NATIONAL ELEVATOR BARGAINING ASSOCIATION AGREEMENT
WITH
INTERNATIONAL UNION OF ELEVATOR CONSTRUCTORS
July 9, 2012 to July 8, 2017
Whenever any words are used in this Agreement in the masculine gender they shall be construed as though they are also used in the feminine gender or neuter gender in all situations where they would so apply.
INDEX
ARTICLE
I Parties to the Agreement
II Recognition Clause
III Membership Requirements
IV Work Jurisdiction
IV (A) Systems, Modular and Industrial Structure
V Wages
VI Holidays
VII Construction Work
VIII Repair Work
VIII (A) Modernization Work
IX Contract Service
X Designation of Helper’s, Apprentice’s and Assistant Mechanic’s Work and Qualifications
XI System of Payment
XII Vacations
XIII Traveling Time and Expenses
XIV Strikes and Lockouts
XV Arbitration
XVI Jurisdictional Territory
XVII Health Benefit Plan
XVIII Pension Plan
XVIII (A) 401(k) Annuity
XIX Educational Fund
XX Elevator Industry Work Preservation Fund
XXI Payment for Lost or Stolen Tools
XXI (A) Metric Tools
XXII Hiring, Layoffs and Transfers
XXIII Scope and Terms of Agreement
XXIV Re - Opening Clause
XXV Termination of Agreement
XXVI Local Option
XXVII Reporting Time, Subpoenaed Witnesses, Uniforms
Appendix A Decisions of the Joint Industry Committee
Letters of Agreement
Substance Abuse
ARTICLE I
Parties to the Agreement
This Agreement, made by and between the National Elevator Bargaining Association
(hereinafter referred to as “NEBA”) and the INTERNATIONAL UNION OF ELEVATOR
CONSTRUCTORS (hereinafter referred to as "IUEC" or the "Union"), for the purpose of establishing harmonious relations and facilitating peaceful adjustment of wage schedules and working conditions. The INTERNATIONAL UNION OF ELEVATOR CONSTRUCTORS makes this Agreement for and on behalf of its affiliated local unions and a list of the local unions for which the International negotiates and executes this Agreement is attached hereto and made a part hereof. NEBA makes this Agreement for and on behalf of its employer members (hereinafter referred to individually as the “Company” or the “Employer”), and a list of the Employers for which NEBA negotiates and executes this Agreement is attached hereto and made a part hereof.
ARTICLE II
Recognition Clause
Par. 1. The Union claims and the Employer acknowledges and agrees that the Union has supplied proof that a majority of its Elevator Constructor Mechanics, Elevator Constructor Helpers and
Elevator Constructor Apprentices have authorized the Union to represent them in collective bargaining with the Employer.
The Employer recognizes the Union as the exclusive Section 9(a) bargaining representative for all Elevator Constructor Mechanics, Elevator Constructor Helpers, Elevator Constructor
Apprentices and Elevator Constructor Assistant Mechanics (hereinafter referred to sometimes as
"Mechanics, Helpers, Apprentices and Assistant Mechanics " or collectively as “Elevator
Constructor(s)”) in the employ of the Employers engaged in the installation, repair, modernization, maintenance and servicing of all equipment referred to in Article IV, Par. 2 and Article IV (A).
Par. 2. The Union recognizes that it is the responsibility of the Company in the interest of the purchaser, the Company and its employees to maintain the highest degree of operating efficiency and to continue technical development to obtain better quality, reliability, and cost of its product provided, however, that this provision is not intended to affect the work jurisdiction specified in
Article IV and other Articles of the Agreement.
ARTICLE III
Membership Requirements
Par. 1. All Mechanics, Helpers, Apprentices and Assistant Mechanics covered by this Agreement shall, as a condition of employment obtain and maintain membership in a local union of the
International Union of Elevator Constructors on and after the thirtieth (30th) day following the beginning of their employment or the date this Article becomes effective, whichever is later.
Par. 2. The Company shall be obligated under this Article, after it becomes effective as above provided, to terminate the employment of any employee who fails to obtain or maintain membership in a local union as required by this Article, upon receipt of a written request for such termination from his local union: except that the Company shall have the right to refuse such request if it has reasonable grounds for believing (1) that such membership is not available to the employee on the same terms and conditions generally applicable to other members, or (2) that membership has been denied or terminated for reasons other than the failure of the employee to tender the periodic dues and initiation fees uniformly required as a condition of acquiring or retaining membership.
Par. 3. Employees working in any state which prohibits the execution or application of
Agreements requiring membership in a labor organization as a condition of employment have the right to join or refrain from joining the International Union of Elevator Constructors. Employees who decide not to join the Union, however, and who are covered by this Agreement shall, as a condition of employment, be required to pay a monthly service fee to the Union. The service fee shall be the employees’ prorata share of costs of collective bargaining and the handling of grievances and arbitrations. The service fee shall not include any prorata share of costs of items other than collective bargaining and handling of grievances and arbitrations, and under no circumstances will the service fee be used by the Union for any purpose other than to meet the expenses of collective bargaining and handling of grievances and arbitrations.
On and after the thirtieth (30th) day following the date of this Agreement or on and after the thirtieth (30th) day following the date of commencement of employment by an employee, whichever is later, regular tendering of the service fee shall be a condition of employment, subject to the rights of employees and obligations of parties under the law.
