07_13_01852_PWS.docx

DOCX document 79 KB Posted

Attached to
REPAIR AN/APX-100 COMPONENT
Solicitation number
FA853914R01852
Issued by

About this file

PERFORMANCE-BASED STATEMENT OF WORK

View the file

Other files

File Type Posted
redated_J A_0015.pdf PDF
FA853914R01852.pdf PDF
CDRL_A002.pdf PDF
CDRL_A004.pdf PDF
CDRL_A003.pdf PDF
1248755_PKGRQMT_REPORT.pdf PDF
1248742_TRNSPDATA_REPORT.pdf PDF
1248940_CDRL1_REPORT.pdf PDF
13-01852_Signed_QASP.pdf PDF
DD_254_13-01852.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Program Title:
AN/APX-100 Repair
Purchase Request #:
FD2060-13-01852
Date; Revision #:
21 Oct 13; PWS Revision 1
1.0.DESCRIPTION OF SERVICES. This PWS, tasks the contractor to provide a depot level repair capability for the AN/APX-100 System in support of the Air Force Sustainment Center (AFSC), Supply Chain Management Operational Availability. The AN/APX-100 system is utilized on the C-5 aircraft. The contractor shall provide on-time repair and track and resolve any product quality deficiency reports (PQDRs). The contractor will also be required to comply with required safety mandates. By completing these actions, this contract requirement will directly have impact on reducing MICAPS, backorders and turn-around-time for depot customers.
2.0.SERVICES SUMMARY (SS). Table 1 shows the services summary.
Performance Objective
PWS Para.
Performance Threshold
Provide on-time repair of AN/APX-100 Line Repairable Units (LRUs)
4.2.3
The turnaround time required is 60 days After Receipt of Order (ARO)/Reparables (Reps), whichever is later with a minimum delivery of 4 per month; however, SURGE and MICAP requirements will be within 30 days ARO/Reps and will be shipped by fastest traceable means. These deliveries are subject to parts availability.
Track and resolve Product Quality Deficiency Reports (PQDR) on all listed items when necessary
4.2.5
Repair of each listed item will result in no more than one PQDR action per item per quarter deemed to be the fault of the contractor after the PQDR investigation.
Provide timely and accurate reporting in CAVAF.
4.3.1.1 & 4.3.1.2
All CAVAF transactions shall be accomplished daily or as transactions occur basis. The following metrics will be monitored:

