R11ChangePage208May2013.pdf

PDF 27 KB Posted

Attached to
A/S32 R-11 Refueler Federal contract opportunity
Solicitation number
FA8533-12-R-35653
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Performance Specification Change Page 2

View the file

Other files for this federal contract opportunity

Other files attached to A/S32 R-11 Refueler, newest first.
File Type Posted
Questions_and_Answers_23_May_2013.docx DOCX document
Question_and_Answer_13_May_2013.docx DOCX document
Questions_and_Answers_08_May_2013.docx DOCX document
FA853312R35653_0003.pdf PDF
R11ChangePage130Apr2013.pdf PDF
Questions_and_Answers_3_May_2013.docx DOCX document
FA853312R35653_0002.pdf PDF
B001TMCR.pdf PDF
Questions_and_Answers_25_April_2013.docx DOCX document
FA8533-12-R-35653-0001.pdf PDF
EDL.pdf PDF
GeneralEngineeringNotes.pdf PDF
RequestforDeviation.pdf PDF
ConferenceMinutes.pdf PDF
TechnicalReportStudyServicesServiceBulletin.pdf PDF
R11TMCRB001.pdf PDF
ContractorsProgressStatusManagementReport.pdf PDF
SystemSafetyHazardAnalysisReport.pdf PDF
FA853312R35653_FINAL.pdf PDF
Attachment1QuantityRanges.doc DOC document
TechnicalReportStudyServicesTechnicalReviewData.pdf PDF
SPI.pdf PDF
EngineeringChangeProposal.pdf PDF
ProductBaselineIndex.pdf PDF
ConferenceAgenda.pdf PDF
TestInspectionReport.pdf PDF
SystemSafetyProgramPlan.pdf PDF
Form158.pdf PDF
NoticeofRevision.pdf PDF
TestProcedure.pdf PDF
R11SOW27Mar2013.pdf PDF
TechnicalReportStudyServices.pdf PDF
InstructionalMediaPackage.pdf PDF
MILPRF32080E.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIL-PRF-32080E Change Page 2 08 May 2013

1. Paragraph 3.10.14 shall now read as follows:

“3.10.14 Deadman control system (DCS). A deadman device shall be provided as part of the DCS and shall be (1) air operated, and (2) used to initiate or terminate the flow of fuel in all fueling modes at the single-point and overwing hose reels, hydrant pit outlet, and at the emergency tank valve when activating or deactivating the deadman device.

Deactivating the deadman device shall reduce engine speed to idle. After reactivation of the deadman device, the flow shall resume within 15 seconds. The deadman device shall be operable while wearing arctic mittens and MOPP Level 4 Chemical Warfare Gear and shall allow the operator to range from the operator control panel to the full length of the servicing hose(s). A momentary-on push button for rewinding the deadman hose reel shall be provided and shall be conveniently located on the operator control panel such that the operator can guide the deadman hose with one hand while operating the rewind control button with the other hand. It shall be capable of retracting the fully deployed deadman hose and device within one minute. The deadman hose shall have a minimum length of 80 feet. A fairlead shall guide the hose during deployment or rewind.”

2. In paragraph 3.10.1 Piping. The following sentence "Piping shall be not less than schedule 40 seamed or seamless aluminum in accordance with ASTM B241/B241M or schedule 10 stainless steel and shall disassemble in sections.”

Shall be changed as follows:

“The piping shall be seamless schedule 40 aluminum in accordance with ASTM B241/B241M or seamless schedule 10 TP 304L stainless steel in accordance with ASTM A312/A312M.”

File details come from the government source that posted it. Updated .