Service fees shall be payable on or before the first day of each month.
Par. 4. All of the provisions of this Article shall be effective to the extent permitted by applicable law.
ARTICLE IV
Work Jurisdiction
Par. 1. It is agreed by the parties to this Agreement that all work specified in Article IV shall be performed exclusively by Elevator Constructor Mechanics, Elevator Constructor Helpers, Elevator
Constructor Apprentices and Elevator Constructor Assistant Mechanics in the employ of the
Company.
Par. 2.
(a) The handling and unloading of all equipment coming under the jurisdiction of the
Elevator Constructor, from the time such equipment arrives at or near the building site, shall be handled and unloaded by the Elevator Constructors. Mechanical equipment such as a fork lift or truck mounted swing boom may be used by the Elevator Constructors. A derrick, crane or material hoist can be used under the supervision of Elevator Constructors to handle and unload the heavy material described in Par. 5(a). Where unusual conditions are expected to exist prior to delivery of equipment at or near the building site in regard to handling and unloading of equipment in the primary or secondary jurisdiction of the local union, the Company shall contact the Local's
Business Representative to make appropriate arrangements for the handling and unloading of such equipment. In areas outside the jurisdiction of the local union, the Company shall contact the
Regional Director.
(b) The erecting and assembling of all elevator equipment to wit: electric, hydraulic, steam, belt, dumbwaiters, residence elevators, parking garage elevators (such as Bowser, Pigeon Hole, or similar types of elevators), shuttles, compressed air and handpower, automatic people movers, monorails, airport shuttles and like-named devices used in the transportation of people for short distances of travel (less than 5 miles), as well as vertical reciprocating conveyor systems.
(c) It is understood and agreed that the preassembly of all escalators, moving stairways and link belt carriers that may be done in the factory shall include the following:
1. Truss or truss sections with tracks, drive units, machines, handrail drive sheaves, drive chains, skirts on the incline sections but not curved sections, step chains and steps installed and permanently aligned.
2. Balustrade brackets may be shipped attached but not aligned.
3. Setting of all controllers and all wiring and conduit from the controller.
All other work on escalators, moving stairways and link belt carriers shall be performed in the field by Elevator Constructor Mechanics, Helpers, Apprentices and Assistant Mechanics either before or after the truss or truss sections are joined and/or hoisted and placed in permanent position. This includes any and all work not done in the factory.
The erecting and assembly of all theater stage and curtain elevator equipment and guides and rigging thereto, organ consoles and orchestra elevators shall be performed by Elevator
Constructor Mechanics, Helpers, Apprentices and Assistant Mechanics.
(d) All wiring, conduit, and raceways from main line feeder terminals on the controller to other elevator apparatus and operating circuits. Controllers are not to be shipped from the factory with extended wiring attached thereto.
(e) The erecting of all guide rails.
(f) The installation of all grating under the control of the Company. The installation of all counterweight screens, overhead work, either wood or iron, and all material used for mounting of elevator apparatus in machine room, overhead or below.
(g) The drilling of overhead beams for attaching machines, sheaves, kick angles, and all other elevator equipment.
(h) The setting of all templates.
(i) All foundations, either of wood or metal, that should take the place of masonry.
(j) The assembly of all cabs complete.
(k) The installation of all indicators.
(1) The erecting of all electrical or mechanical automatic or semi-automatic gates complete.
(m) The hanging of all automatic or semi-automatic elevator hoistway doors, together with the installation of hangers and tracks.
(n) The installation of all devices for opening and closing, and locking of elevator car and hoistway doors and gates.
(o) The drilling of doors for mounting of closing devices.
(p) The drilling of angle supports for mounting of closing devices except one template hole.
(q) The drilling of sills for sill trips.
(r) The operating of temporary cars.
(s) The setting of all elevator pressure open or pit tanks.
(t) The setting of hydraulic power units (power units include: motor, pump, drive valve system, internal piping, muffler, internal wiring, controller and tank). Where power units arrive in parts, they shall be assembled at the job site. The wiring and piping to and between multiple hydraulic power units shall be performed at the job site.
(u) All air cushions with the exception of those built of brick or those put together with hot rivets.
(v) Landing door entrances.
Par. 3.
(a) Nothing contained in Article IV shall preclude the Company from preassembling and prefabricating the following:
(1) Temporary elevators
A temporary elevator is defined as a nonpermanent elevator installed prior to or during construction work inside or outside buildings. The assembly, disassembly and moving of temporary elevators from job to job or area to area may be accomplished in the most economical fashion provided, however, whatever work is required to be performed at the job site in connection therewith shall be performed exclusively by Elevator Constructor Mechanics, Helpers, Apprentices and Assistant Mechanics.
(2) Residence elevators
Residence elevators shall mean elevators installed solely for use in a single family residence and not for general public use. Single family residences may be part of a multi-unit structure.
(3) Dumbwaiters
(4) Dock elevators
(5) Parking garage elevators (such as Bowser, Pigeon Hole or similar types of elevators)
(6) Apartment House elevators
Apartment house elevators shall mean an elevator installed in a multi-unit, multifamily structure, (excluding condominiums) but not to exceed three (3) stories in height (i.e. 36 ft.) and the elevator shall not make more than three (3) stops nor exceed a capacity of 2500 lbs.
(7) Preassembled plug connectors may be used to interconnect the solid state components of the elevator systems (solid state to solid state only), and to connect any component in and on the car.