· GFM In- Transit

· Repairable GFM Accountability Assets Not on Contract

Table 1: Services Summary

3.0.GOVERNMENT PROPERTY. Government property (including material, equipment, information, etc.) is not authorized IAW this PWS. The contractor shall furnish all material and parts necessary for the performance of these services.
4.0.GENERAL INFORMATION.
4.1.PLACE OF PERFORMANCE: The place of performance for this contract will be performed exclusively not on a U.S Government installation.
4.2.TECHNICAL REQUIREMENTS:
4.2.1.Handling: The contractor shall exercise care to prevent damage to government reparable assets while in its possession. The contractor shall store all government reparable assets in a secure area to provide protection against damage or loss. Storage areas shall provide protection against all adverse environmental conditions.
4.2.2Incoming inspection: An inspection shall be performed on the end-item upon its receipt at the contractor’s facility for proper identity and marking, visible damage, and completeness. Any deficiencies found as a result of the above inspection shall be brought to the attention of the government’s Quality Assurance Representative (QAR) and reported to the Contracting Officer through the Administrative Contracting Officer for disposition instructions.
4.2.3AN/APX-100 Repair: The contractor shall establish a depot repair capability that will assure a serviceable item that shall pass an Acceptance Test Procedures established by the Original Equipment Manufacturer (OEM). The turnaround time (TAT) required is 60 days ARO/Reps, whichever is later. However, SURGE and MICAP requirements will be within 30 days ARO/Reps and will be shipped by fastest traceable means. Contractor shall make every effort to expedite delivery of repaired units to meet fastest turnaround times possible. The minimum production quantity shall be 4 assets per month. The required deliveries are subject to parts availability; however, the contractor shall notify the government of this situation before the required delivery date.
4.2.4Quality Control: The contractor’s quality system shall be established and maintained IAW AFMC Form 807. The contractor’s quality program shall be ISO 9001:2008, Quality Management Systems Requirements, and shall be available for cognizant government Quality Assurance Representative (QAR) review and acceptance prior to beginning repair.
4.2.5Corrective Action For Defects Reported: When requested, the contractor shall assist the cognizant contract administering organization in evaluation of Deficiency Report (DR) exhibits to determine root cause of deficiencies reported from the depot organizations. This will be conducted IAW T.O. 00-35D-54, USAF Deficiency Reporting and Investigation System. Timely correction and reporting of defects found and corrective action to prevent repeated discrepancies shall be an integral part of the contractor’s quality procedures. In the event the exhibit is tested and shows no sign of malfunction, i.e., retest OK (Retok), the contractor will annotate this, notify the multifunctional team through the ACO to determine cost and disposition instructions. If corrective action is required, it will also extend to the performance of all sub-contractors and will be responsive to data and product forwarded from users. The complete processing of Material Deficiency Report (MDR)/Quality Deficiency Report (QDR) shall be at no additional cost to the Government. Repair of each listed item will result in no more than one PQDR action per item per quarter deemed to be the fault of the contractor after the PQDR investigation.
4.2.6Accessory And Component Reuse, Repair And Replacement: Expense parts of an end-item determined defective shall be replaced with equivalent serviceable parts. Materials/parts used for replacement shall be selected in accordance with MIL-HDBK 5400, Para 4.3.1, Electronic Equipment, Airborne General Guidelines.
4.2.7Condemnation: The contractor shall identify to the ACO any end items(s) when the expected cost of the effective repair of the unit exceeds 75% of the hardware replacement cost of the unit. Candidates for condemnation will be reported to the cognizant government QAR and to the CO through the ACO for final determination and disposition instructions by the IFF Integrated Product Team (IPT).
4.2.8Obsolete Parts: Should the contractor incur a requirement for replacement parts that have become obsolete, the contractor shall pursue all normal methods to procure a replacement. If no suitable replacement can be found, the contractor will terminate the repair and request the government condemn the item or provide other means of disposition.
4.2.9Preservation: While in the possession of the Contractor, the end-item(s) shall be handled and stored in such a manner to preclude damage by handling, weather, or foreign matter.
4.2.10Ozone Depleting Chemicals: The contractor shall not require the use of Ozone Depleting Chemicals/Substances (ODC/ODS) in any of the processes or products that may be required under this effort.
4.2.11Work Requirements
4.2.11.1Work performed under this PWS includes all actions necessary to return the end item to a serviceable condition.
4.2.11.2Neither design nor functional capabilities shall be changed, modified, or altered except when an Engineering Order (EO) is submitted and approved IAW ANSI/EIA-649-A, National Consensus Standard for Configuration Management. Any changes made without written approval from the procuring agency shall require removal at the contractor’s expense.
4.2.11.3Changes to the configuration shall be made only by governmental authority.
4.2.11.4The contractor shall implement, when applicable, an Electrostatic Discharge (ESD) Control Program for all Electrostatic Sensitive Devices in accordance with MIL-STD-129P, Marking for Shipping and Storage; MIL-STD-1686C, ESD Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment; MIL-HDBK-263B, Electrostatic Discharge Control Handbook for Protection of Electrical Equipment and Electronic Parts, Assemblies and Equipment; and T.O. 00-25-234, General Electronic Shop Procedures, Section VII.
4.2.11.5Inspection and Functional Test: Prior to the initial functional test, an inspection shall be conducted to determine if any visual defects exist, such as, loose wires or components, broken or missing parts, burned components, foreign matter, or corrosion. After these defects, if any, have been corrected, a functional test is to be performed. Deficiencies discovered shall be corrected. Further inspection shall be made to determine and correct any additional defects and to determine if additional disassembly of the SRU is required. A complete inspection and functional test of the SRU shall be accomplished upon completion of subsequent repair prior to acceptance.
4.3.OTHER REQUIREMENTS:
4.3.1COMMERICAL ASSET VISIBILITY AF (CAVAF):

