFING WRIGHT PATTERSON AFB, newest first.
File Type Posted
RFI__Responses_1-6.docx DOCX document
FA8601-18-B-0001_Amendment_4.pdf PDF
171102_Specification_Revision_3.pdf PDF
Site_visit_rules_and_attendance_sheet.pdf PDF
FA8601-18-B-0001_Amendment_3.pdf PDF
FA860118B0001_Amendment_02.pdf PDF
FA8601-18-B-0001_Amendment_1.pdf PDF
Bid_schedule_attachment.xlsx XLSX spreadsheet
Specifications.pdf PDF
General_Decision_Number_0H180114__OH180102.pdf PDF
Fa8601-18-B-0001.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ZHTV171102 - Basewide Roofing IDIQ Addendum 01

3/27/2018

Replace “Specifications.pdf” with the attached project specifications, dated 27 March 2018.

Summary of Specification changes:

1. Section 01 01 00 Summary (WPAFB): Add Para 1.05 D.

D. The Contractor shall provide documented proof/resume that shows the Project Manager who will be assigned to this project has a minimum of three (3) years of project management experience with at least (1) roofing system in each of the following listed categories. This experience shall be within the past (10) years.

i. Metal Roofing Systems

ii. Built-up Roofing Systems (Including Modified)

iii. EPDM and TPO Roofing Systems

iv. Mesh Reinforced Elastomeric Coated (MREC) Roofing Systems

2. Section 01 01 00 Summary (WPAFB): Add Para 1.05 E.

E. The Contractor shall provide documented proof/resume that shows the Project Superintendent who will be assigned to this project has a minimum of three (5) years of project management experience with at least (1) roofing system in each of the following listed categories. This experience shall be within the past (15) years.

i. Metal Roofing Systems

ii. Built-up Roofing Systems (Including Modified)

iii. EPDM and TPO Roofing Systems

iv. Mesh Reinforced Elastomeric Coated (MREC) Roofing Systems

3. Section 01 01 00 Summary (WPAFB): Add Para 1.06 A, B, C, D

1.06 ROOFING SYSTEM MANUFACTURER CERTIFICATIONS

The Contractor shall provide documented proof that shows certification or manufacturer authorization letter for their company to install the following roofing systems. This certification or authorization letter must not be expired and this will be verified with the manufacturer.

A. Metal Roofing Systems

i. Butler

ii. MBCI

iii. Merchant and Evans B. Built-up Roofing Systems

i. Firestone

ii. GAF

iii. Johns Manville C. EPDM and TPO Roofing Systems

i. Carlisle

ii. Firestone

iii. Johns Manville D. Mesh Reinforced Elastomeric Coated (MREC) Roofing Systems

i. Tremco

ii. GAF

iii. Firestone

4. Section 01 01 00 Summary (WPAFB): Add Para 1.07 A, B, C, D

1.07 ROOF MANAGEMENT AND RESPONSE

A. The Contractor shall be capable of managing up to (20) issued task orders at one time, all of which will be under $150,000.

B. The Contractor shall be capable of meeting the emergency and urgent response times as defined below. Note: Only the Contracting Officer or their Contracting Representative will make the determination of whether a deficiency is an emergency or urgent.

i. Emergency Service Calls – Respond within (2) hours of notification; stay on the job until the emergency has been averted.

ii. Urgent Service Calls – Respond within (24) hours of notification; correct the problem within 5 days of original notification.

C. At time of contract award, provide office location and/or pre-qualified subcontractors within Dayton, OH area; as well as, a mobilization plan from these locations.

D. At time of contract award, provide a quality control plan that illustrates your inspection system and inspection plan to ensure contract and manufacturer compliance.

5. Section 07 14 00 Fluid-Applied Waterproofing: Remove from contract.

6. Section 07 51 13 Built-Up Roofing: Add this UFGS spec to the contract.

7. Section 07 56 13 MESH REINFORCED ELASTOMERIC COATING (MREC) POLYURETHANE

MEMBRANE ROOFING: Add this WAFB spec to the contract.