When the use of fiber optics is applied to the elevator system, preassembled plugs/coupling devices may be used to maintain the integrity of the connection(s).
It is understood and agreed that the connecting and/or coupling of devices will be done by the Elevator Constructor whether accomplished by external wiring or preassembled plug connectors as provided in this Paragraph.
(8) Limited Use/Limited Access Elevators which shall mean elevators described under the scope of Limited Use/Limited Access Elevators as defined in A.S.M.E. A17.1.
Incline stairway chair lifts and incline and vertical wheelchair lifts shall mean lifts described under the scope of A.S.M.E. A17.1.
Limited Use/Limited Access Elevators, incline stairway chair lifts, inclined and vertical wheelchair lifts, and residence elevators may be installed in the most economical fashion, provided there is no factor of safety involved. Whatever work is required to be performed at the job site in connection therewith shall be performed exclusively by Elevator Constructor Mechanics, Helpers, Apprentices and Assistant Mechanics.
(9) Landing door entrance assemblies which will be limited to struts, sills, headers, frames and associated hardware for installation purposes: door header including tracks, hangers, and all relating devices (adjusting and aligning to be done in the field).
(10) Car-top inspection station which may only include pre-wired service light, gate switch, alarm device and inspection station.
(a) Pre-wired canopies with lights and fans.
Par. 3.
(b) It is understood and agreed that the preassembly and/or prefabrication of electric walks, Trav-o-lators, speed ramps or similar type of moving walks, (limited to 15° incline per ANSI
Code), shall include the following:
(1) Truss sections with drive units, machines, handrail drive sheaves and drive chains installed and aligned.
(2) Truss sections with tracks installed and aligned.
(3) Balustrade brackets may be shipped attached but not aligned.
(4) Setting of all controllers and all wiring and conduit from controllers.
Work to be done in the field shall include setting and aligning of truss sections and supports, installation of pallets (platforms and belting), handrails, handrail idler sheaves, centering guides, combplates, balustrades and trim.
Par. 4.
(a) It is agreed that when sinking, drilling, boring or digging cylinder wells for hydraulic lifts, hydraulic elevators or screw lifts, the Company shall employ Elevator Constructor
Mechanics, Elevator Constructor Helpers, Elevator Constructor Apprentices and Elevator
Constructor Assistant Mechanics.
(b) On any job where the Company subcontracts the sinking, drilling, boring or digging of cylinder wells for hydraulic lifts, hydraulic elevators or screw lifts, one Elevator Constructor
Mechanic shall be employed by the Company to supervise and assist in any and/or all work related to sinking, drilling, boring or digging of the cylinder well including the installation of the casing whether its sections be welded, screwed or riveted or by any other method joined.
(c) It is agreed that the work performed by the subcontractor shall be strictly limited to work in connection with the digging of the hole and the installation of the casing. It is understood that the Company will have the preceding sentence inserted in his contract with the subcontractor.
(d) The Company shall have the Elevator Constructor Mechanic on the job at the time the subcontractor arrives on the job for the drilling of the hole and during the entire time the subcontractor performs any work in connection with the drilling of the hole including the setting up and/or assembly and disassembly of the rig.
(e) If the Company violates the requirement defined in Par. (d) it shall be assessed and pay as liquidated damages a sum equal to double the total compensation of the Elevator Constructor
Mechanic in the area for the number of hours an Elevator Constructor Mechanic should have been on the job and was not on the job in the sinking, drilling, boring or digging the cylinder well. This liquidated damage shall be paid by the Company to the said jointly administered trust fund.
In the case of a second offense, the liquidated damages shall be computed on the same basis as the first offense, except that the amount shall be tripled instead of doubled; for the third and subsequent offenses during the term of this Agreement, the liquidated damages shall be $500 more than the second offense.
The Company's Regions shall constitute separate areas for the counting of repeated violations by the Company and only violations in the same district shall be counted for the purpose of imposing graduated penalties.
(f) Should a work stoppage or strike occur because of a dispute over the application or interpretation of this paragraph none of the foregoing penalties will be imposed.
Par. 5.
(a) Where heavy material is to be hoisted or lowered outside of the structure, a derrick, crane or material hoist can be used under the supervision of Elevator Constructors in the employ of the Company. Heavy material under subparagraph (a) is confined to machines, controllers, generators, trusses, or sections of trusses, plungers and cylinders. (Where multiple sections of cylinders and plungers are used, they shall be connected in the field by Elevator Constructors.
Exception: the Company’s multiple sections of cylinders may be connected either in the field or factory up to thirty-eight (38) feet in length; where multiple sections of plungers are used, they shall be connected in the field by Elevator Constructors.) In addition to the foregoing, the
Company shall have the right to utilize derricks, cranes or a material hoist to hoist or lower tools of the trade, gang boxes, welders, air and gas tanks, cutting torches, material handling equipment and safety equipment.
(b) Where conditions are such that the following heavy material can be hoisted up the hoistway, it shall be hoisted by the Elevator Constructors. Where conditions are such that the following heavy material cannot be hoisted up the hoistway, it can be hoisted with a crane or material hoist under the supervision of Elevator Constructors. Heavy material under subparagraph
(b) is confined to beams, sheaves, bundles of rails and preassembled landing door entrances.