4.3.1.1 The contractor shall report using the Commercial Asset Visibility (CAVAF). (CDRL A001, Data Item Description, DI-MGMT-81634B). The contractor shall provide data related to the tasks and efforts conducted for each repairable unit. If CAVAF training is required, send an email to: 406scms.cav.af.ar@robins.af.mil. The contractor shall conduct production reporting on a daily or as transactions occur basis. The contractor shall obtain a valid DoD PKI certificate to log into CAVAF. Each user shall be required to have a "medium assurance certificate." Each contractor employee accessing CAVAF will need an External Certificate Authority (ECA) Medium Token Assurance (Federal Information Processing Standards (FIPS) 140 Level 2. Registration Authority): A "Medium Token Assurance" certificate is a hardware based certificate, and is stored on a FIPS 140-2 Level 2 or higher cryptographic device (either a Smart Card or a USB device). This is a portable certificate and can be used on any computer where the utilities drivers have been installed. A Medium Token Assurance certificate is a higher assurance level certificate than a software based certificate. Identity proofing must be done in-person, but can be performed by an ECA Registration Authority, Trusted Agent, Notary, or Authorized DoD Employee (outside the United States). All CAVAF transactions shall be accomplished daily or as transactions occur basis.

4.3.1.2 Reports generated from the Commercial Asset Visibility Air Force (CAVAF) data system will be reviewed by HQ AFMC and 638 Supply Chain Management Group. Noncompliance of CAVAF reporting will be addressed and documented at Program Management Reviews (PMRs) or at separate meeting(s) as designed by the Government Program Manager. The contractor shall enter the receipt of all government property upon arrival within one day of receipt. Accountability of all government items at the contractor's facility shall be visible for tracking in CAVAF. Reporting shall ensure accountability for Government Furnished Material (GFM), In-Transit, repairable GFM, and assets that are not on Contract. Collected metrics will used to document performance. The Contractor shall notify the Government of any personnel changes impacting supplier reporting performance. Any delayed entries shall not exceed three calendar days and no more than one late entry per Performance Assessment Report (PAR) will be acceptable.

4.3.2.PERFORMANCE OF SERVICE DURING CRISIS: The Functional Commander/Director has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.237-7023, Continuation of Essential Contractor Services and AFI 10-403, Deployment Planning and Execution, paragraph 1.9.1.33.
4.3.3.INSPECTION OF SERVICES CLAUSE: The Federal Acquisition Regulation (FAR) 52.212-4, Contract Terms and Conditions – Commercial Items, gives the Government the right to inspect Contractor Performance.
4.3.4.GOVERNMENT SECURITY REQUIREMENTS:

4.3.4.1. Knowledge and/or generation of classified and/or controlled unclassified information are required for performance of the contract/order. The Contractor shall ensure applicable Contractor personnel have security clearances at the appropriate clearance level.

4.3.4.2. Government Security Regulations: The Contractor shall ensure personnel, information, system, property, facility, and international security requirements are met. The Contractor shall comply with Government Security regulations including, DoD 5200.2-R, Personnel Security Program; DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM); DoDD 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual; and AFI 31-101, Integrated Defense.

4.3.4.3. Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall ensure compliance with DoDD 5205.02E, DoD Manual 5205.02-M, and other applicable Government security regulations including procedures to protect classified and/or controlled unclassified information, Government projects and/or programs.

4.3.4.4. Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or controlled unclassified information in accordance with DoD 5220.22-M and other applicable Government security regulations. Applicable Government property, including equipment, shall be safeguarded, maintained, and operated in accordance with DoD 5220.22-M and other applicable Government security regulations.

4.3.4.5. Security Clearance: The Contractor shall ensure applicable Contractor personnel have security clearances at the Confidential level for proper accomplishment of contract/order requirements. The security clearance shall be obtained in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification. Contractor personnel whose clearances have been suspended or revoked shall immediately be denied access to classified and/or controlled unclassified information.

4.3.4.6. Security Incident or Violation: The Contractor shall immediately notify the Facility Security Office of any potential or actual security incident or violation including potential or actual unauthorized disclosure or compromise of classified and/or controlled unclassified information.

4.3.4.7. Security of Contractor Systems(s): The Contractor shall ensure the security of automated information systems at the Contractor’s facility to preclude potential security incidents or violations including potential unauthorized disclosure or compromise of classified and/or controlled unclassified information.

