Questions and Answers Update - 25 Aug 20.pdf
PDF 102 KB Posted
- Attached to
- C-130 On-Call Maintenance Support Solicitation Federal contract opportunity
- Solicitation number
- FA8553-20-R-0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers Update - 01 Sep 20.pdf | ||
| Questions and Answers Update - 20 Aug 20.pdf | ||
| FA8553-20-R-0009-0003.pdf | ||
| PWS Revision 1.pdf | ||
| FA8553-20-R-0009-0002.pdf | ||
| FA8553-20-R-0009-0001.pdf | ||
| Wage Determinations.pdf | ||
| Questions and Answers 1.pdf | ||
| CLIN 0002 pricing spreadsheet.xlsx | XLSX spreadsheet | |
| QASP.pdf | ||
| CDRLs.pdf | ||
| FA8553-20-R-0009.pdf | ||
| Wage Determination.txt | TXT text file | |
| PWS.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8553‐20‐R‐0009 Royal Saudi Air Force (RSAF) C‐130 On‐Call Maintenance Support Questions & Answers #1
1. Question: Section K, page 21 of 36, please confirm that small business size standard is $35M.
Answer: The Government confirms the small business size standard is $35M under NAICS code 488190 IAW clause 52.204‐8.
2. Question: Section L, page 31 of 36, please provide the legend which Offerors are required to place at the bottom of each proposal page.
Answer: Insert the language IAW amendment 01 shown below:
SOURCE SELECTION INFORMATION ‐‐ SEE FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
3. Question: Section M, page 35 of 36, please confirm that given this is a Lowest Price Technically Acceptable evaluation and if more than one offer is received, that price reasonableness and price analysis techniques will not be applied.
Answer: Price competition will support a determination of price reasonableness. Price analysis will consist of comparison of competing price quotes. IAW section M volume II (A) amendment 01.
4. Question: Wage Determination Rates and Places of Performance – Please confirm that the only Wage Determination Rates provided with the RFP are those for the State of Maryland, Counties of Frederick and Montgomery. Given that because of the requirements for PWS 4.1.2 Place of Performance, with an unknown quantity and specific locations of places of performance, please provide guidance on how offerors are to complete the CLIN 0002 Pricing Spreadsheet when Wage Determination Rates for the various locations will/could be different.
Answer: Additional wage determinations have been added in amendment 01. These locations are IAW PWS para 1.3 flight schedules. Note CLIN 0002 pricing spreadsheet should be loaded rates IAW FAR 52.232‐7.
21 August 2020 Update
Note: Questions are listed by PWS paragraph in descending order followed by questions related to RFP language and CDRLs.
5. Reference: PWS paragraph 1.1
Question: Will RSAF C‐130H configurations be provided prior to award?
Answer: No, configurations will be provided after award for use at the call center IAW PWS paragraph 4.15.
Changes Made: No changes were made to the PWS as a result of this question.
6. Reference: PWS paragraph 2.0
Question: Can the Government please define what they mean by suspense date?
Answer: Completion Deadline.
7. Reference: PWS paragraph 4.1.2
Question: Since Place of Performance may be outside of the US, please clarify how local non‐US direct and indirect taxation (if any) such as but not limited to GST, VAT, corporate income tax...
not covered by tax Treaties would be processed.
Answer: Our office has not come across this issue in other On‐Call Maintenance efforts. The Government team and contractor will work together to resolve any issues if they come up.
8. Reference: PWS paragraph 4.3
Question: Paragraph 4.3 is repeated. First for 4.3 Repair, then 4.3 Holidays and Facility Closings.
Please clarify the numbering and whether or not a paragraph is missing.
Answer: PWS paragraph Holidays and Facility Closings has been changed to 4.3.3.
Changes Made: Corrected within PWS Rev 1 paragraph 4.3.3 dated 20 August 2020.
9. Reference: PWS paragraph 4.3.1
Question: Will all packing and shipping be T&M since it is unpredictable/unknown?
Answer: Packaging is part of the material and handling rate to be quoted in the CLIN 0002 Pricing Spread sheet.
10. Reference: PWS paragraph 4.6.1
Question: There is no paragraph 4.9.2. Did the Government mean instead paragraph 4.10.3 Initial Response Report? Please clarify.
Answer: The correct PWS paragraph reference is paragraph 4.10.3.
Changes Made: Corrected within PWS Rev 1 paragraph 4.6.1 dated 20 August 2020.
11. Reference: PWS paragraph 4.6.1
Question: Did the Government mean project lead contact instead of contract?
Answer: Yes. It should have stated contact.
Changes Made: Corrected within PWS Rev 1 paragraph 4.6.1 dated 20 August 2020.
12. Reference: PWS paragraph 4.6.3
Question: After award will contacts for the various locations be made available?
Answer: Locations will be made available to the contractor usually when they are alerted to a trip, and points of contacts will be given in case of an event.
13. Reference: PWS paragraph 4.6.4
Question: Will RSAF C‐130H Tech Order Library be made available?
Answer: Yes. The Technical Order Library will be provided after award for use at the call center IAW PWS paragraph 4.15.