(c) The above heavy material in subparagraphs (a) and (b) shall be hoisted separately with the exception of plungers and cylinders, rails, beams, preassembled landing door entrances and where conditions warrant machines with beams, which may be hoisted together.
(d) All other material is to be hoisted or lowered by Elevator Constructors without the use of derrick or crane.
Par. 6. The wrecking or dismantling of elevator plants shall be performed by Elevator Constructor
Mechanics, Elevator Constructor Helpers, Elevator Constructor Apprentices and Elevator
Constructor Assistant Mechanics. It is understood and agreed that the Union reserves the right to refuse to install any new elevators in any plant where the wrecking or dismantling of the old elevator plant has been done by other than Elevator Constructor Mechanics, Elevator Constructor
Helpers, Elevator Constructor Apprentices and Elevator Constructor Assistant Mechanics. Before the local union shall refuse to install a new elevator, such action must be first approved by the
International. Elevator plants as referred to in this paragraph are understood to include elevators, escalators, moving stairways, dumbwaiters, moving walks and all other equipment coming under the jurisdiction of the Elevator Constructor.
Par. 7. Where Elevator Constructor Mechanics are not available to lay car floor covering, it is agreed that the Company may employ others to do this work.
Par. 8. Inserts and/or bond blocks are to be set by Elevator Constructor Mechanics in the primary jurisdictions of local unions at the option of the Company. Inserts may be set by others outside of the primary jurisdictions of local unions where a full day's work cannot be provided.
Par. 9. No restrictions shall be imposed as to methods, tools, or equipment used.
Par. 10. It is agreed that the work specified in Article IV has always been performed exclusively by Elevator Constructor Mechanics, Helpers, Apprentices and Assistant Mechanics in the employ of the Company at the site of the installation. It is agreed that effective July 9, 1977, the work specified in Article IV that is performed exclusively by Elevator Constructor Mechanics, Helpers, Apprentices and Assistant Mechanics may be performed at the site of the installation or at another assembly point provided that (1) the assembly point is not in or adjacent to the Company's manufacturing facility, (2) the assembly point is within the primary or secondary jurisdiction of the local union in whose jurisdiction the site of installation is located, and (3) the work is performed by Elevator Constructor Mechanics, Helpers, Apprentices and Assistant Mechanics of the local union in whose jurisdiction the site of installation is located. If the site of installation is located outside the jurisdiction of a local union (in open territory), it is agreed that (1) the assembly point must be within twenty-five (25) miles of the site of installation, (2) the assembly point is not in or adjacent to the Company's manufacturing facility, and (3) the work is performed by Elevator
Constructor Mechanics, Helpers, Apprentices and Assistant Mechanics from the local union who ordinarily perform work for the Company in the vicinity of the site of the installation. The unloading and handling of all equipment coming under the jurisdiction of the Elevator Constructor at an assembly point shall be performed in accordance with Par. 2(a) of this Article.
Par. 11.
(a) All differences and disputes concerning Article IV or Article IV(A) shall be settled in accordance with the grievance procedures in Article XV.
(b) While any question or dispute pertaining to Article IV or Article IV(A) is being processed the Company, where possible, shall assign the employees work other than the work in dispute. Where the work has progressed to a point where it is not possible to perform work other than the work in dispute, then the employee shall perform the disputed work pending final resolution as provided herein.
ARTICLE IV(A)
Systems, Modular and Industrial Structures
Par. 1. Systems Building. Systems, modular, industrialized or similar structures are those whose superstructures and components are pre-assembled in sections, rooms, or floors, in whole or in part, in areas adjacent to or remote from the permanent site of the structure. The erection and assembly of elevator components in building modules is to be done by Elevator Constructor
Mechanics, Helpers, Apprentices and Assistant Mechanics whether the assembly site is adjacent to the job or remote from the job. Where the Company has a choice or selection of the assembly site, such sites are to be mutually agreed upon by the General President of the International Union of
Elevator Constructors and the Company. It is understood that if members of one local perform part of such work at an assembly site remote from the permanent job site, members of the local covering the permanent job site will perform the remainder of the work. The elevator work remaining to be done after modules have been put into permanent place, shall be performed by
Elevator Constructor Mechanics, Helpers, Apprentices and Assistant Mechanics so that the jurisdiction of the Elevator Constructor as related to any other Building Trade, shall remain intact as outlined in the latest "Green Book" or "Plan for Settling Jurisdictional Disputes, Nationally &
Locally" or its successor as approved by the Building & Construction Trades Dept., AFL-CIO.
Par. 2. The work to be done by Elevator Constructors is as follows:
(a) The installation and assembly of all machine room equipment whether overhead or below on prefabricated machine room floors.
(b) Assemble car frames and cabs complete with door operating equipment, control, signal and operating devices.
(c) Connect electric traveling cables to either car, controller or half-way junction box. The connections to be prepared and/or made at both ends of assembly site.
(d) Shackle hoist, compensating and governor cables and pre-connect to car or counterweight hitches.
(e) The setting of templates.
(f) The installation of all grating and counterweight screens, overhead work, either wood or iron, and all material used for mounting of elevator apparatus in machine rooms, overhead or below.
(g) All foundations, either of wood or metal, that should take the place of masonry.
(h) The installation and aligning of guide rails in hoistway modules.
(i) Erect and assemble doors, hangers, tracks, door locks or locking devices for opening or closing and all related equipment.
(j) Install corridor side operating and signal devices.