4.3.4.8. Access to Government Systems: The Government will provide Contractor personnel access to systems necessary to perform tasks under the contract/order. The contractor shall ensure contractor personnel who require access to any classified or unclassified AIS that requires a security clearance have the appropriate security investigation for that system. The Government will provide system access subject to approval of the DD Form 2875, System Authorization Access Request (SAAR). Upon completion/termination of the contract/order or transfer/termination of Contractor personnel, the system account will be closed.

4.3.5. SAFETY REQUIREMENTS:

While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Government Representative (GR), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.

Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated GR, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

4.3.6. CONTRACTOR MANPOWER REPORTING REQUIREMENTS: Per reference SAF/AQ Memos dated 13 Nov 12 and 11 Jun 13, “The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the USAF via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil (select Dept of the Air Force option if you you’re working an AF requirement). Reporting inputs will be for the labor executed during the period of performance for each U.S. Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.”

4.3.6.1. Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

4.3.6.2. User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for U.S. Government personnel and contractors are available at the CMRA link at http://www.ecmra.mil (select Dept of the Air Force option if you you’re working an AF requirement).

4.3.7.PROCEDURE FOR INVOICING/PAYMENT/ACCEPTANCE: The multi-functional team (MFT) can request that data items be attached to acceptance forms through Wide Area Work Flow (WAWF) or submitted to Government personnel as spelled out in the data Contract Data Requirements List (CDRL). To allow for payment of separately priced data items, the MFT must use WAWF for acceptance. Data CDRL will determine submittal requirements; however, both separately priced and non-separately priced items must be accepted in WAWF in order for the line item to be closed out in the contract. Information regarding Wide Area Work Flow-Receipt and Acceptance is available on the Internet at https://wawf.eb.mil.
4.3.8.ENVIRONMENTAL REQUIREMENTS: In accordance with Robins AFB environmental specification 01560, the contractor shall comply with all applicable Federal, any laws and regulations from other states where disposal might occur, and local laws and regulations concerning environmental compliance and pollution prevention. Ensure all products produced or generated under contract shall meet all stated performance objectives and shall not violate in any manner the Environmental Requirements of any applicable local, state, or federal entity including the Department of Defense (DoD).
4.3.9.GREEN PROCUREMENT PROGRAM (GPP): GPP is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services. GPP requirements apply to all acquisitions using U.S. Government appropriated funds, including services and new requirements. The Agency Affirmative Procurement Program applies and requires that the products purchased which are included in the Comprehensive Procurement Guidelines (CPG) contain recovered materials, unless the item cannot be acquired: (a) competitively within a reasonable timeframe; (b) meet appropriate performance standards, or (c) at a reasonable price. The prime contractor shall be responsible for ensuring that all subcontractors comply with this requirement.

4.3.10. PACKAGING AND HANDLING: Equipment shall be handled and stored in such a manner as to prevent damage and theft. (MIL-STD-2073-1d, 10 May 02, Standard Practice for Military Packaging and MIL-STD-129P (4), 19 Sep 07, Military Marking for Shipment and Storage). When shipping containers are received that meet the requirements of the AFMC Form 158, Packaging Requirements, and are suitable for return shipment of serviceable assets, they shall be reclaimed, stored and protected for reuse. Unserviceable containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158, Packaging Requirements. Items received which are misidentified, misdirected, or have AF recoverable modules/subassemblies missing shall be reported to the PCO for disposition instructions.

4.3.11. ITEM UNIQUE IDENTIFICATION (IUID) REQUIREMENTS: The IUID Program requires each qualifying Air Force (AF) asset to be uniquely identified with a permanent marking that can sustain its information throughout the life of the asset. The program addresses two categories of assets—those already in the AF inventory and those currently under contract but not currently in the AF inventory. For assets under contract, IUID requirements are specified in Defense Federal Acquisition Regulation Supplement (DFARS) 252.211-7003, Item Identification and Valuation and Department of Defense (DoD) 4100.39-M, Federal Logistics Information System (FLIS). All assets subject to marking must be recorded in the DoD IUID Registry.