14. Reference: PWS paragraph 4.6.3 and 4.6.4
Question: Does the contract cover other C‐130 variants when they are in CONUS or enroute (for example L‐100, C‐130J)?
Answer: Yes. The contract covers both C‐130H’s and C‐130J’s.
Changes Made: Corrected within PWS Revision 1 paragraphs 2.0, 4.6.3, 4.6.4 and 4.10.6 dated 20 August 20.
15. Reference: PWS paragraph 4.10.1
Question: Can the Government please clarify what the correct name of CDRLs A003 and A004 are?
Answer: The correct name for each CDRL is below:
CDRL A003: Meetings and Reviews Agenda CDRL A004: Meetings and Reviews Minutes.
Changes Made: PWS Section 4.2 has been corrected to reflect the correct CDRL names. See PWS Rev 1 dated 20 Aug 2020.
16. Reference: PWS paragraph 4.11
Question: The referenced CDRL is mislabeled as CDRL A010 DI‐MGMT‐81238/T, Contract Field Status Report, CFSR – Final Repair/Recovery Plan Price Estimate Report). The CDRL is not included in the CDRL pdf package. Could the Government correct the PWS reference and include the correct CDRL for MGMT‐81238/T?
Answer: This CDRL was referenced in error and has been removed from PWS paragraph 4.11.
Changes Made: Corrected within PWS Revision 1 paragraph 4.11 dated 20 August 2020.
17. Reference: PWS paragraph 4.15
Question: Will the contractor be able to acquire/purchase the necessary publications and technical data from the RSAF or USAF?
Answer: Technical data will be available for contractors to access, but some specialized data for the C‐130Js will require a relationship with the OEMs on the part of the contractor.
18. Reference: PWS paragraph 5.2.4
Question: Will the Government issue a DD254 and sponsor a Facility Clearance package should it become necessary?
Answer: Yes, the Government will issue a DD254 and sponsor a Facility Clearance package should it become necessary.
19. Reference: PWS paragraph 5.2.7
Question: Is it correct the Government will not require clearances?
Answer: Though the Government does not expect a need for security clearances, we cannot completely rule out the possibility. If security clearances are required, the Government will issue a DD254 and sponsor a Facility Clearance package should it become necessary.
20. Reference: RFP Section L, Volume Organization, Page 30 of 36
RFP Language:
Troubleshooting Ran engines found #2 and #4 propellers leaking excessively Repairs Remove and replace #3 and #4 props
Question: We believe this is a typo. If troubleshooting finds #2 and #4 props leaking, shouldn't the repair and replace be for #2 and #4?
Answer: Yes it should be #2 and #4 for both troubleshooting and repair.
Changes Made: RFP Section L, Volume Organization has been corrected within Amendment 3
(FA8553‐20‐R‐0009‐0003).
21. Reference: RFP Section L, Volume Organization, Page 30 of 36
Question: Due to the 25 page limit for the technical response and the amount of detail requested, will the Government consider a 10 point font for tables, charts, graphs, drawings, diagrams, supporting illustrations, spreadsheets, etc.?
Answer: Rather than allow a smaller font size, the Government has increased the page limit to 50 pages.
Changes Made: Corrected within PWS Revision 1 paragraph 4.11 dated 20 August 2020.
22. Reference: CDRLs A006, A007, and A008
Question: Does CDRL A008 require submission with initial response of A006 and A007?
Answer: A006 should be submitted before A008. However, it is acceptable to deliver both simultaneously.
Changes Made: No changes made.
23. Reference: CDRLs A001 and A002
Question: Given the nature of the on‐call maintenance, does the 60 day advance notice of shipping apply in CDRL A001 and A002?
Answer: No. We can't task any action in advance before an event.
Changes Made: No changes made.
25 August 2020 Update
Note: These questions are related to submitting proposals through the DODSAFE.
24. Question: Please confirm I will need to send Carson Best and Leon Castellano a separate email with the encryption password(s) I create when I upload the files.
Answer: Yes. You will need to send Carson Best and Leon Castellano a separate email with your encryption passwords.
Changes Made: No changes made to RFP or associated documents.
25. Question: I expect the combined file size of the documents will exceed the 8 GB maximum file size of a package. Please confirm I can submit the files in several individual package transfers and whether or not I will be able to use the same link you sent me for each upload.
Answer: A DODSAFE drop‐off link can only be used one time (only a single set of documents can be uploaded per link). There are two options for you to get us all of the documents.
a. The Government can send you a second drop‐off link for you to utilize.
b. You could zip/compress your files before you upload them.
The Government does not mind sending you another link if this is an easier method for you.
26. Question: I plan to upload 4 different files: PDF of signed and dated JV Agreement, PDF of
Volume I, PDF of Volume II, and PDF of Volume III. (I can also upload the Excel spreadsheet used to create Volume III if you also want that product.) Please confirm these files as I described them will be satisfactory and let me know which one or both the file formats you want for Volume III.
Answer: Your description of the format sounds acceptable. For Volume III, please be sure to include the CLIN 0002 Price Spreadsheet as explained in the General Instructions of Volume III.
As a general rule, the Government needs whatever pricing data that is necessary for us to determine the proposed price fair and reasonable. The excel sheet you describe sounds like useful information from your description and would most likely aid our analysis.