(k) Install hoistway wiring.
(1) Install all elevator equipment and devices in hoistway and hoistway modules including governor rope tension sheaves, control equipment, buffers and supports.
(m) The operating of temporary elevators.
(n) The installation and aligning of all pistons and cylinders on hydraulic elevators.
(o) Landing door entrances.
Unloading, handling, hoisting and lowering of material covered in (a) through (o) will be performed under the supervision of Elevator Constructors.
Par. 3. Nothing in this Article is intended to change the practices either party has previously enjoyed in erection of elevators in conventional type buildings as related to Article IV.
ARTICLE V
Wages
Par. 1. The rate of wages to be paid to Elevator Constructor Mechanics, Helpers, Apprentices and
Assistant Mechanics shall be determined in accordance with the following schedule. Effective
January 1, 2013 and every twelve (12) months thereafter, during the term of this agreement, each local’s existing total package shall be increased according to the following schedule:
1st Year Gross Increase -------- . 3.00%
2nd Year Gross Increase ------- . 3.25%
3rd Year Gross Increase ------- 3.25%
4th Year Gross Increase ------- 3.45%
5th Year Gross Increase ------- 3.45%
Par. 2. Subtracted from the gross increase shall be the credits agreed upon in Par. 3 below. The remainder shall be the wage rate increase for the Elevator Constructor Mechanics in that Local.
Par. 3. The amounts of credits for wage rate increases effective January 1, 2013 and every twelve months thereafter shall be as follows:
Current Wage Rate Amount
Contribution Level $23.835 Fringe Total
January 1, 2013 ...................... $1.65 $25.485
January 1, 2014 ...................... $1.60 $27.085
January 1, 2015...................... $1.60 $28.685
January 1, 2016 ...................... $1.60 $30.285
January 1, 2017 ...................... $1.60 $31.885
The above gross increases will be reallocated and the above credit amounts increased or decreased accordingly after the effective date of this Agreement by whatever different amounts, if any, the Union determines are necessary to fund the Health Plan, the Pension Plan, Education Fund and Elevator Industry Work Preservation Fund by modifying the hourly contribution rate up to twenty five ($.25) cents per fund per year at the recommendation of the joint trustees.
The above gross increase will be reallocated and the above credit amounts increased or decreased accordingly after the effective date of this Agreement by whatever different amounts, if any, the Union determines is necessary to fund the Annuity Fund by modifying the hourly contribution rate up to twenty five ($.25) cents to the Annuity Fund per year at the discretion of the
Union.
Par. 4. Subtracting the credits from the gross increases yields the following wage rate increases for the Elevator Constructor Mechanic:
st Year Wage Rate Increase ---------------------------- Subtract the $1.65 per hour fringe contribution increase from the computed total package percentage, and the result will be the wage rate increase for the Elevator Constructor
Mechanic.
nd
, 3 rd
, 4 th
, 5 th
Year Wage Rate Increase ------------ Subtract the $1.60 per hour fringe contribution increase from the computed total package percentage, and the result will be the wage rate increase for the Elevator Constructor
Mechanic.
Par. 5. The wage rate for the Elevator Constructor Helpers shall be seventy (70) percent of the
Elevator Constructor Mechanic’s rate.
Par. 6. The wage rate for Elevator Constructor Apprentices shall be the progressive scale of wages set forth below, and those progressive elevations shall become effective the next full pay cycle following September 1 st , commencing September 1, 2003 and each year thereafter:
Probationary Apprentice, (0-6months): 50% of Mechanic’s Rate.
First Year Apprentice, 55% of Mechanic’s Rate, plus fringe benefits as provided by the collective bargaining agreement. (This shall include months 7-12 of the Probationary period).
Second Year Apprentice, 65% of Mechanic’s Rate, plus fringe benefits as provided by the collective bargaining agreement.
Third Year Apprentice, 70% of Mechanic’s Rate, plus fringe benefits as provided by the collective bargaining agreement.
Fourth Year Apprentice and Assistant Mechanic, 80% of Mechanic’s Rate, plus fringe benefits as provided by the collective bargaining agreement.
Par. 7. When four (4) or more men, including the Elevator Constructor Mechanic–In-Charge, are employed on new construction or modernization jobs, the Elevator Constructor Mechanic-In-
Charge of the job shall have his hourly rate increased 12-1/2% for all hours worked.
Par. 8. The gross increases set out in this Article shall apply to all Elevator Constructor Mechanics, Elevator Constructor Helpers, Elevator Constructor Apprentices and Elevator Constructor Assistant
Mechanics engaged in construction, repair, modernization and contract service work, as defined and covered in this Agreement.
ARTICLE VI
Holidays
Par. 1. The following shall be designated as paid holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans’ Day, Thanksgiving Day, the Friday after Thanksgiving
Day and Christmas Day.
Par. 2. In addition, each local may retain established unpaid holidays already agreed upon by past procedure or observed by local building trades councils or declared by State or National
Governments. Any new Federal holidays such as President's Day and Columbus Day are not to be considered as paid or unpaid holidays unless previously celebrated by the parties to this
Agreement.
Par. 3. To be eligible for a paid holiday, an employee must have been on the Company's payroll within the calendar week, Sunday to Saturday inclusive, previous to the week in which the holiday occurs. "On the payroll" means that an employee must have performed actual work or have been on an authorized paid vacation. If an employee desires to extend his vacation beyond the earned paid vacation period, such extension of that time shall not be considered as "on the payroll."