4.3.11.1 IUID MARKING PLAN. The Contractor’s IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130N, DoD Standard Practice Identification Marking of US Military Property. The plan must be approved by the Government Engineering organization, prior to implementation. (CDRL A003, DI-MGMT-81803)

4.3.11.2 IUID MARKING ACTIVITY AND VERIFICATION REPORT. The contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. (CDRL A004, DI-MGMT-81804)

4.3.12. COUNTERFEIT PREVENTION PLAN (CPP): Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. (CDRL A002, DI-MISC-81832, Fraudulent/Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition)

4.3.12.1. At a minimum, the CPP shall address:

4.3.12.1.1. Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.

4.3.12.1.2. Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H)

4.3.12.1.3. Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A)

4.3.12.1.4. Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)

4.3.12.1.5. Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)

4.3.12.1.6. Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, paragraph 4.1.4, 4.1.5, appendix E)

4.3.12.1.7. Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, paragraph 4.1.4, appendix E)

4.3.12.1.8. Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS5553, paragraph 4.1.6, appendix F)

4.3.12.1.9. Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI). The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, paragraph 4.1.7, appendix G)

4.3.12.1.10. Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.

5.0. APPENDICES.

Appendix A, References.

Publication Number
Publication Title
Publication Date
Specific Paragraph Reference
ISO 9001:2008
Quality Management Systems Requirements
1 Dec 08
Entire
T.O. 00-35D-54
USAF Deficiency Reporting, Investigation, and Resolution
1 Nov 11
Entire
MIL-HDBK-5400
Electronic Equipment, Airborne General Guidelines
30 Nov 95
4.3.1
ANSI/EIA-649-A
National Consensus Standard for Configuration Management
28 Oct 04
Entire
MIL-STD-129P With Change 4
Military Marking for Shipment and Storage
Sep 2007
Entire
MIL-STD-1686C
Electrostatic Discharge Control Program
25 Oct 95
Entire
MIL-HDBK-263B
Electrostatic Discharge Control Handbook for Protection of Electrical Equipment and Electronic Parts, Assemblies and Equipment
13 Jul 94
Entire
T.O. 00-25-234
General Shop Practice Requirement for the Repair Maintenance and Test of Electrical Equipment
Aug 1998; Chg 39, 21 Jul 11
Section VII
AFI 10-403
Deployment Planning and Execution
20 Sep 12
1.9.1.33
DFARS 252.237-7023
Continuation of Essential Contractor Services and
Oct 2010
Entire
FAR 52.212-4
Contract Terms and Conditions – Commercial Items
Feb 2012
Entire
DoD 5220.22-M
National Industrial Security Program Operating Manual (NISPOM)
28 Mar 13
Entire
AFI 31-101
Integrated Defense
2 Aug 04
Entire

DoDD 5205.02E

DoD Operations Security
20 Jun 12
Entire
DoD Manual 5205.02-M
DoD Operations Security (OPSEC) Program Manual
3 Nov 08
Entire
DoD 5200.2-R
Personnel Security Program
23 Feb 96
Entire
Public Law 91-596
Occupational Safety and Health Act (OSHA)
1 Jan 04
Sec 5-6
(DODD 4715.1E)
Environmental, Safety, and Occupational Health (ESOH)
19 Mar 05 http://www.dtic.mil/whs/directives/corres/pub1.html
Entire
IAW AFI 91-204
Safety Investigations and Reports
9 Aug 12 http://www.e-publishing.af.mil
Paragraph 2.12
SAF/AQ Memo 11 Jun 13 and SAF/AQ Memo, 13 Nov 12
Implementation of FY11 NDAA 8108, Contractor Inventory Requirements
11 Jun 13 and 13 Nov 12
Entire
RAFB 01560
Environmental Requirements
Feb 2013
See Part 1
MIL-STD-2073-1d
Standard Practice for Military Packaging
10 May 02
Entire
DFARS 252.211–7003
Item Identification and Valuation
Jun 2011
Entire
DoD 4100.39-M
Federal Logistics Information System
May 2010 and Change Letter Oct 2010
Entire
MIL-STD-130N
DoD Standard Practice Identification Marking of US Military Property
17 Dec 07
Entire

FD2060-13-01852; 21 Oct 13; PWS Revision 1

File details come from the government source that posted it. Updated .