T56_Q&A_2.docx

DOCX document 15 KB Posted

Attached to
T56 Noise Suppressor
Solicitation number
FA8533-17-R-0003
Issued by

About this file

Q&A 2

View the file

Other files

File Type Posted
FA853317R00030004.pdf PDF
FA853317R0003_______0003.pdf PDF
T-56_Enclosure,_Appendix_B.doc DOC document
FA853317R0003_______0002.pdf PDF
T56_Q&A.docx DOCX document
T-10_Enclosure_for_T-56_Engine_GUEE-16-021(v1).docx DOCX document
FA853317R0003_______0001.pdf PDF
PWST56Enclosure.pdf PDF
FA8533-17-R-0003.pdf PDF
T-56_CDRLS_signed.pdf PDF
PastPerformancequestionnaire.docx DOCX document
FACT-SHEET.docx DOCX document
AFMC158.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T56 Enclosure Solicitation # FA8533-17-R-0003- Question & Answers 2

1) Drawing sheet S002-05 shows a stainless steel honeycomb structure located in the moveable enclosure assembly. There is a note on this drawing that reads, "AS-BUILT NOTE: HONEYCOMB FLOW CONDITIONER NOT INSTALLED." We have noted that these are not installed in the existing T-56 at Hulbert Field which was referenced in paragraph 4.2 of the PWS.

Is the intention to provide but not include installation of this item? Or, should this item be omitted altogether?

Response: Please do not omit, and include as required per PWS. Please see below:

4.2 Task Requirements: The standard Enclosure configuration covered in this PWS is defined by the Enclosure drawing package and technical order, and the existing Enclosures at Hurlburt Field. After the Hurlburt Field Enclosures were installed, a necessary modification was noted to protect operability. This modification, which is not reflected in the drawing package, is described in Section 4.2.2. The new Enclosures shall include this modification and the contractor shall submit non-proprietary new and/or redlined drawings in USAF format to capture the modification and any associated changes.

4.2.2.2 The Contractor shall install structural load path plates as per the diagrams in Appendix B. The Contractor shall not deviate from the diagram without the approval of AFLCMC/WNZ. The Contractor shall submit new and/or redlined versions of drawings as appropriate to document plates as installed.

2) In paragraph 4.2 of the PWS, it indicates there is a modification to the T-56 that is not reflected in the drawing package, but is required to be included on the new T-56 enclosures. This modification in described in paragraph 4.2.2, and in paragraph 4.2.2.2 it refers to part of this modification as the installation of, "structural load path plates as per the diagrams in Appendix B." It also limits deviations from the referenced diagram.

We are not able to locate Appendix B in the PWS, or as a separate document within the solicitation package. Please provide Appendix B accordingly.

Response: See Appendix B attached.