Par. 4. The holiday provisions of this Article shall apply to all Elevator Constructor Mechanics, Elevator Constructor Helpers, Elevator Constructor Apprentices and Elevator Constructor
Assistant Mechanics engaged in construction, repair, modernization and contract service work as defined and covered in this Agreement.
Par. 5. Eligible employees shall be paid for the regular workday and the paid holidays enumerated in Par. 1 at the regular straight time rate of the classification worked prior to the observance of the holiday. The rate of pay for all work performed on paid holidays shall be at the double time rate in addition to the holiday pay. Any unpaid holidays observed as provided in Par. 2 shall be without pay, but if worked shall be double time rate.
Par. 6. When a paid holiday falls on Saturday, it shall be observed on Friday. When a paid holiday falls on Sunday, it shall be observed on Monday.
Par. 7. The Company shall not lay off or terminate an employee to circumvent holiday pay as provided herein.
Par. 8. Employees who work on a holiday that falls on a Saturday or Sunday and that holiday is observed on a Friday or Monday, respectively, shall be paid at the specified overtime rates for work performed on Saturdays or Sundays. (i.e., if July 4th falls on Saturday it will be celebrated on
Friday, July 3rd. Work performed on July 3rd will be double time (2X) and work performed on
July 4th will be paid at the specified overtime rate).
ARTICLE VII
Construction Work
Par. 1. Construction work is hereby defined as erecting and assembling of apparatus as enumerated in Article IV and Article IV (A) of this Agreement, except general repairs and modernization as defined in Article VIII and VIII (A). It is hereby agreed that all Construction
Work as above defined shall be performed exclusively by Mechanics, Helpers, Apprentices and
Assistant Mechanics.
Par. 2. It is agreed that the regular working day shall consist of eight (8) hours worked consecutively with an unpaid lunch period, between 6 A.M., and 5 P.M., five (5) days per week, Monday to Friday, inclusive. Hours of work at each job site shall be those established by the general contractor and worked by the majority of trades. (The above working hours may be changed by mutual agreement as provided in Article XXVI). If the general contractor shuts down operations on a day not recognized as a holiday under this Agreement, the Company shall make every effort to place the affected employees on other work for that day.
Par. 2A. Upon written notification to the Local Business Representative, the Company may establish hours worked on a job site for a four (4) ten (10) hour day workweek at straight time pay for construction work. It is agreed that the regular working day shall consist of ten (10) hours worked consecutively with an unpaid lunch period, between 6 A.M. and 6 P.M., four (4) days per week, Monday to Thursday, inclusive. Any work performed on Friday, Saturday and Sunday and before and after the regular working day on Monday to Thursday where a four (4) ten (10) hour day workweek has been established, will be paid double the rate of single time.
When working in a per diem area and work continues on the same job site the following week, the employee shall receive per diem for Friday, Saturday and Sunday.
It is agreed that when a Holiday falls on Sunday to Thursday, it shall be observed on the day of the Holiday or per Article VI, Par. 6 and, providing the employee complies with Article VI, Par. 3, he/she will be paid ten (10) hours for that Holiday. If the Holiday falls on Friday or Saturday, the employee will be paid eight (8) hours for that Holiday.
Par. 3. Work performed on Construction Work on Saturdays, Sundays and before and after the regular working day on Monday to Friday, inclusive, shall be classed as overtime, and paid for at double the rate of single time.
Par. 4. When any four (4) of the seven (7) Atlantic City Formula Trades obtain a six (6) hour day, the Union shall work a six (6) hour day, the working day to be between the hours of 6 A.M. and 5
P.M. When sufficient Mechanics, Helpers, Apprentices and Assistant Mechanics are not available, an eight (8) hour day shall be worked. Whenever a local union obtains a six (6) hour day under this paragraph, the local union and the Company shall bargain as to the hours and overtime rates to be applied on the six (6) hour day.
Par. 5.
(a) When a majority of the Atlantic City Formula Trades (this means there must be four (4) of the seven (7) union Atlantic City trades), on a job work a shift or shifts following the day shift, the Company may work the following shifts. However, trades who perform the work as per their regular overtime rates shall not be considered as shift work.
(b) It is agreed that the "Day Shift" shall consist of eight (8) hours between 8 A.M. and
4:30 P.M., five (5) days per week, Monday through Friday, inclusive.
(c) The shift following the "Day Shift" shall work 7-1/2 hours between the hours of 4:30
P.M. and 12:30 A.M. and shall receive eight (8) hours pay plus an additional 10% per hour. The shift preceding the "Day Shift" shall work seven (7) hours between the hours of 12:30 A.M. and 8
A.M. and receive eight (8) hours pay plus an additional 15% per hour.
Any and all work during hours other than the established hours for any one of the three shifts shall be paid at double the hourly wage rate including any premium rate of the assigned shift.
(1) When an employee is called in prior to the regular starting time for his shift or he works beyond the regular quitting time of his shift, he shall receive double the hourly wage rate of his assigned shift for all hours in excess of the established hours for his shift.
(2) When an employee is required to work hours that are not continuous with the established hours for his assigned shift he shall be paid for such hours at double the hourly wage rate of his assigned shift or double the hourly wage rate of the shift on which such excess hours are performed whichever rate is higher.
(3) When the Company assigns an employee to a shift the employee shall work that shift a minimum of five (5) consecutive days. However, should the Company reassign an employee to another shift prior to working five (5) consecutive days, or within twenty-four (24) hours of completing a shift, the employee shall receive the applicable overtime rate of the new shift he is assigned to for the first day only or the applicable overtime rate of the shift to which he had previously been assigned, whichever is higher, thereafter the employee shall receive the applicable rates for the new shift to which he is assigned. An employee who requests a shift reassignment and is reassigned as outlined herein, shall receive the applicable rates for the new shift to which he is assigned at single time only.
(4) When an employee has performed work on another job and he is directed to work on a shift job within twenty-four (24) hours after completing work on the other job, he shall receive the applicable overtime rate of his prior job or the applicable overtime rate of the shift to which he is assigned whichever rate is higher.
(d) Any work performed on Saturday, Sunday, or a Holiday shall be paid at double the hourly wage rate of the applicable shift including any premium rate.
(e) In the case of the second and third shifts and for the purpose of fringe benefit computations, each employee who works a full shift shall be considered to have worked eight (8) hours.
(f) The working hours set forth in Par. 3 and Par. 4 above may be changed by mutual agreement as provided in Article XXVI.
ARTICLE VIII
Repair Work
Par. 1. Repair Work is hereby defined as general repairs on apparatus enumerated in Article IV and Article IV(A) of this Agreement. Repair work shall be exclusively performed by Mechanics, Helpers, Apprentices and Assistant Mechanics.
Par. 2. General repairs are hereby defined as follows:
Team repairs:
Renewal of all ropes.
Renewal of brake linings (except small machines).
Shortening of all hoisting and counterweight cables.
Replacement of any traveling cable exceeding 50 feet in length.
Safety test where test weights are required.
Replacement of crosshead, counterweight or deflector sheave bearings.
Rescoring of sheaves or drums.
Replacement of worm and gears.
Rebabbitting of bearings.
Hydraulic repair work except cleaning, oiling, greasing, belts, small valves, adjusting and one man pressure relief valve test performed in accordance with Appendix A, item 22.
Adjusting or readjusting using test weights.
Realigning guide rails.
Replacing crossheads, stiles, safeties or equalizers.
Hoistway door closers with hydraulic or pneumatic checks.
All escalator and moving walk repair work must be done by a team. (Exception Article IX, Contract Service Work, call-backs and examination may be done by one person if there is no factor of safety).
Exception to above: Residence elevator as described in A.S.M.E. A17.1 code which shall be one person.
One man repairs:
Installing sound isolation.
Replacement of door hangers (except for freight bi-parting doors).
All door closer work (except for freight bi-parting doors).
Rewiring car switches, governors and selectors or any other apparatus in the car.
Refastening guide rails.
Replacing or repairing car floor covering.
Rewiring or reinstalling limit switches.
Replacing automatic rail or track oilers.
One or Two Man Repairs:
Armature repairs.
Renewing of car shoes or roller guides.
Repairs to cab or car gate.
Renewal of motor bearings.
Replacing thrust bearings.
Rewiring controllers.
Installation and/or replacement of the following (except when the completion of such work requires more than eight (8) hours, excluding travel time, it shall be performed by a team):
Proximity devices (door protection only).
Emergency lighting (battery chargers and lights).
Braille Plates.
Telephones/Communication Devices (with existing wiring and box in place.
Fixture Cover Plates (no wiring).
Key switches/Security devices (with existing wiring, excluding full Fireman's Service
Operation).
Controller Wiring Changes (minor changes).
Fixture Replacement (in existing locations only).
Replacement of relays, timers, or mechanical devices with solid state devices and circuitry.
The replacement of equipment on existing elevator installations.
Other repair work assignments not listed above may be one man assignments providing there is no factor of safety involved.
Par. 3. When escalators are prepared and/or disassembled for cleaning, oiling, greasing, adjusting and minor replacement, (minor replacement meaning work requiring one (1) hour or less), the work shall not be classed as repair work.
When escalators are prepared and/or disassembled for cleaning, etc., purposes as mentioned above, and any replacement and/or repairs requiring more than one (1) hour, only the replacement and/or repairs shall be classed as repair work.
When escalators are prepared and/or disassembled primarily for replacement and/or repairs, all work shall be classed as repair work.
Par. 4. When men who are employed on contract service work perform any of the repair work listed above during hours other than between 6 A.M. and 6 P.M., Monday to Friday, inclusive, it shall be paid for at double the rate of single time. (Exception: employees performing one man repair while on call-backs shall be paid at 1.7 times the single time rate).
Par. 5. It is agreed the regular working day shall consist of eight (8) hours worked consecutively with an unpaid lunch period, between 6 A.M. and 6 P.M., five (5) days per week, Monday to
Friday, inclusive. All other working time shall be classed as overtime and paid for at double the rate of single time.
ARTICLE VIII(A)
Modernization Work
Par. 1. Modernization work is hereby defined as any and all work performed on apparatus enumerated in Article IV and Article IV(A) in any existing or occupied building, to bring equipment up to date, including general repairs which are a part of a modernization job.
Installation in existing unused hoistways shall be considered construction work unless such installation is part of modernizing an existing elevator or an entire group. However, a job which both the machine is changed out and the rails are removed or the machine is converted to a different type (e.g., hydro to traction, traction to hydro, traction to traction, drum to traction, drum to hydro, hydro to hydro) and all new rails are installed shall be construction work. An escalator modernization shall be defined as the replacement of any or all components except the truss including general repairs which may be a part of a modernization job. Any other general repairs and contract service work shall be excluded from this Article. Modernization work shall be exclusively performed by Elevator Constructor Mechanics, Elevator Constructor Helpers, Elevator
Constructor Apprentices and Elevator Constructor Assistant Mechanics.
Par. 2. It is agreed the regular working day shall consist of eight (8) hours worked consecutively with an unpaid lunch period, between 6 A.M. and 6 P.M., five (5) days per week, Monday to
Friday, inclusive. All other working time shall be classed as overtime and paid for at double the rate of single time.
Par. 3. Upon notification to the Local Business Representative or to the Regional Director, if the modernization job is outside the jurisdiction of a local union, the Company may establish shift work. Shift work shall not be permitted except in cases where at least two (2) shifts per day are established for at least five (5) or more consecutive days including Saturday, Sunday, or Holiday when worked. One of the shifts must be the "Day Shift" as defined in Par. 4 below. When special circumstances exist, such as production or operation needs of the customer, a second and third shift will be worked without any day shift when the Company and the Local Business Representative or
Regional Director, if the modernization job is outside the jurisdiction of the local union, have mutually agreed that one of the two (2) shifts does not have to be the "Day Shift."
Par. 4. It is agreed that the "Day Shift" shall consist of eight (8) hours between 8 A.M. and 4:30
P.M., five (5) days per week, Monday through Friday, inclusive.
Par. 5. The shift following the "Day Shift" shall work 7-1/2 hours between the hours of 4:30 P.M.
and 12:30 A.M. and shall receive eight (8) hours pay plus an additional 10% per hour. The shift preceding the "Day Shift" shall work seven (7) hours between the hours 12:30 A.M. and 8 A.M.
and shall receive eight (8) hours pay plus an additional 15% per hour.
Par. 6. Any and all work during hours other than the established hours for any one of the three shifts shall be paid at double the hourly wage rate including any premium rate of the assigned shift.
(a) When an employee is called in prior to the regular starting time for his shift or he works beyond the regular quitting time of his shift, he shall receive double the hourly wage rate of his assigned shift for all hours in excess of the established hours for his shift.
(b) When an employee is required to work hours that are not continuous with the established hours for his assigned shift he shall be paid for such hours at double the hourly wage rate of his assigned shift or double the hourly wage rate of the shift on which such excess hours are performed whichever rate is higher.
(c) When the Company assigns an employee to a shift the employee shall work that shift a minimum of five (5) consecutive days. However, should the Company reassign an employee to another shift prior to working five (5) consecutive days, or within twenty-four (24) hours of completing a shift, the employee shall receive the applicable overtime rate of the new shift he is assigned to for the first day only or the applicable overtime rate of the shift to which he had previously been assigned, whichever is higher, thereafter the employee shall receive the applicable rates for the new shift to which he is assigned. An employee who requests a shift reassignment and is reassigned as outlined herein, shall receive the applicable rates for the new shift to which he is assigned at single time only.
(d) When an employee has performed work on another job and he is directed to work on a shift job within twenty-four (24) hours after completing work on the other job, he shall receive the applicable overtime rate of his prior job or the applicable overtime rate of the shift to which he is assigned whichever rate is higher.
Par. 7. Any work performed on Saturday, Sunday, or Holiday shall be paid at double the hourly wage rate of the applicable shift including any premium rate.
Par. 8. In the case of the second and third shifts and for the purpose of fringe benefit computations, each employee who works a full shift shall be considered to have worked eight (8) hours.
Par. 9. The working hours set forth in Par. 4 and Par. 5 above may be changed by mutual agreement as provided in Article XXVI.
ARTICLE IX
Contract Service
Par. 1. Contract Service is hereby defined as any contract obtained by the Company for regular examination or care of apparatus enumerated in Article IV and Article IV(A) of this Agreement and general repairs as indicated in Article VIII, Par. 2 for a period of not less than one (1) month.
Contract Service Work shall be exclusively performed by Elevator Constructor Mechanics, Elevator Constructor Helpers, Elevator Constructor Apprentices and Elevator Constructor
Assistant Mechanics.
Par. 2. Two (2) Helpers, Apprentices or Assistant Mechanics to each three (3) Mechanics may be employed in contract service work. The Helper, Apprentice or Assistant Mechanic when working with the Mechanic shall perform all work assigned to him by the Mechanic.
A 70% Helper, a second year Apprentice, third year Apprentice, fourth year Apprentice or
Assistant Mechanic may work alone under the general supervision of the Mechanic in his assigned district provided such Helper, Apprentice or Assistant Mechanic is met on the first job daily. The
Helper, Apprentice or Assistant Mechanic shall notify the office and/or Mechanic when changing jobs and at the completion of the work day.
When working alone the Helper, second year Apprentice, third year Apprentice, fourth year
Apprentice or Assistant Mechanic shall perform only oiling, cleaning, greasing, painting, replacing of combplate teeth, relamping and fixture maintenance, the inspection, cleaning and lubrication of hoistway doors, car tops, bottoms, and pits, observing operation of equipment and at no time when working alone shall such a Helper, Apprentice or Assistant Mechanic perform any other work or function…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .